ASTM C1479-2007 Standard Practice for Installation of Precast Concrete Sewer Storm Drain and Culvert Pipe Using Standard Installations《使用标准设备安装预制混凝土污水管、雨水管和排水管的标准实施规范》.pdf
《ASTM C1479-2007 Standard Practice for Installation of Precast Concrete Sewer Storm Drain and Culvert Pipe Using Standard Installations《使用标准设备安装预制混凝土污水管、雨水管和排水管的标准实施规范》.pdf》由会员分享,可在线阅读,更多相关《ASTM C1479-2007 Standard Practice for Installation of Precast Concrete Sewer Storm Drain and Culvert Pipe Using Standard Installations《使用标准设备安装预制混凝土污水管、雨水管和排水管的标准实施规范》.pdf(9页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: C 1479 07Standard Practice forInstallation of Precast Concrete Sewer, Storm Drain, andCulvert Pipe Using Standard Installations1This standard is issued under the fixed designation C 1479; the number immediately following the designation indicates the year oforiginal adoption or, in the
2、case of revision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon (e) indicates an editorial change since the last revision or reapproval.1. Scope1.1 This practice covers the installation of precast concretepipe intended to be used for t
3、he conveyance of sewage,industrial wastes, and storm water and for the construction ofculverts.1.2 A complete metric companion to this practice has beendevelopedC 1479M; therefore, no metric equivalents arepresented in this practice.1.3 This standard does not purport to address all of thesafety conc
4、erns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate safety and health practices and determine the applica-bility of regulatory limitations prior to use.2. Referenced Documents2.1 ASTM Standards:2C 822 Terminology Relating to Concrete
5、Pipe and RelatedProductsC 1417 Specification for Manufacture of Reinforced Con-crete Sewer, Storm Drain, and Culvert Pipe for DirectDesignC 1479M Practice for Installation of Precast ConcreteSewer, Storm Drain, and Culvert Pipe Using StandardInstallations MetricD 698 Test Methods for Laboratory Comp
6、action Character-istics of Soil Using Standard Effort (12,400 ft-lbf/ft3(600kN-m/m3)D 1557 Test Methods for Laboratory Compaction Charac-teristics of Soil Using Modified Effort (56,000 ft-lbf/ft3(2,700 kN-m/m3)D 2487 Practice for Classification of Soils for EngineeringPurposes (Unified Soil Classifi
7、cation System)D 2488 Practice for Description and Identification of Soils(Visual-Manual Procedure)IEEE/ASTM SI 10 Standard for Use of the InternationalSystem of Units (SI): The Modern Metric System2.2 AASHTO Standards:3Standard Specifications for Highway BridgesM 145 Classification of Soils and Soil
8、Aggregate Mix-tures for Highway Construction PurposesT99 The Moisture-Density Relations of Soils Using a 5.5 lb(2.5 kg) Rammer and a 12-in. (305 mm) DropT 180 The Moisture-Density Relations of Soils Using a 10lb (4.54 kg) Rammer and an 18-in. (457 mm) DropT 310 In-Place Density and Moisture Content
9、of Soil andSoilAggregate by Nuclear Methods (Shallow Depth)2.3 ASCE Standards:4ASCE 15 Standard Practice for the Direct Design of BuriedPrecast Reinforced Concrete Pipe Using Standard Instal-lations (SIDD)3. Terminology3.1 For definitions of terms relating to concrete pipe, seeTerminology C 822.3.2
10、For terminology related to soil classifications, see Prac-tice D 2487 and Practice D 2488.3.3 For terminology and definitions of terms relating tostructural design, see ASCE 15.3.4 Fig. 1 illustrates the definitions and limits of the terms:foundation, subgrade, bedding, outer bedding, middle bedding
11、,haunch, lower side, backfill or overfill, invert, crown, spring-line, top of pipe, and bottom of pipe as used in this practice.1This practice is under the jurisdiction of ASTM Committee C13 on ConcretePipe and is the direct responsibility of Subcommittee C13.05 on Special Projects.Current edition a
12、pproved April 1, 2007. Published April 2007. Originallyapproved in 2000. Last previous edition approved in 2001 as C 1479 01.2For referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information,
