1、*USACE / NAVFAC / AFCESA / NASA UFGS-31 73 00 (November 2008)-Preparing Activity: USACE (CW) SupersedingUFGS-31 73 00 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2008*SECTION TABLE OF CONTENTSDIVISION 31 - EARTHWORKSECTION 31 73 00TUNNEL AND
2、 SHAFT GROUTING11/08PART 1 GENERAL1.1 UNIT PRICES1.1.1 Mobilization and Demobilization1.1.1.1 Payment1.1.1.2 Unit of Measure1.1.2 Drilling Grout Holes1.1.2.1 Payment1.1.2.2 Measurement1.1.2.3 Unit of Measure1.1.3 Drilling Drain Holes1.1.3.1 Payment1.1.3.2 Measurement1.1.3.3 Unit of Measure1.1.4 Dril
3、ling Exploratory Holes1.1.4.1 Payment1.1.4.2 Measurement1.1.4.3 Unit of Measure1.1.5 Placing Grout1.1.5.1 Payment1.1.5.2 Measurement1.1.5.3 Unit of Measure1.1.6 Connections to Grout Holes1.1.6.1 Payment1.1.6.2 Measurement1.1.6.3 Unit of Measure1.1.7 Portland Cement in Grout1.1.7.1 Payment1.1.7.2 Mea
4、surement1.1.7.3 Unit of Measure1.1.8 Mineral Filler in Grout1.1.8.1 Payment1.1.8.2 Measurement1.1.8.3 Unit of Measure1.1.9 Sand in Grout1.1.9.1 PaymentSECTION 31 73 00 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.1.9.2 Measurement1.1.9.3 U
5、nit of Measure1.1.10 Fluidifier in Grout1.1.10.1 Payment1.1.10.2 Measurement1.1.10.3 Unit of Measure1.1.11 Chemicals in Chemical Grout1.1.11.1 Payment1.1.11.2 Measurement1.1.11.3 Unit of Measure1.1.12 Steel Pipe and Fittings1.1.12.1 Payment1.1.12.2 Measurement1.1.12.3 Unit of Measure1.1.13 Pressure
6、Washing and Pressure Testing1.1.13.1 Payment1.1.13.2 Measurement1.1.13.3 Unit of Measure1.2 REFERENCES1.3 SYSTEM DESCRIPTION1.4 SUBMITTALS1.5 QUALIFICATIONS1.6 SEQUENCINGPART 2 PRODUCTS2.1 GROUTING MATERIALS2.1.1 Water2.1.2 Cement2.1.3 Sand2.1.4 Admixtures2.1.5 Mineral Filler2.1.6 Chemical Grouting
7、Materials2.2 EQUIPMENT2.2.1 Drilling Equipment2.2.2 Grouting Equipment2.2.2.1 Cement Grouting Equipment2.2.2.2 Chemical Grouting Equipment2.3 GROUT2.3.1 Cement Grout2.3.2 Chemical Grout2.3.3 Grouting Material Samples2.4 PIPE AND FITTINGSPART 3 EXECUTION3.1 GROUT, DRAINAGE, AND EXPLORATORY HOLES3.1.1
8、 Embedded Pipe3.1.2 Grout and Vent Hole Drilling3.1.3 Drain Hole Drilling3.1.4 Exploratory Hole Drilling3.1.5 Disposal of Drill Cuttings3.2 GROUTING PROCEDURES3.2.1 Washing and Pressure Testing Holes3.2.2 Contact Grouting3.2.3 Grouting Behind a Steel Liner3.2.4 Tunnel, shaft, and Ring Curtain Grouti
9、ng3.2.4.1 Grout Injection (Cement Grout)3.2.4.2 RefusalSECTION 31 73 00 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.2.4.3 Grout in Drains3.2.4.4 Stage Grouting3.2.4.5 Grout Injection (Chemical Grout)3.2.4.6 Grout Injection Pipes3.2.5 Wast
10、e Water and Grout3.3 PATCHING AND CLEANUP3.4 RECORDS3.5 CONTRACTOR QUALITY CONTROL- End of Section Table of Contents -SECTION 31 73 00 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-31 73 00 (November 2008)
11、-Preparing Activity: USACE (CW) SupersedingUFGS-31 73 00 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2008*SECTION 31 73 00TUNNEL AND SHAFT GROUTING11/08*NOTE: This guide specification covers the requirements for tunnel and shaft grouting app
12、licable to constructing new and repairing existing underground structures.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not r
13、equired in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number
14、, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 UNIT PRICES*NOTE: If Section 01 22 00.00 10 MEASUREMENT AND PAYMENT is included in the project specifications, this paragraph title (UNIT PRICES) should be deleted from this s
15、ection and the remaining appropriately edited subparagraphs below should be inserted into Section 01 22 00.00 10.*SECTION 31 73 00 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.1.1 Mobilization and Demobilization1.1.1.1 PaymentPayment will
16、be made for costs of assembling all plant and equipment at the site preparatory to initiating the work and for removing it when the drilling and grouting has been completed. Sixty (60) percent of the contract lump-sum price for mobilization and demobilization will be paid following completion of mov
17、ing onto the site, including complete assembly, in working order, of all equipment necessary to perform the required drilling and grouting operations. The remaining forty (40) percent of the contract lump-sum price will be paid when all equipment has been removed from the site.1.1.1.2 Unit of Measur
18、eUnit of measure: lump sum.1.1.2 Drilling Grout Holes1.1.2.1 PaymentPayment will be made for costs associated with drilling and redrilling grout holes; washing and pressure testing of grout holes; containing and disposing of waste water and waste grout; clean-up of the site; furnishing, handling, tr
19、ansporting and storing of grout materials; and for furnishing all labor and supplies incidental to the work. Unless otherwise specified, noNo separate payment will be made for any material constituent of the grout, including cement and/or chemical grout materials placed in the performance of contrac
20、t grouting. No payment will be made for grout, or the material constituents thereof, wasted due to improper anchorage of grout pipe or connections, or which is wasted due to negligence on the part of the Contractor, nor for grout which is rejected by the Contracting Officer because of improper mixin
21、g. Payment will be made at the applicable contract unit prices for materials contained in grout which are wasted, where the wasting is not due to negligence on the part of the Contractor.1.1.2.2 MeasurementDrilling of grout holes will be measured for payment on the basis of the linear meters feet of
22、 holes actually drilled in concrete, rock or soil, as shown or as directed, including all intermediate holes at locations where pipe was not installed.1.1.2.3 Unit of MeasureUnit of measure: linear meter foot.1.1.3 Drilling Drain Holes1.1.3.1 PaymentPayment will be made for costs associated with dri
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS3173002008TUNNELANDSHAFTGROUTING 隧道 身后 灌浆 PDF

链接地址:http://www.mydoc123.com/p-449701.html