ARP 062-9-1-2009 Recommendations for small renewable energy and hybrid systems for rural electrification Part 9-1 Micropower systems《乡村电气化的小型更新能源和混合系统推荐标准 第9-1部分 微动力系统》.pdf
《ARP 062-9-1-2009 Recommendations for small renewable energy and hybrid systems for rural electrification Part 9-1 Micropower systems《乡村电气化的小型更新能源和混合系统推荐标准 第9-1部分 微动力系统》.pdf》由会员分享,可在线阅读,更多相关《ARP 062-9-1-2009 Recommendations for small renewable energy and hybrid systems for rural electrification Part 9-1 Micropower systems《乡村电气化的小型更新能源和混合系统推荐标准 第9-1部分 微动力系统》.pdf(58页珍藏版)》请在麦多课文档分享上搜索。
1、 Collection of SANS standards in electronic format (PDF) 1. Copyright This standard is available to staff members of companies that have subscribed to the complete collection of SANS standards in accordance with a formal copyright agreement. This document may reside on a CENTRAL FILE SERVER or INTRA
2、NET SYSTEM only. Unless specific permission has been granted, this document MAY NOT be sent or given to staff members from other companies or organizations. Doing so would constitute a VIOLATION of SABS copyright rules. 2. Indemnity The South African Bureau of Standards accepts no liability for any
3、damage whatsoever than may result from the use of this material or the information contain therein, irrespective of the cause and quantum thereof. ISBN 978-0-626-22160-7 ARP 062-9-1:2009 Edition 1 IEC/TS 62257-9-1:2008 Edition 1SABS STANDARDS DIVISION Recommended practice Recommendations for small r
4、enewable energy and hybrid systems for rural electrification Part 9-1: Micropower systems This recommended practice is the identical implementation of IEC/TS 62257-9-1:2008 and is adopted with the permission of the International Electrotechnical Commission. WARNING Can only be used in conjunction wi
5、th the ARP 062 series. This document is not a South African National Standard Published by SABS Standards Division 1 Dr Lategan Road Groenkloof Private Bag X191 Pretoria 0001 Tel: +27 12 428 7911 Fax: +27 12 344 1568 www.sabs.co.za SABS This standard may only be used and printed by approved subscrip
6、tion and freemailing clients of the SABS.ARP 062-9-1:2009 Edition 1 IEC/TS 62257-9-1:2008 Edition 1 Table of changes Change No. Date Scope National foreword This recommended practice is a technical agreement developed in accordance with SANS 1-1, and agreed to by SABS TC 69, Power electronics and al
7、ternative energy conversion. This document was published in February 2009. This standard may only be used and printed by approved subscription and freemailing clients of the SABS. IEC/TS 62257-9-1 Edition 1.0 2008-09 TECHNICAL SPECIFICATIONRecommendations for small renewable energy and hybrid system
8、s for rural electrification Part 9-1: Micropower systems INTERNATIONAL ELECTROTECHNICAL COMMISSION XA ICS 27.160; 27.180 PRICE CODE ISBN 2-8318-9996-6 Registered trademark of the International Electrotechnical Commission ARP 062-9-1:2009This standard may only be used and printed by approved subscrip
9、tion and freemailing clients of the SABS. 2 TS 62257-9-1 IEC:2008(E) CONTENTS FOREWORD.5 INTRODUCTION.7 1 Scope.8 2 Normative references .9 3 Terms and definitions .9 4 General 11 4.1 Boundary of a micropower plant 11 4.2 Composition of a micropower plant12 4.3 General functional layout of a micropo
10、wer plant 12 5 Design13 5.1 Design criteria.13 5.2 Power generation mix14 5.2.1 General .14 5.2.2 Internal combustion generator sets15 5.3 Electrical design15 5.3.1 System voltage selection.15 5.3.2 Interconnection of generators 15 5.4 Mechanical and civil works 16 5.4.1 Civil works.16 5.4.2 Technic
11、al room16 5.4.3 Battery room17 5.4.4 Specific requirements 17 6 Safety issues17 6.1 Electrical issues 17 6.1.1 General .17 6.1.2 Specific requirements 17 6.2 Mechanical issues.21 6.3 Thermal and fire issues .22 6.4 Noise issues22 6.5 Access security .22 7 Erection of equipment.22 7.1 Siting.22 7.1.1
