ASME PCC-2-2008 Repair of Pressure Equipment and Piping (PCC-2 - 2008)《压力设备和管道的维修》.pdf
《ASME PCC-2-2008 Repair of Pressure Equipment and Piping (PCC-2 - 2008)《压力设备和管道的维修》.pdf》由会员分享,可在线阅读,更多相关《ASME PCC-2-2008 Repair of Pressure Equipment and Piping (PCC-2 - 2008)《压力设备和管道的维修》.pdf(218页珍藏版)》请在麦多课文档分享上搜索。
1、AN AMERICAN NATIONAL STANDARDRepair of Pressure Equipment and PipingASME PCC-22008(Revision of ASME PCC-22006)Copyright ASME International Provided by IHS under license with ASME Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-ASME PCC-22008(Revision of ASME PCC-22
2、006)Repair ofPressureEquipmentand PipingAN AMERICAN NATIONAL STANDARDCopyright ASME International Provided by IHS under license with ASME Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-Date of Issuance: April 7, 2009This Standard will be revised when the Society a
3、pproves the issuance of a new edition. This Standardwill become effective 6 months after the Date of Issuance. There will be no addenda issued to thisedition.ASME issues written replies to inquiries concerning interpretations of technical aspects of thisdocument. Interpretations are published on the
4、 ASME Web site under the Committee Pages athttp:/cstools.asme.org as they are issued.ASME is the registered trademark of The American Society of Mechanical Engineers.This code or standard was developed under procedures accredited as meeting the criteria for American NationalStandards. The Standards
5、Committee that approved the code or standard was balanced to assure that individuals fromcompetent and concerned interests have had an opportunity to participate. The proposed code or standard was madeavailable for public review and comment that provides an opportunity for additional public input fr
6、om industry, academia,regulatory agencies, and the public-at-large.ASME does not “approve,” “rate,” or “endorse” any item, construction, proprietary device, or activity.ASME does not take any position with respect to the validity of any patent rights asserted in connection with anyitems mentioned in
7、 this document, and does not undertake to insure anyone utilizing a standard against liability forinfringement of any applicable letters patent, nor assumes any such liability. Users of a code or standard are expresslyadvised that determination of the validity of any such patent rights, and the risk
8、 of infringement of such rights, isentirely their own responsibility.Participation by federal agency representative(s) or person(s) affiliated with industry is not to be interpreted asgovernment or industry endorsement of this code or standard.ASME accepts responsibility for only those interpretatio
9、ns of this document issued in accordance with the establishedASME procedures and policies, which precludes the issuance of interpretations by individuals.No part of this document may be reproduced in any form,in an electronic retrieval system or otherwise,without the prior written permission of the
10、publisher.The American Society of Mechanical EngineersThree Park Avenue, New York, NY 10016-5990Copyright 2009 byTHE AMERICAN SOCIETY OF MECHANICAL ENGINEERSAll rights reservedPrinted in U.S.A.Copyright ASME International Provided by IHS under license with ASME Not for ResaleNo reproduction or netwo
11、rking permitted without license from IHS-,-,-CONTENTSForeword ivPreparation of Technical Inquiries vCommittee Roster . viSummary of Changes viiPart 1 Scope, Organization, and Intent 1Part 2 Welded Repairs . 5Article 2.1 Butt-Welded Insert Plates in Pressure Components 5Article 2.2 External Weld Over
12、lay to Repair Internal Thinning . 11Article 2.3 Seal-Welded Threaded Connections and Seal Weld Repairs 17Article 2.4 Welded Leak Box Repair . 19Article 2.5 Welded Lip Seals (in the course of preparation) . 23Article 2.6 Full Encirclement Steel Reinforcing Sleeves for Piping . 24Article 2.7 Fillet We
13、lded Patches With Reinforcing Plug Welds . 31Article 2.8 Alternatives to Traditional Welding Preheat . 37Article 2.9 Alternatives to Postweld Heat Treatment . 42Article 2.10 In-Service Welding Onto Carbon Steel Pressure Components orPipelines 45Article 2.11 Weld Buildup, Weld Overlay, and Clad Resto
14、ration . 57Article 2.12 Fillet Welded Patches 63Article 2.13 Threaded or Welded Plug Repairs 68Part 3 Mechanical Repairs 71Article 3.1 Replacement of Pressure Components 71Article 3.2 Freeze Plugs . 73Article 3.3 Damaged Threads in Tapped Holes . 78Article 3.4 Flaw Excavation and Weld Repair 88Artic
15、le 3.5 Flange Repair and Conversion . 94Article 3.6 Mechanical Clamp Repair 97Article 3.7 Pipe Straightening or Alignment Bending . 101Article 3.8 Damaged Anchors in Concrete (Postinstalled Mechanical Anchors) 104Article 3.9 Valves With Pressure-Seal-Type Bonnets (in the course of preparation) . 113
16、Article 3.10 Hot Bolting (in the course of preparation) 114Article 3.11 Hot and Half Bolting Removal Procedures 115Article 3.12 Inspection and Repair of Shell and Tube Heat Exchangers . 119Part 4 Nonmetallic and Bonded Repairs . 131Article 4.1 Nonmetallic Composite Repair Systems for Pipelines and P
17、ipework:High-Risk Applications 131Article 4.2 Nonmetallic Composite Repair Systems for Pipelines and Pipework:Low-Risk Applications . 161Article 4.3 Nonmetallic Internal Lining for Pipe: Sprayed Form for Buried Pipe . 174Part 5 Examination and Testing. 186Article 5.1 Pressure and Tightness Testing o
18、f Piping and Equipment 186Article 5.2 Nondestructive Examination in Lieu of Pressure Testing for Repairsand Alterations 200iiiCopyright ASME International Provided by IHS under license with ASME Not for ResaleNo reproduction or networking permitted without license from IHS-,-,-FOREWORDASME formed an
19、 Ad Hoc Task Group on Post Construction in 1993 in response to an increasedneed for recognized and generally accepted engineering standards for the inspection and mainte-nance of pressure equipment after it has been placed in service. At the recommendation of thisTask Group, the Board on Pressure Te
20、chnology Codes and Standards (BPTCS) formed the PostConstruction Committee (PCC) in 1995. The scope of this committee was to develop and maintainstandards addressing common issues and technologies related to post-construction activities andto work with other consensus committees in the development o
21、f separate, product-specific codesand standards addressing issues encountered after initial construction for equipment and pipingcovered by Pressure Technology Codes and Standards. The BPTCS covers non-nuclear boilers,pressure vessels (including heat exchangers), piping and piping components, pipeli
22、nes, andstorage tanks.The PCC selects standards to be developed based on identified needs and the availability ofvolunteers. The PCC formed the Subcommittee on Inspection Planning and the Subcommitteeon Flaw Evaluations in 1995. In 1998, a Task Group under the PCC began preparing Guidelinesfor Press
23、ure Boundary Bolted Flange Joint Assembly. In 1999, the PCC formed the Subcommitteeon Repair and Testing. In 2002, the Subcommittee on Flaw Evaluation was dissolved, and replacedby the Joint ASME/API Committee on Fitness for Service. Other topics are under considerationand may be developed into futu
24、re guideline documents.The subcommittees were charged with preparing standards dealing with several aspects of thein-service inspection and maintenance of pressure equipment and piping. The Inspection PlanningStandard provides guidance on the preparation of a risk-based inspection plan. Defects that
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASMEPCC22008REPAIROFPRESSUREEQUIPMENTANDPIPINGPCC22008 压力 设备 管道 维修 PDF

链接地址:http://www.mydoc123.com/p-456769.html