1、Guidelines for Pressure Boundary Bolted Flange Joint AssemblyAN AMERICAN NATIONAL STANDARDASME PCC-12013(Revision of ASME PCC-12010)ASME PCC-12013(Revision of ASME PCC-12010)Guidelines forPressure BoundaryBolted Flange JointAssemblyAN AMERICAN NATIONAL STANDARDTwo Park Avenue New York, NY 10016 USAD
2、ate of Issuance: November 12, 2013This Standard will be revised when the Society approves the issuance of a new edition.ASME issues written replies to inquiries concerning interpretations of technical aspects of thisdocument. Interpretations are published on the ASME Web site under the Committee Pag
3、es athttp:/cstools.asme.org/ as they are issued.Errata to codes and standards may be posted on the ASME Web site under the Committee Pages toprovide corrections to incorrectly published items, or to correct typographical or grammatical errorsin codes and standards. Such errata shall be used on the d
4、ate posted.The Committee Pages can be found at http:/cstools.asme.org/. There is an option available toautomatically receive an e-mail notification when errata are posted to a particular code or standard.This option can be found on the appropriate Committee Page after selecting “Errata” in the “Publ
5、icationInformation” section.ASME is the registered trademark of The American Society of Mechanical Engineers.This code or standard was developed under procedures accredited as meeting the criteria for American NationalStandards. The Standards Committee that approved the code or standard was balanced
6、 to assure that individuals fromcompetent and concerned interests have had an opportunity to participate. The proposed code or standard was madeavailable for public review and comment that provides an opportunity for additional public input from industry, academia,regulatory agencies, and the public
7、-at-large.ASME does not “approve,” “rate,” or “endorse” any item, construction, proprietary device, or activity.ASME does not take any position with respect to the validity of any patent rights asserted in connection with anyitems mentioned in this document, and does not undertake to insure anyone u
8、tilizing a standard against liability forinfringement of any applicable letters patent, nor assumes any such liability. Users of a code or standard are expresslyadvised that determination of the validity of any such patent rights, and the risk of infringement of such rights, isentirely their own res
9、ponsibility.Participation by federal agency representative(s) or person(s) affiliated with industry is not to be interpreted asgovernment or industry endorsement of this code or standard.ASME accepts responsibility for only those interpretations of this document issued in accordance with the establi
10、shedASME procedures and policies, which precludes the issuance of interpretations by individuals.No part of this document may be reproduced in any form,in an electronic retrieval system or otherwise,without the prior written permission of the publisher.The American Society of Mechanical EngineersTwo
11、 Park Avenue, New York, NY 10016-5990Copyright 2013 byTHE AMERICAN SOCIETY OF MECHANICAL ENGINEERSAll rights reservedPrinted in U.S.A.CONTENTSForeword vCommittee Roster . vi1 Scope. 12 Introduction . 13 Training and Qualification of Bolted Joint Assembly Personnel 14 Cleaning and Examination of Flan
12、ge and Fastener Contact Surfaces . 15 Alignment of Flanged Joints 26 Installation of Gasket 27 Lubrication of “Working” Surfaces 58 Installation of Bolts 59 Numbering of Bolts 610 Tightening of Bolts 611 Tightening Sequence 1312 Target Torque Determination 1613 Joint Pressure and Tightness Testing 1
13、614 Records . 1615 Joint Disassembly . 1716 References 20Figures1 Indicator-Type Bolting for Through-Bolted Joints 112 Indicator-Type Bolting for Studded Joints . 123 Example Legacy and Alternative to Legacy Numbering Sequences for 12-BoltJoint . 144 48-Bolt Flange Bolt-Grouping Example 155 Example
14、Short Assembly Record . 176 Example Medium-Length Assembly Record . 187 Example Long Assembly Record 19Tables1M Reference Values for Calculating Target Torque Values for Low-Alloy SteelBolting Based on Target Prestress of 345 MPa (Root Area) (SI Units) . 31 Reference Values for Calculating Target To
15、rque Values for Low-Alloy SteelBolting Based on Target Prestress of 50 ksi (Root Area) (U.S. CustomaryUnits) . 42 Torque Increments for Legacy Cross-Pattern Tightening Using a Single Tool 73 Recommended Tool, Tightening Method, and Load-Control TechniqueSelection Based on Service Applications 74 Leg
16、acy Cross-Pattern Tightening Sequence and Bolt-Numbering SystemWhen Using a Single Tool 84.1 Alternative to Legacy Cross-Pattern Tightening Sequence and Bolt-Numbering System When Using a Single Tool 9iiiAppendicesA Training and Qualification of Bolted Joint Assembly Personnel 23B Description of Com
17、mon Terms . 39C Recommended Gasket Contact Surface Finish for Various Gasket Types 41D Guidelines for Allowable Gasket Contact Surface Flatness and DefectDepth . 42E Flange Joint Alignment Guidelines 48F Alternatives to Legacy Tightening Sequence/Pattern 51G Use of Contractors Specializing in Boltin
18、g Services 65H Bolt Root and Tensile Stress Areas 66I Interaction During Tightening 67J Calculation of Target Torque 68K Nut Factor Calculation of Target Torque 69L ASME B16.5 Flange Bolting Information 70M Washer Usage Guidance and Purchase Specification for Through-HardenedWashers . 71N Definition
19、s, Commentary, and Guidelines on the Reuse of Bolts . 76O Assembly Bolt Stress Determination 78P Guidance on Troubleshooting Flanged Joint Leakage Incidents . 90ivFOREWORDASME formed an Ad Hoc Task Group on Post Construction in 1993 in response to an increasedneed for recognized and generally accept
20、ed engineering standards for the inspection and mainte-nance of pressure equipment after it has been placed in service. At the recommendation of thisTask Group, the Board on Pressure Technology Codes and Standards (BPTCS) formed the PostConstruction Committee (PCC) in 1995. The scope of this committ
21、ee was to develop and maintainstandards addressing common issues and technologies related to post-construction activities andto work with other consensus committees in the development of separate, product-specific codesand standards addressing issues encountered after initial construction for equipm
22、ent and pipingcovered by Pressure Technology Codes and Standards. The BPTCS covers non-nuclear boilers,pressure vessels (including heat exchangers), piping and piping components, pipelines, andstorage tanks.The PCC selects standards to be developed based on identified needs and the availability ofvo
23、lunteers. The PCC formed the Subcommittee on Inspection Planning and the Subcommitteeon Flaw Evaluation in 1995. In 1998, a Task Group under the PCC began preparation of Guidelinesfor Pressure Boundary Bolted Flange Joint Assembly and in 1999 the Subcommittee on Repairand Testing was formed. Other t
24、opics are under consideration and may possibly be developedinto future guideline documents.The subcommittees were charged with preparing standards dealing with several aspects of thein-service inspection and maintenance of pressure equipment and piping. Guidelines for PressureBoundary Bolted Flange
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ANSIASMEPCC12013GUIDELINESFORPRESSUREBOUNDARYBOLTEDFLANGEJOINTASSEMBLY 压力 限制 螺栓 连接 法兰 联轴节 组件 指南 PDF

链接地址:http://www.mydoc123.com/p-432026.html