ARMY UFGS-31 62 23 13-2008 CAST-IN-PLACE CONCRETE PILES STEEL CASING《现场浇注混凝土桩 钢套管》.pdf
《ARMY UFGS-31 62 23 13-2008 CAST-IN-PLACE CONCRETE PILES STEEL CASING《现场浇注混凝土桩 钢套管》.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-31 62 23 13-2008 CAST-IN-PLACE CONCRETE PILES STEEL CASING《现场浇注混凝土桩 钢套管》.pdf(14页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-31 62 23.13 (November 2008)-Preparing Activity: USACE SupersedingUFGS-31 62 23 13 (October 2007)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2008*SECTION TABLE OF CONTENTSDIVISION 31 - EARTHWORKSECTION 31 62 23.13CAST
2、-IN-PLACE CONCRETE PILES, STEEL CASING11/08PART 1 GENERAL1.1 MEASUREMENT AND PAYMENT PROCEDURES1.1.1 Unit Price1.1.2 Full Compensation1.1.3 Load Tests1.2 REFERENCES1.3 SYSTEM DESCRIPTION1.3.1 Subsurface Soil Data1.3.2 Equipment1.3.2.1 Pile Hammers1.3.2.2 Driving Helmets and Pile Cushions1.4 SUBMITTA
3、LSPART 2 PRODUCTS2.1 MATERIALS2.1.1 Concrete2.1.2 Reinforcement2.1.3 Casings2.1.3.1 Uniform Taper2.1.3.2 Step-Taper2.1.3.3 Constant Section2.1.3.4 Combination TypePART 3 EXECUTION3.1 INSTALLATION3.1.1 Driving Pile Casings3.1.1.1 Driving Procedure3.1.1.2 Tolerance in Driving3.1.1.3 Jetting of Pile Ca
4、sings3.1.2 Filling of Casings3.1.3 Cutting of Casings3.1.4 Welding3.1.5 SplicingSECTION 31 62 23.13 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.2 FIELD TESTS AND INSPECTIONS3.2.1 Test Piles3.2.1.1 Pile Driving3.2.1.2 Load Tests3.2.2 Concr
5、ete Testing3.3 SPECIAL INSPECTION AND TESTING FOR SEISMIC-RESISTING SYSTEMS- End of Section Table of Contents -SECTION 31 62 23.13 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-31 62 23.13 (November 2008)-
6、Preparing Activity: USACE SupersedingUFGS-31 62 23 13 (October 2007)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2008*SECTION 31 62 23.13CAST-IN-PLACE CONCRETE PILES, STEEL CASING11/08*NOTE: This guide specification covers the requirements for procuremen
7、t, installation, and testing of cast-in-place concrete piles utilizing steel casing.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirem
8、ents not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of technical proponents, including their organization designation and teleph
9、one number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 MEASUREMENT AND PAYMENT PROCEDURESBids will be based on the number of piles as indicated, and on lengths from tip to cutoff as follows:Number of piles Length, meters
10、 feet_ _ _From the data obtained as a result of driving the test piles and load tests specified hereinafter, the Government will determine and will list the “calculated“ pile tip elevations and the driving resistances for all piles. This list will be used as the basis for ordering piles. Payment SEC
11、TION 31 62 23.13 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-will be on the basis of length of piling from cutoff elevation to final tip elevation, established by the requirements specified elsewhere in this section. Should the total number
12、 of piles or the number of each length vary from that specified as the basis for bidding, an adjustment on the contract price and the time for completion will be made. If excavation is made adjacent to piling and below the grade indicated and if piling is driven before backfilling of over-excavation
13、, no payment will be made for the length of piling equal to the depth of the over-excavation. No additional payment will be made for cutting off piles, for any portion of a pile remaining above cutoff elevation, or for broken, damaged, or rejected piles.1.1.1 Unit PriceThe Contracting Officer reserv
14、es the right to increase or decrease the total length of piles to be furnished and installed, by changing the foundation pile locations or elevations, requiring the installation of additional piles, or requiring omission of piles from the requirements shown and specified. Whether or not such changes
15、 are made, payment will be made at the contract unit price per linear meter foot(including control test piles), multiplied by the total linear meters feet of acceptable piles actually installed.1.1.2 Full CompensationPayment in accordance with the above paragraph, “Unit Price,“ will constitute full
16、compensation for furnishing, delivering, handling, and/or installing (as applicable) all material, labor and equipment necessary to meet contract requirements applicable to the foundation piles. No payment will be allowed for withdrawn, broken or rejected piles, nor (except for control test piles) f
17、or a portion of any pile remaining above the cut-off point.1.1.3 Load TestsThe contract includes _ pile load tests. The Contracting Officer reserves the right to increase or decrease the number of pile tests. Adjustments in the contract price will be made for such increases or decreases by the amoun
18、ts bid for “Additional Pile Load Test“ or “Omitted Pile Load Test.“1.2 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, d
19、esignation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not us
20、ed in the text will automatically SECTION 31 62 23.13 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publicatio
21、ns listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.AMERICAN WELDING SOCIETY (AWS)AWS D1.1/D1.1M (2008) Structural Welding Code - SteelASTM INTERNATIONAL (ASTM)ASTM A 252 (1998; R 2007) Standard Sp
22、ecification for Welded and Seamless Steel Pipe PilesASTM D 1143/D 1143M (2007) Piles Under Static Axial Compressive LoadNATIONAL READY MIXED CONCRETE ASSOCIATION (NRMCA)NRMCA QC 3 (2002) Quality Control Manual: Section 3, Plant Certifications Checklist: Certification of Ready Mixed Concrete Producti
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS316223132008CASTINPLACECONCRETEPILESSTEELCASING 现场 浇注 混凝土 钢套 PDF

链接地址:http://www.mydoc123.com/p-449697.html