《ASME B31 8 INTERPRETATIONS-2012 Code for Pressure Piping (Includes Interpretations 1-16 September 1981 Through March 2012)《压力管道规程 (包括解释1-16 1981年9月至2012年3月)》.pdf》由会员分享,可在线阅读,更多相关《ASME B31 8 INTERPRETATIONS-2012 Code for Pressure Piping (Includes Interpretations 1-16 September 1981 Through March 2012)《压力管道规程 (包括解释1-16 1981年9月至2012年3月)》.pdf(87页珍藏版)》请在麦多课文档分享上搜索。
1、ASME B31.8 INTERPRETATIONS VOLUME 16ASME B31.8 INTERPRETATIONSVOLUME 16Replies to Technical InquiriesMarch 2010 Through March 2012Interpretations 16-1 Through 16-17It has been agreed to publish interpretations issued by the B31 Committee concerningASME B31.8 as part of the update service to the Code
2、. The interpretations have been asssignednumbers in chronological order. Each interpretation applies either to the latest Edition or Addendaat the time of issuance of the interpretation or the Edition or Addenda stated in the reply.Subsequent revisions to the Code may have superseded the reply.These
3、 replies are taken verbatim from the original letters, except for a few typographical andeditorial corrections made for improved clarity.ASME procedures provide for reconsideration of these interpretations when or if additionalinformation that the inquirer believes might affect the interpretation is
4、 available. Further, personsaggrieved by an interpretation may appeal to the cognizant ASME committee or subcommittee.As stated in the Statement of Policy in the Code documents, ASME does not “approve,” “certify,”“rate,” or “endorse” any item, construction, proprietary device, or activity.I-1ASME B3
5、1.8 INTERPRETATIONS VOLUME 16B31.8Subject Interpretation File No.Appendix F . 16-11 11-376Para. 802.12(f), Injection and Production Flow Lines . 16-13 07-1469,07-1470Para. 831.2.2, ASTM A307 Grade B Bolting for B16.5 Flanges in Classes 150and 300 Service 16-4 10-718Para 831.2.2, Follow-Up Inquiry on
6、 ASTM A307 Grade B Bolting forB16.5 Flanges in Classes 150 and 300 Service 16-10 11-371Para. 831.4.1(c) and Appendix F . 16-8 09-1699Para. 841.31, General Provisions . 16-3 07-1472Para. 842.2, Design of Plastic Piping, General Provisions . 16-9 10-1001Para. 845.2.2, MAOP and Para. 845.4.1, Capacity
7、of Pressure-Relievingand Pressure-Limiting Stations and Devices. 16-14 10-1195Para. 845.4.1, Transient Overpressure. 16-16 11-1574Para. 845.411, Hoop Stress Calculations. 16-2 10-162Para. A842.2.2, Design Against Yielding 16-12 11-377Para. A842.2.2, Design Against Yielding and Para. A842.2.3, Altern
8、ate Designfor Strain 16-15 11-1573Paras. A842.2.2(a), A842.2.2(b), and A842.2.2(c) 16-1 10-23Para. A842.2.2(a), Hoop Stress . 16-6 10-1056Para. A842.2.2(a), Hoop Stress and Para. A847.2, Test Pressure 16-5 10-1057Para. A842.2.2(a), Hoop Stress and Para. A847.2, Test Pressure 16-7 10-1644Para. A847.2
9、, Test Pressure 16-17 12-121I-2ASME B31.8 INTERPRETATIONS VOLUME 16Interpretation: 16-1Subject: ASME B31.8-2007, Paras. A842.2.2(a), A842.2.2(b), and A842.2.2(c)Date Issued: March 10, 2010File: 10-23Question (1): The equation for hoop stress in para. A842.2.2(a) has a temperature deratingfactor in t
10、he formula, whereas the equations for longitudinal stress and combined stress inparas. A842.2.2(b) and A842.2.2(c) do not use a temperature derating factor. Is this correct?Reply (1): Yes.Question (2): Does ASME B31.8 use temperature derated values of Specified Minimum YieldStrength?Reply (2): No.In
11、terpretation: 16-2Subject: ASME B31.8-2007, Para. 845.411, Hoop Stress CalculationsDate Issued: March 10, 2010File: 10-162Question (1): Is it allowed to use the Lame formula to determine hoop stress when determiningincidental pressure for an onshore pipeline in accordance with para. 845.411?Reply (1
12、): No.Question (2): Is it required to multiply the hoop stress by the Location Class Basic DesignFactor, F, for the capacity check per para. 845.411?Reply (2): No.Interpretation: 16-3Subject: ASME B31.8-2003, Para. 841.31, General ProvisionDate Issued: June 30, 2010File: 07-1472Question (1): With re
