ARMY UFGS-11 82 20-2008 INCINERATORS GENERAL PURPOSE《焚烧炉标准规范(代替 NAVY UFGS-11 82 19)》.pdf
《ARMY UFGS-11 82 20-2008 INCINERATORS GENERAL PURPOSE《焚烧炉标准规范(代替 NAVY UFGS-11 82 19)》.pdf》由会员分享,可在线阅读,更多相关《ARMY UFGS-11 82 20-2008 INCINERATORS GENERAL PURPOSE《焚烧炉标准规范(代替 NAVY UFGS-11 82 19)》.pdf(61页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-11 82 20 (August 2008)-Preparing Activity: USACE SupersedingUFGS-11 82 20 (October 2007)UFGS-11 82 19 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTION TABLE OF CONTENTSDIVISION 11 - EQUIPMENTSECTION
2、11 82 20INCINERATORS, GENERAL PURPOSE08/08PART 1 GENERAL1.1 REFERENCES1.2 DEFINITIONS1.2.1 Waste Type 0, Trash1.2.2 Waste Type 1, Rubbish1.2.3 Waste Type 2, Refuse1.2.4 Waste Type 3, Garbage1.2.5 Waste Type 4, Pathological1.2.6 Waste Type 5, Classified1.3 SYSTEM DESCRIPTION1.3.1 Waste Reduction1.3.2
3、 Heat Recovery Boiler1.3.3 Special Tools1.4 SUBMITTALS1.5 QUALITY ASSURANCE1.5.1 Pollution Control1.5.1.1 Gaseous Emissions1.5.1.2 Particle Size and Particulate Limits1.5.2 Noise Level1.5.3 Electromagnetic Interference Control1.5.4 Welding1.5.5 Prohibition of Asbestos1.5.6 Conformance with Agency Re
4、quirements1.5.7 Permits1.5.8 Detailed Installation Drawings1.6 DELIVERY, STORAGE, AND HANDLING1.7 EXTRA MATERIALSPART 2 PRODUCTS2.1 MATERIALS AND EQUIPMENT2.1.1 Standard Products2.1.2 Nameplates2.1.3 Equipment Guards and AccessSECTION 11 82 20 Page 1Provided by IHSNot for ResaleNo reproduction or ne
5、tworking permitted without license from IHS-,-,-2.2 ELECTRICAL WORK2.3 INCINERATOR2.3.1 Type of Unit and Unit Capacity2.3.2 Unit2.3.2.1 Supports2.3.2.2 Access Doors2.3.3 Minimum Design Requirements2.4 FURNACE CONSTRUCTION2.4.1 General2.4.2 Lubrication2.4.2.1 Lubrication Fittings2.4.2.2 Lubrication E
6、quipment, 6.9 MPa 1,000 psi and Higher2.4.3 Lifting Attachments2.4.4 Accessibility2.4.5 Interchangeability2.4.6 Fastening Devices2.4.7 Electrical2.4.8 Castings and Forgings2.4.9 Welding, Brazing, Soldering, Riveting, or Wiring2.4.10 Incinerator Furnace Lining2.4.11 Castable Refractory2.4.12 Refracto
7、ry Wall Construction2.4.13 Insulation2.4.14 Expansion Joints2.4.15 Exterior Walls of the Furnace2.4.16 Primary Chamber2.4.17 Secondary Chamber2.4.18 Primary and Secondary Cowling2.4.19 Grates2.4.19.1 Stoker Design2.4.19.2 Stoker or Ram Operation2.4.20 Furnace Doors2.4.20.1 Mechanical Charging Doors2
8、.4.20.2 Stoking and Cleanout Doors2.4.21 Observation Ports2.4.22 Test Holes2.4.23 Safety Devices2.4.24 Freeze Protection2.4.25 Incinerator Cooling System2.5 INCINERATOR AUXILIARY EQUIPMENT2.5.1 Charging Method2.5.1.1 Feed Hopper2.5.1.2 Charging Ram2.5.2 Auxiliary Burners2.5.2.1 Oil Burners2.5.2.2 Me
9、chanical Pressure Atomizer2.5.2.3 Air Jet Atomizer2.5.2.4 Air Register2.5.2.5 Throat Openings2.5.2.6 Electric Ignition System2.5.3 Fuel Oil System2.5.4 Fuel-Oil Piping2.5.5 Fuel-Oil Storage Tank2.5.6 Gas Meter2.5.7 Stack2.5.8 Breaching2.5.9 Draft Equipment2.5.9.1 Combustion Air Damper2.5.9.2 Flue Ga
10、s DamperSECTION 11 82 20 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.5.9.3 Blowers2.5.9.4 Draft Fans2.5.9.5 Control Equipment2.5.9.6 Air Ducts2.5.10 Heat Recovery System2.5.11 Ash Removal2.5.11.1 Ash Pits2.5.11.2 Drag Chain Conveyor2.5.11