12、 Photovoltaic array22 7.1.2 Wind turbine23 7.1.3 Micro-hydro turbine .23 7.1.4 Generator set 23 7.1.5 Technical room23 7.2 Equipment installation .24 7.2.1 Mechanical 24 7.2.2 Electrical .24 8 Acceptance process .26 8.1 General .26 8.2 Phase 1: Preparation.27 8.3 Phase 2: Documentation .27 8.4 Phase
13、 3: Commissioning .27 ARP 062-9-1:2009This standard may only be used and printed by approved subscription and freemailing clients of the SABS.TS 62257-9-1 IEC:2008(E) 3 8.4.1 Step 1: Evaluation of the conformity of the installed system with the accepted design 27 8.4.2 Step 2: Evaluation of qualific
14、ation of the installation 27 8.4.3 Step 3: Preliminary tests27 8.4.4 Step 4: Performance testing 28 8.5 Phase 4: Agreement28 8.6 Commissioning records .28 9 Operation, maintenance and replacement.28 10 Marking and documentation29 10.1 Marking .29 10.1.1 Information for emergency services .29 10.1.2
15、Information for maintenance 29 10.1.3 Information for batteries 29 10.1.4 Information for sockets 29 10.1.5 Signs.29 10.2 Documentation 30 Annex A (informative) Selectivity of protection .31 Annex B (informative) Risk assessment of lightning stroke.32 Annex C (normative) Voltage domains .35 Annex D
16、(informative) Battery room .36 Annex E (informative) Energy fraction calculations 39 Annex F (informative) Noise control .41 Annex G (informative) Commissioning record sheet (examples).43 Bibliography53 Figure 1 Micropower system limits .11 Figure 2 Example of functional layout for a micropower plan
17、t supplying a.c. energy.13 Figure 3 Interconnection configuration with d.c. bus and a.c. bus.16 Figure 4 Interconnection configuration with a.c. bus only .16 Figure 5 Example of protection against effects of lightning and over-voltage for generators with two live conductors output (d.c. or a.c.) TNS
18、 P+N 18 Figure 6 Example of protection against effects of lightning over-voltage for three phase generators with four live a.c. conductors (TNS P+N scheme) Generator side.19 Figure 7 Example of a simplified lightning protection including a crows foot earth termination20 Figure 8 Protection of a phot
19、ovoltaic array.21 Figure 9 Wiring arrangement for equipotential link .21 Figure A.1 Example of the selectivity of protection.31 Table 1 Minimum dimensions for lightning protection wires 20 Table 2 Cross-section of 230 V a.c. power cables24 Table 3 Fuse ratings for protection from short-circuiting in
20、 230 V/400 V a.c. circuits 25 Table 4 Fuse ratings for protection from short-circuiting in 120 V/208 V a.c. circuits 26 Table 5 Circuit-breaker ratings for protection from short-circuiting .26 Table B.1 Stake index values.32 Table B.2 Construction index values 33 ARP 062-9-1:2009This standard may on
21、ly be used and printed by approved subscription and freemailing clients of the SABS. 4 TS 62257-9-1 IEC:2008(E) Table B.3 Height index values33 Table B.4 Situation index values 33 Table B.5 Lightning prevalence index values .33 Table B.6 Assessment of risk and need for protection34 Table C.1 Voltage
22、 domains 35 ARP 062-9-1:2009This standard may only be used and printed by approved subscription and freemailing clients of the SABS.TS 62257-9-1 IEC:2008(E) 5 INTERNATIONAL ELECTROTECHNICAL COMMISSION _ RECOMMENDATIONS FOR SMALL RENEWABLE ENERGY AND HYBRID SYSTEMS FOR RURAL ELECTRIFICATION Part 9-1:
23、 Micropower systems FOREWORD 1) The International Electrotechnical Commission (IEC) is a worldwide organization for standardization comprising all national electrotechnical committees (IEC National Committees). The object of IEC is to promote international co-operation on all questions concerning st
24、andardization in the electrical and electronic fields. To this end and in addition to other activities, IEC publishes International Standards, Technical Specifications, Technical Reports, Publicly Available Specifications (PAS) and Guides (hereafter referred to as “IEC Publication(s)”). Their prepar
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARP062912009RECOMMENDATIONSFORSMALLRENEWABLEENERGYANDHYBRIDSYSTEMSFORRURALELECTRIFICATIONPART91MICROPOWERSYSTEMS

链接地址:http://www.mydoc123.com/p-449843.html