13、refer to the standards Document Summary page onthe ASTM website.3Available from American Association of State Highway and TransportationOfficials (AASHTO), 444 N. Capitol St., NW, Suite 249, Washington, DC 20001,http:/www.transportation.org.4Available from American Society of Civil Engineers (ASCE),
14、 1801 AlexanderBell Dr., Reston, VA 20191, http:/www.asce.org.1Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959, United States.4. Significance and Use4.1 This practice is useful as a reference by an owner andthe owners engineer in preparing project s
15、pecifications.5. NotationsDi= inside diameter of pipe, in.Do= outside diameter of pipe, in.H = design height of earth above top of pipe, ft.w = unit weight of soil, lb/ft3.6. Standard Installations6.1 The precast concrete pipe/soil system shall be con-structed to conform to the requirements of FigsF
16、igs. 2 and 3and Tables 1 and 2 as designated on the plans.7. Excavation7.1 When rock or other unyielding foundation material isencountered, it shall be removed at least to the requirementsshown in Figs. 2 and 3 and Tables 1 and 2. Overexcavatedareas shall be backfilled with approved materials and co
17、m-pacted to at least the standard proctor density specified for thebedding.7.2 Where surface water or groundwater conditions exist,the site and trench shall be dewatered.8. Foundation8.1 The foundation shall be moderately firm to hard in situsoil, stabilized soil, or compacted fill material.8.2 When
18、 unsuitable or unstable material is encountered,the foundation shall be stabilized.8.3 Methods to prevent migration of soil fines shall beprovided when groundwater or existing soil conditions areconducive to particle migration. Gravelly soils, with little or nofines, could migrate under certain cond
19、itions, causing lack ofsupport.8.4 Pipe installed over an unyielding foundation shall becushioned so as to prevent blasting shock when future blastingis anticipated in the area.FIG. 1 Pipe/Installation TerminologyC14790729. Bedding9.1 The bedding shall be constructed uniformly over the fulllength of
20、 the pipe barrel, as required for the designatedstandard installation, to distribute the loadbearing reactionuniformly on the pipe barrel over its full length, and tomaintain the required pipe grade. See Fig. 4. If placed in layers,the thickness of the layers shall be as required to achieve thespeci
21、fied compaction and as required by the project specifica-tions.9.2 The bedding layers for standard installation Types 1, 2,and 3 shall be placed to be as uniform as possible, but shall beloosely placed uncompacted material under the middle third ofthe pipe prior to placement of the pipe.9.3 The maxi
22、mum aggregate size shall be 1 in. when thebedding thickness is less than 6 in. and 112-in. when thebedding thickness is 6 in. or greater, except as noted in 9.4.9.4 When in situ soils conforming to project specificationsare used in constructing the bedding for Type 3 and 4installations, the maximum
23、aggregate size shall not be greaterthan 3 in., or half the bedding thickness, whichever is less.9.5 Bell holes shall be excavated in the bedding or founda-tion, or both, when installing pipe with expanded bells so thatthe pipe is supported by the barrel and not by the bells. See Fig.4.9.6 Any outer
24、bedding under the lower side areas shall becompacted to at least the same requirements as for the lowerside areas.10. Pipe Placement and Joining10.1 Pipe shall be installed to the line and grade shown onthe project plans and specifications. The joint shall be asspecified in the project specification
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMC14792007STANDARDPRACTICEFORINSTALLATIONOFPRECASTCONCRETESEWERSTORMDRAINANDCULVERTPIPEUSINGSTANDARDINSTALLATIONS

链接地址:http://www.mydoc123.com/p-464795.html