13、spect to para. 841.31, is a flange-end valve considered to be a nonweldedtie-in connection?Reply (1): Yes, provided the valve serves as a tie-in point after construction and testing of thepipeline or piping.Question (2): Is it mandatory for a pretested flange-end valve to be part of the piping syste
14、mduring hydrotesting?Reply (2): No. Per para. 841.31, nonwelded tie-in connections not pressure tested after construc-tion shall be leak tested.I-3ASME B31.8 INTERPRETATIONS VOLUME 16Interpretation: 16-4Subject: ASME B31.8-2010; Para. 831.2.2, ASTM A307 Grade B Bolting for B16.5 Flanges inClasses 15
15、0 and 300 ServiceDate Issued: July 7, 2010File: 10-718Question: Does ASME B31.8 allow the use of ASTM A307 Grade A bolts in addition to Grade Bbolts in para. 831.2.2(b)?Reply: No.Interpretation: 16-5Subject: ASME B31.8-2010, Para. A842.2.2(a), Hoop Stress and Para. A847.2, Test PressureDate Issued:
16、July 30, 2010File: 10-1057Question (1): In para. A842.2.2(a), eq. (2) is for thin-walled pipe, and eq. (3) is for thick-walledpipe. However, if we go by what is given in these two Code equations, the pipe thickness forthick-walled pipes will be less than the pipe thickness for thin-walled pipes. The
17、refore, is therea typographical or drafting error in eqs. (3) and (5) in this section?Reply (1): The equations are all correct, but it is not clearly identified that eqs. (2) and (4) arefor U.S. Customary Units and that eqs. (3) and (5) are for SI Units. Furthermore, there is apublishing error in th
18、e Note following these equations. The Note should read: “It is recommendedthat eq. (2) or (3) be used for D/t greater than or equal to 30 and that eq. (4) or (5) be used forD/t less than 30.” Errata has been issued to correct these publishing errors.Question (2): We have a pipeline where the corrosi
19、on allowance is 6 mm and 12.5% fabricationallowance. Is the hoop stress calculation under ASME B31.8, Chapter VIII (para. A842.2.2) to bebased only on nominal wall thickness?Reply (2): Yes.Question (3): If no, then what are the maximum limits for corrosion and fabrication allowancesbeyond which we n
20、eed to factor them while calculating the Hoop Stress?Reply (3): The hoop stress calculations under ASME B31.8, Chapter VIII are to be based onlyon nominal wall thickness.Question (4): When reading paras. A842.2.2(a) and A847.2, our interpretation for F1, hoop stressdesign factor for offshore pipelin
21、es, for a pressure test is that it should be equal to 1. Therefore,is it correct to take the F1design factor for offshore pipelines for a pressure test to be equal to 1?Reply (4): No. As stated in Table A842.2.2-1, the hoop stress design factor, F1, for offshorepipelines shall be 0.72. There is no h
22、oop stress design factor, F1, for pressure tests.Question (5): If no, then what is the correct design factor for the above case?Reply (5): See reply to Question (4).I-4ASME B31.8 INTERPRETATIONS VOLUME 16Interpretation: 16-6Subject: ASME B31.8-2010, Para. A842.2.2(a), Hoop StressDate Issued: October
23、 20, 2010File: 10-1056Question: Can the hoop stress formula in para. A842.2.2(a), eq. (4), be revised as noted below?For an isotropic elastic pipe, this technical inquiry proposes the following formulation for hoopstress calculation.Shp(Pi Pe)H9256 Pi(1)whereH9256pH209022H20900H20898tDH20899H20898tD
24、H208992H20901H209031p 2H20898AoAsH20899(2)Aop external cross sectional area of pipeAsp pipe material cross sectional area (cross sectional area of pipe steel)The proposed formulation, eq. (1), is based on Lames solution for hoop stress at the insidediameter of a cylinder subject to a differential pr
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASMEB318INTERPRETATIONS2012CODEFORPRESSUREPIPINGINCLUDESINTERPRETATIONS116SEPTEMBER1981THROUGHMARCH2012

链接地址:http://www.mydoc123.com/p-456546.html