1、*USACE / NAVFAC / AFCESA / NASA UFGS-31 68 13 (November 2008)-Preparing Activity: USACE (CW) SupersedingUFGS-31 68 13 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2008*SECTION TABLE OF CONTENTSDIVISION 31 - EARTHWORKSECTION 31 68 13SOIL AND R
2、OCK ANCHORS11/08PART 1 GENERAL1.1 UNIT PRICES1.1.1 Drilling Holes in Soil1.1.1.1 Payment1.1.1.2 Measurement1.1.1.3 Unit of Measure1.1.2 Drilling Holes in Rock1.1.2.1 Payment1.1.2.2 Measurement1.1.2.3 Unit of Measure1.1.3 Soil Rock Anchors1.1.3.1 Payment1.1.3.2 Measurement1.1.3.3 Unit of Measure1.1.4
3、 Performance Tests1.1.4.1 Payment1.1.4.2 Measurement1.1.4.3 Unit of Measure1.1.5 Proof Tests1.1.5.1 Payment1.1.5.2 Measurement1.1.5.3 Unit of Measure1.1.6 Creep Tests1.1.6.1 Payment1.1.6.2 Measurement1.1.6.3 Unit of Measure1.1.7 Soil Rock Anchors, Complete1.1.7.1 Payment1.1.7.2 Measurement1.1.7.3 Un
4、it of Measure1.1.8 Watertightness Testing1.1.8.1 Payment1.1.8.2 Measurement1.1.8.3 Unit of Measure1.1.9 Pregrouting HolesSECTION 31 68 13 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.1.9.1 Payment1.1.9.2 Measurement1.1.9.3 Unit of Measure1
5、.1.10 Redrilling Grouted Holes1.1.10.1 Payment1.1.10.2 Measurement1.1.10.3 Unit of Measure1.2 REFERENCES1.3 DEFINITIONS1.4 SYSTEM DESCRIPTION1.4.1 General Requirements1.4.2 Scope of work1.4.3 Anchor Design1.5 SUBMITTALS1.6 QUALITY ASSURANCE1.6.1 Designer Qualifications1.6.2 Fabricator Qualifications
6、1.6.3 Installer Qualifications1.6.4 Core Logging and Soil Sampling1.7 DELIVERY, STORAGE, AND HANDLING1.8 SITE CONDITIONSPART 2 PRODUCTS2.1 MATERIALS2.1.1 Prestressing Steel2.1.1.1 High-Strength Steel Bars2.1.1.2 Epoxy-Coated Steel Bars2.1.1.3 Steel Bar2.1.1.4 Strand2.1.1.5 Compact Strand2.1.1.6 Epox
7、y Coated Strand2.1.2 Structural Steel2.1.3 Steel Pipe2.1.4 Steel Tube2.1.5 Ductile Iron Castings2.1.6 Polyethylene Tubing2.1.6.1 Smooth Polyethylene Tubing2.1.6.2 Corrugated Polyethylene Tubing2.1.7 Smooth Polypropylene Tubing2.1.8 Polyvinyl Chloride (PVC) Pipe2.1.9 Polyvinyl Chloride (PVC) Tubing2.
8、1.9.1 Smooth Polyvinyl Chloride (PVC) Tubing2.1.9.2 Corrugated Polyvinyl Chloride (PVC) Tubing2.1.10 Heat Shrinkable Sleeve2.1.11 Corrosion Inhibiting Compound2.2 MANUFACTURED UNITS2.2.1 Anchor Head2.2.2 Prestressing Steel Couplers2.2.3 Centralizers and Spacers2.2.4 Casing2.2.5 Anchorage Covers2.3 E
9、QUIPMENT2.3.1 Drilling Equipment2.3.2 Grouting Equipment2.3.2.1 Grout Mixer2.3.2.2 Grout Pump2.3.3 Stressing Equipment2.3.4 Testing EquipmentSECTION 31 68 13 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.4 GROUT2.4.1 Cement2.4.2 Water2.4.3
10、Aggregates2.4.4 Admixtures.2.4.5 Grout for Anchors2.4.5.1 Cement Grout2.4.5.2 Polyester Resin Grout2.4.6 Sand-Cement Grout2.4.7 Grout for Anchor Pads2.5 TENDON FABRICATION2.5.1 General2.5.2 Tendon2.5.3 Bond Breaker2.5.4 Vent Tubes2.5.5 Grout Tubes2.5.6 Corrosion Protection2.5.6.1 Anchorage Protectio
11、n2.5.6.2 Free Stressing Length Encapsulation2.5.6.3 Bond Length Encapsulation2.6 TESTS, INSPECTIONS, AND VERIFICATIONSPART 3 EXECUTION3.1 DRILLING HOLES3.1.1 General3.1.2 Drilling Through Existing Structures3.1.3 Drilling In Soil3.1.4 Casing3.1.5 Drilling in Rock3.1.6 Records3.1.7 Alignment3.1.7.1 T
12、olerances3.1.7.2 Alignment Check3.1.7.3 Alignment Checking Equipment3.1.8 Watertightness Testing3.1.9 Waterproofing Anchor Holes3.2 INSTALLATION OF ANCHORS3.2.1 General3.2.2 Placing3.2.3 Resin Grouted Anchors3.2.4 Cement Grouted Rock Anchors3.2.5 Grouting of Soil Anchors3.2.5.1 General3.2.5.2 Gravit
13、y Grouting3.2.5.3 Pressure Grouting3.2.5.4 Post-Grouting3.2.6 Anchorage Installation3.3 STRESSING3.3.1 General Requirements3.3.2 Lock-off3.4 FIELD QUALITY CONTROL3.4.1 General3.4.2 Performance Test3.4.3 Proof Test3.4.4 Supplementary Extended Creep Test3.4.5 Driller Logs3.4.6 Anchor Records3.5 ACCEPT
14、ANCESECTION 31 68 13 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.5.1 General3.5.2 Replacement of Rejected Anchors- End of Section Table of Contents -SECTION 31 68 13 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitt
15、ed without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-31 68 13 (November 2008)-Preparing Activity: USACE (CW) SupersedingUFGS-31 68 13 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2008*SECTION 31 68 13SOIL AND ROCK ANCHORS11/08
16、*NOTE: This guide specification covers the requirements for soil and rock anchors.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requiremen
17、ts not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephon
18、e number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).This guide specification includes tailoring options for PRESCRIPTIVE and PERFORMANCE specifications. Selection or deselection of a tailoring option will include or exclude that option in
19、 the section, but editing the resulting section to fit the project is still required. Editing will be simplified if the tailoring option is selected first.*PART 1 GENERAL*NOTE: This specification is based on, and references, the POST-TENSION INSTITUTE (PTI) recommendations for prestressed rock and s
20、oil anchors. The PTI manual is available from:POST-TENSIONING INSTITUTE.1717 W. NORTHERN AVE., SUITE 114SECTION 31 68 13 Page 5Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-PHOENIX, AZ 85021 U.S.APHONE: (602) 870-7540 FAX: (602) 870-7541The designe
21、r should carefully investigate the PTI document to ensure that the design conforms to PTI requirements and that conflicts do not occur between the referenced document and this specification. In the event deviations from the PTI recommendations are necessary, the specification must be edited to clear
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS3168132008SOILANDROCKANCHORS 固定 式岩锚 PDF

链接地址:http://www.mydoc123.com/p-449700.html