ECA EIA-364-31D-2014 TP-31D Humidity Test Procedure for Electrical Connectors and Sockets.pdf
《ECA EIA-364-31D-2014 TP-31D Humidity Test Procedure for Electrical Connectors and Sockets.pdf》由会员分享,可在线阅读,更多相关《ECA EIA-364-31D-2014 TP-31D Humidity Test Procedure for Electrical Connectors and Sockets.pdf(18页珍藏版)》请在麦多课文档分享上搜索。
1、 EIA STANDARD TP-31D Humidity Test Procedure for Electrical Connectors and Sockets EIA-364-31D (Revision of EIA-364-31C) July 2014 ANSI/EIA-364-31D-2014 Approved: July 21, 2014 EIA-364-31D NOTICE EIA Engineering Standards and Publications are designed to serve the public interest through eliminating
2、 misunderstandings between manufacturers and purchasers, facilitating interchangeability and improvement of products, and assisting the purchaser in selecting and obtaining with minimum delay the proper product for his particular need. Existence of such Standards and Publications shall not in any re
3、spect preclude any member or nonmember of ECIA from manufacturing or selling products not conforming to such Standards and Publications, nor shall the existence of such Standards and Publications preclude their voluntary use by those other than ECIA members, whether the standard is to be used either
4、 domestically or internationally. Standards and Publications are adopted by ECIA in accordance with the American National Standards Institute (ANSI) patent policy. By such action, ECIA does not assume any liability to any patent owner, nor does it assume any obligation whatever to parties adopting t
5、he Standard or Publication. This standard is based upon the major technical content of International Electrotechnical Commission standard 60512-11-3 (was 512-6, test 11c), Damp Heat, Steady State, 2002-02, first edition; and 60512-11-12 (was 512-6, test 11m), Damp Heat, Cyclic, 2002-02, first editio
6、n. There are known differences between this standard and the IEC standard. This Standard does not purport to address all safety problems associated with its use or all applicable regulatory requirements. It is the responsibility of the user of this Standard to establish appropriate safety and health
7、 practices and to determine the applicability of regulatory limitations before its use. (From Standards Proposal No. 5210, formulated under the cognizance of the CE-2.0 Committee on EIA National Connector and Sockets Standards.) Published by Electronic Components Industry Association 2014 EIA Standa
8、rds b) Upon completion of preconditioning and recovery to room ambient conditions, all required measurements shall be performed at room ambient conditions and then the test specimens shall be placed in the test chamber and ramped to the specified test conditions; c) Test temperature: 40 C 2 C; d) Hu
9、midity: 90% to 95%; e) Duration: 96 hours, unless otherwise specified in the referencing document; f) Upon completion of the test duration, the test specimens shall be returned to room ambient conditions; g) Specified measurements shall be performed when specified at room ambient conditions. If the
10、referencing document or measurement procedure specifies measurements to be conducted after a recovery period, but does not specify the duration of the recovery period, the recovery period shall be a minimum of 24 hours at room ambient conditions. Specimens shall not be subjected to any means of arti
11、ficial drying. 5.4 Method III, cycling temperature - humidity with optional cold shock and vibration (Discontinued and Superseded by Method IV) Method III has been discontinued and superseded by Method IV. However in legacy applications that specified Method III, step 7b; step 7b shall be performed
12、following step 7a in Method IV. Step 7b consisted of subjecting the specimens (within 15 minutes after completion of step 7a, when specified in the referencing document, and with humidity not controlled) to vibration for 15 minutes, at room ambient temperature; using a simple harmonic motion of 0.15
13、 millimeter (0.006 inch) maximum total excursion, the frequency being varied uniformly between the approximate limits of 10 and 55 Hz. The entire frequency range, from 10 to 55 Hz and return to 10 Hz, shall be traversed in approximately one minute. EIA-364-31D Page 5 5.5 Method IV, cycling temperatu
14、re humidity with optional cold shock (see figure 1) NOTE For cross reference to previous MIL-STD-1344 designations see Annex A. 5.5.1 Unless otherwise specified, the test specimens shall be exposed to the following conditions in the sequence as indicated: a) Precondition in a dry oven at 50 C 5 C fo
15、r 24 hours; b) Upon completion of preconditioning and recovery to room ambient conditions, all required measurements shall be performed at room ambient conditions and then the test specimens shall be placed in the test chamber and ramped to the specified test conditions; c) Temperature: 25 C 3 C to
16、65 C 3 C; d) See figure 1 for temperature and humidity profile; e) Cycle duration: 24 hours; f) Duration): 10 cycles (test duration B); g) Upon completion of the test duration, the test specimens shall be returned to room ambient conditions; h) Specified measurements shall be performed when specifie
17、d at room ambient conditions. If the referencing document or measurement procedure specifies measurements to be conducted after a recovery period, but does not specify the duration of the recovery period, the recovery period shall be a minimum of 24 hours at room ambient conditions. Specimens shall
18、not be subjected to any means of artificial drying. 5.5.2 Sub cycle During step 7, at least 1 hour but not more than 4 hours after step 7 begins, the specimens shall be either removed from the humidity chamber, or the temperature of the chamber shall be reduced, for performance of step 7a, when spec
19、ified in the referencing document. After step 7a, when specified in the referencing document, the specimens shall be returned to 25 C at 90% to 98% relative humidity and kept there until the next cycle begins. This sub cycle shall be performed during any five of the first nine cycles. Sub cycles are
20、 optional. 5.5.3 Step 7a (cold cycle) When specified, at least 1 hour but not more than 4 hours after the beginning of step 7, the specimens shall be either removed from the humidity chamber, or the temperature of the chamber shall be reduced. Specimens shall be conditioned at -10 C 2 C (14 F 4 F) w
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ECAEIA36431D2014TP31DHUMIDITYTESTPROCEDUREFORELECTRICALCONNECTORSANDSOCKETSPDF

链接地址:http://www.mydoc123.com/p-704252.html