1、 Guide for Lay- up and Reactivation of Mobile Offshore Drilling Units GUIDE FOR LAY-UP AND REACTIVATION OF MOBILE OFFSHORE DRILLING UNITS JUNE 2017 American Bureau of Shipping Incorporated by Act of Legislature of the State of New York 1862 2017 American Bureau of Shipping. All rights reserved. ABS
2、Plaza 16855 Northchase Drive Houston, TX 77060 USA Foreword Foreword (1 June 2017) This Guide has been prepared by the American Bureau of Shipping to provide Owners guidelines for the lay-up and reactivation of Mobile Offshore Drilling Units. These guidelines are of a general nature due to the wide
3、variety of MODU configurations, geographic and metocean conditions of lay-up sites and degree of maintenance during lay-up. This Guide expands the “Laid-up” status to provide more precise definitions regarding exact status of a stacked unit. This Guide provides the following five options for laid-up
4、 life cycle status for units classed with ABS: i) Laid-up with no Record Comment ii) Laid-up with the following Record Comments: a) Laid-up Warm Stacked b) Laid-up Cold Stacked c) Enhanced Laid-up Warm Stacked d) Enhanced Laid-up Cold Stacked These conditions will be noted in the units survey status
5、 and the Record. This Guide also introduces an “Enhanced” status for a laid up unit, which means that the unit has had its lay-up location and procedures reviewed and verified by ABS in accordance with this Guide. The goal of having a unit enrolled in Enhanced lay-up is to preserve the total asset v
6、alue, potentially qualify for a reduced insurance premium while stacked, along with reducing the time and cost for reactivation. This Guide becomes effective on the first day of the month of publication. Users are advised to check periodically on the ABS website www.eagle.org to verify that this ver
7、sion of this Guide is the most current. We welcome your feedback. Comments or suggestions can be sent electronically by email to rsdeagle.org. ii ABSGUIDE FOR LAY-UP AND REACTIVATION OF MOBILE OFFSHORE DRILLING UNITS .2017 Table of Contents GUIDE FOR LAY-UP AND REACTIVATION OF MOBILE OFFSHORE DRILLI
8、NG UNITS CONTENTS SECTION 1 General 1 1 General . 1 3 Definitions . 1 3.1 Life Cycle Status “Laid-up” 1 3.3 Record Comment “Laid-up Warm Stacked” . 1 3.5 Record Comment “Laid-up Cold Stacked” . 2 3.7 “Enhanced” Record Comment . 2 5 Lay-up Surveys . 2 7 Maintenance of Record Comment 2 9 Lay-up Overvi
9、ew . 3 SECTION 2 Lay-up and Surveys of Laid-up Mobile Offshore Drilling Units . 4 1 Lay-up Procedure Requirements 4 3 Fire and Safety Requirements for all Laid-up Units 4 3.1 Fire and Safety Requirements for Units Laid-up Warm Stacked . 6 3.3 Fire and Safety Requirements for Units Laid-up Cold Stack
10、ed . 6 5 Preservation and Maintenance for all Units 6 5.1 General 6 5.3 Hull and Deck Equipment 7 5.5 Machinery Spaces and Machinery 8 5.7 Boilers . 9 5.9 Boiler Stack Openings . 9 5.11 Electrical Installation 9 5.13 Elevating and Skidding Systems . 10 5.15 Control Systems 10 5.17 Drilling Equipment
11、 . 10 5.19 Optional Lay-up Site and Station Keeping (Mooring) Arrangements 10 7 Surveys . 12 7.1 Initial Lay-up Survey 12 7.3 Annual Surveys . 12 ABSGUIDE FOR LAY-UP AND REACTIVATION OF MOBILE OFFSHORE DRILLING UNITS .2017 iii SECTION 3 Enhanced Lay-up 13 1 Submittals . 13 1.1 Overall Lay-up Procedu
12、re Describing the Following 13 1.3 Risk Assessment . 13 1.5 Mooring 14 1.7 Manning . 14 1.9 Security 15 1.11 Stability 15 1.13 Services . 15 1.15 Port and Flag State Requirements . 15 1.17 Procedures and Standards for Preservation 15 1.19 Safety Manual 15 1.21 Maintenance Plan 15 1.23 Remote Monitor
