1、*USACE / NAVFAC / AFCESA / NASA UFGS-31 63 16 (November 2008)-Preparing Activity: USACE SupersedingUFGS-31 63 16 (October 2007)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2008*SECTION TABLE OF CONTENTSDIVISION 31 - EARTHWORKSECTION 31 63 16AUGER CAST GR
2、OUT PILES11/08PART 1 GENERAL1.1 MEASUREMENT AND PAYMENT PROCEDURES1.1.1 Lump Sum1.1.1.1 Variations in Pile Quantities1.1.1.2 Variations in Pile Load Test Quantities1.1.1.3 Variations in Auger Withdrawal Quantities1.1.1.4 Lump Sum Basis of Payment1.1.2 Unit Prices1.1.2.1 Piles1.1.2.2 Unit Price Basis
3、 of Payment1.1.2.3 Full Compensation1.1.2.4 Load Tests1.2 REFERENCES1.3 SYSTEM DESCRIPTION1.3.1 Equipment1.3.2 Subsurface Data1.3.3 Grout Pump1.4 SUBMITTALSPART 2 PRODUCTS2.1 MATERIALS2.1.1 Grout2.1.1.1 Portland Cement2.1.1.2 Pozzolan2.1.1.3 Grout Fluidifier2.1.1.4 Water2.1.1.5 Fine Aggregate2.1.1.6
4、 Aggregate2.1.2 Reinforcement2.1.3 CasingsPART 3 EXECUTION3.1 GROUT VOLUMESECTION 31 63 16 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.2 INSTALLATI0N3.2.1 Casings Placement3.2.2 Drilling3.2.3 Grouting and Auger Removal3.2.4 Pile Butts3.2.
5、5 Placement Tolerances3.2.6 Cutoff3.2.7 Disposal of Excavated Material3.3 FLOW CONE TEST3.4 GROUT SPECIMENS FOR LABORATORY TESTS3.5 GROUT SPECIMENS FOR CONTRACTOR TESTS3.6 TEST PILES3.6.1 Placement3.6.2 Depth3.6.3 Loading Test3.6.4 Acceptance3.6.5 Tolerances3.7 SOIL PROFILE3.8 PROTECTION OF PILES3.9
6、 SPECIAL INSPECTION AND TESTING FOR SEISMIC-RESISTING SYSTEMS3.10 RECORDS- End of Section Table of Contents -SECTION 31 63 16 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-31 63 16 (November 2008)-Preparin
7、g Activity: USACE SupersedingUFGS-31 63 16 (October 2007)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2008*SECTION 31 63 16AUGER CAST GROUT PILES11/08*NOTE: This guide specification covers the requirements for auger cast grout piles.Edit this guide speci
8、fication for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on
9、this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Req
10、uest (CCR).*PART 1 GENERAL*NOTE: Auger cast grout piles are not recommended in low strength soils such as peat or soils containing layers or fields of boulders or cobbles.On the drawings, show:1. Subsurface-soil-data logs2. Locations and size (diameter) of piles.3. Design tip elevation for each pile
11、 indicated.4. Reinforcing steel details.5. Locations of test piles if required.SECTION 31 63 16 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-6. Locations of soil probes if required.*1.1 MEASUREMENT AND PAYMENT PROCEDURES*NOTE: Where the basi
12、s for bidding is based on lump sum price, use the following paragraphs. If the bid is based on unit price, use paragraph UNIT PRICES.*1.1.1 Lump Sum*NOTE: The pile diameter specified should be the diameter of the auger (50 mm (2 inches) larger in diameter than that used to calculate the structural c
13、apacity of the pile. The structural capacity of the pile should be based on an allowable design stress not greater than 20 percent of the 28-day grout strength.The number of augering test piles would depend on degree of variations in subsoil conditions as revealed by test borings. In general, a mini
14、mum of three augering tests should be made and possibly more where subsurface conditions are questionable. One test pile should be load tested in each area of substantially different subsoil conditions, but not less than one pile load test should be made for the project.The total test load would be
15、twice the working load on the pile, which should not exceed 36 metric tons (40 tons) per pile. Withdrawal of auger and examination of the soil to verify the soil profile should be required for all test piles and for 10 percent of the remaining piles to supplement the soil boring information.*The con
16、tract price for piling will be a principal sum based on _ mm inch diameter piles, (including _ test piles), having a total aggregate length of _ linear m feet and will include _ pile load tests having a capacity of _ metric ton ton and _ auger withdrawals.1.1.1.1 Variations in Pile QuantitiesFrom th
17、e results of laboratory tests on soil samples and data obtained as a result of placing and loading the test piles specified herein, the Contracting Officer will determine and will list “calculated“ pile tip elevations for all piles. The Contracting Officer reserves the right to increase or decrease
18、the total length of piles to be furnished and installed by changing the pile locations or elevations, requiring the installation of additional piles, or directing the omission of piles from the requirements shown and specified. Should the total pile length installed vary from that specified as the b
19、asis for bidding because of SECTION 31 63 16 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-added or omitted piles or variations in the pile lengths, the principal sum will be adjusted by the amount bid per linear m foot for “Additional Pile L
20、ength“ or “Omitted Pile Length“.1.1.1.2 Variations in Pile Load Test QuantitiesThe Contracting Officer reserves the right to increase or decrease the number of pile load tests from that specified for the basis of bidding. For changes in the number of load tests required, the contract principal sum p
21、rice will be adjusted by the amount bid for “Each Additional Pile Load Test“ or “Each Omitted Pile Load Test.“1.1.1.3 Variations in Auger Withdrawal QuantitiesShould the number of auger withdrawals be increased above the specified contract number at the direction of the Contracting Officer, the cont
22、ract principal sum will be adjusted by the amount bid for “Each Additional Auger Withdrawal.“1.1.1.4 Lump Sum Basis of PaymentThe Contractors furnished price shall include all necessary equipment, tools, material, labor, and supervision required for installing and cutting off the piles (including te
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS3163162008AUGERCASTGROUTPILES 浇注 灌浆 螺旋 PDF

链接地址:http://www.mydoc123.com/p-449698.html