11、.3 Elevator Conveyor2.5.12 Steam Piping2.6 COMBUSTION CONTROL EQUIPMENT2.6.1 General2.6.2 Equipment2.6.3 Combustion Control2.6.4 Incinerator System Operation Sequence2.6.5 Controllers2.6.5.1 Automatic Controller2.6.5.2 Fuel-Flow, Air-Flow Type2.6.6 Damper Control2.6.7 Fuel Feed Controls2.6.8 Burner
12、Controls and Safety System2.6.8.1 Incinerator Burners2.6.8.2 Combustion-Safety Controls System2.6.8.3 Purge Timer2.6.8.4 Safety Shutdown Interlocks2.6.9 Combustion Temperature Control2.6.9.1 Primary Combustion Chamber or Zone Controller2.6.9.2 Secondary Combustion Chamber or Zone Controller2.6.10 Dr
13、aft Fan Control2.6.11 Draft Fan Drives2.6.12 Ash System Control2.6.13 Soot Blower2.6.14 Incinerator Shutdown2.6.15 Control Panel2.6.15.1 Panel Details2.6.15.2 Identification2.6.15.3 System Diagram2.6.16 Indicating Lights2.6.17 Selector Switches2.6.18 Clock2.6.19 Recorders2.6.20 Water Meters2.6.21 An
14、nunciator2.6.22 Flame Sensor2.6.23 Temperature Indicators2.6.23.1 Thermometers2.6.23.2 Thermocouples2.6.23.3 Pyrometers2.6.24 Pressure and Vacuum Gauges2.6.25 Draft Indicator and Control2.6.26 Opacity Alarm2.7 TOOLS2.8 PAINTING AND FINISHING2.8.1 Treatment2.8.2 Incinerator Coating2.8.3 Equipment Coa
15、ting2.9 FACTORY TESTSPART 3 EXECUTIONSECTION 11 82 20 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.1 EXAMINATION3.2 MANUFACTURERS FIELD SERVICES3.3 INCINERATOR INSTALLATION3.3.1 Gas Systems3.3.2 Fuel Oil System3.3.3 Foundation3.3.4 Steel L
16、adders3.3.5 Stack Support3.3.6 Equipment Structural Support3.3.6.1 Column Base Plates3.3.6.2 Anchor Bolts3.3.7 Insulation3.3.8 Catwalks and Access Platforms3.3.9 Control System Installation3.3.10 Field Tubing3.3.10.1 Tubing Supports3.3.10.2 Air Supply3.3.11 Electrical3.3.11.1 Cable-Conductor Identif
17、ication3.3.11.2 Relays3.3.12 Field Painting3.4 TESTING3.4.1 General3.4.1.1 Schedule for Testing3.4.1.2 Visual Inspection3.4.1.3 Repairs3.4.2 Instrumentation3.4.3 Dielectric Tests3.4.4 Fuel Systems Test3.4.5 Fuel Burning Equipment Test3.4.6 Controls Test3.4.7 Performance Testing3.4.7.1 Procedure3.4.7
18、.2 Efficiency and Operating Tests Procedures3.4.7.3 Alternate Efficiency Testing Procedures3.4.7.4 Shell Temperature3.4.8 Emission Test3.5 QUALITY CONTROL3.6 FRAMED INSTRUCTIONS3.7 DEMONSTRATION- End of Section Table of Contents -SECTION 11 82 20 Page 4Provided by IHSNot for ResaleNo reproduction or
19、 networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-11 82 20 (August 2008)-Preparing Activity: USACE SupersedingUFGS-11 82 20 (October 2007)UFGS-11 82 19 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated July 2008*SECTI
20、ON 11 82 20INCINERATORS, GENERAL PURPOSE08/08*NOTE: This guide specification covers the requirements for packaged, and modular field-erected; starved, and excess air incinerators.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed item
21、s, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specif
22、ication. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).This guide specification includes tailoring options for AFCESA, NAVFAC, NASA and USACE. S
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYUFGS1182202008INCINERATORSGENERALPURPOSE 焚烧 标准规范 代替 NAVYUFGS118219PDF

链接地址:http://www.mydoc123.com/p-449619.html