13、ing Systems 16 1.25 Repair and Maintenance Log . 16 3 Surveys . 16 3.1 Initial Lay-up Survey 16 3.3 Annual Surveys 16 SECTION 4 Reactivation of Laid-up Mobile Offshore Drilling Units 17 1 General . 17 3 Reactivation Procedures for Units with “Enhanced” Record Comment . 18 5 Hull and Outfit . 18 5.1
14、Underwater Examination . 18 5.3 Witnessing of Functional Testing or Verification of Fitness for Service . 18 7 Machinery 19 9 Elevating Systems and Cantilever Hold Downs 19 11 Electrical 20 13 Drilling Equipment . 20 15 Control Systems and Instrumentation . 20 15.1 Software 20 15.3 Hardware . 21 17
15、Cranes . 21 19 Propulsion Trials and Sea Trials . 21 21 Documentation and Certification . 21 iv ABSGUIDE FOR LAY-UP AND REACTIVATION OF MOBILE OFFSHORE DRILLING UNITS .2017 Section 1: General SECTION 1 General (1 June 2017) At the request of the owner and to assist in the maintenance of class, ABS w
16、ill review, survey, and confirm by issuance of a factual Lay-up Report, the actions taken to preserve and protect a unit in lay-up. This Guide contains those precautions and procedures considered by ABS to accomplish this objective; alternative approaches to accomplish the same may be considered. 1
17、General i) Upon the owners written notification to ABS of a units lay-up, it will be noted in the units survey status and the Record will be updated to reflect the change in status. Surveys falling due during lay-up are then to be held in abeyance until the unit reactivates, at which time they are t
18、o be brought up to date. ii) The Reactivation Survey requirements for the unit are subject to special considerations based on the survey status at the time of the commencement of lay-up, the length of the lay-up period, and the conditions under which the unit has been maintained during that period.
19、iii) Where initial lay-up preparations and procedures are reviewed and surveyed by ABS, and also verified annually by survey, consideration may be given to deducting part or all of the time in lay-up from the progression of survey intervals, or to modifying the requirements for up-dating surveys at
20、time of reactivation. iv) There are three conditions for a Unit with a Laid-up “Life Cycle State” in the Record, Laid-up with no Record Comment; Laid-up Warm Stacked with the corresponding Record Comment and Laid-up Cold Stacked with the corresponding Record Comment. The Record Comments “Laid-up War
21、m Stacked” and “Laid-up Cold Stacked” can also have the Enhanced modifier, to have Record Comments showing “Enhanced Laid-up Warm Stacked” and “Enhanced Laid-up Cold Stacked”. These conditions are described in Subsection 1/3 below. 3 Definitions 3.1 Life Cycle Status “Laid-up” All laid-up units will
22、 have a Life Cycle Status of “Laid-up”. When a unit has a “Laid-up” Life Cycle Status in the Record without any additional Record Comment, this means that the unit is out of service for an undetermined length of time. The owners have informed ABS that the unit is laid up, but no procedures for lay-u
23、p have been reviewed by ABS. While in laid up status, class surveys are held in abeyance and statutory surveys are maintained when required by the flag Administration. Prior to returning to service a Reactivation Survey in accordance with Section 4 of this Guide, including all due and overdue class
24、and statutory surveys is to be carried out. An initial layup survey and annual surveys are not required for this Life Cycle Status and no attendant Record Comment. Units with lay-up procedures, initial lay-ups surveys and periodic examinations verified by ABS will have additional Record Comments des
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ABS2272017GUIDEFORLAYUPANDREACTIVATIONOFMOBILEOFFSHOREDRILLINGUNITSPDF

链接地址:http://www.mydoc123.com/p-400827.html