API RP 95J-2006 Gulf of Mexico Jackup Operations for Hurricane Season (FIRST EDITION)《飓风季节墨西哥湾的升降操作临时建议.第1版》.pdf
《API RP 95J-2006 Gulf of Mexico Jackup Operations for Hurricane Season (FIRST EDITION)《飓风季节墨西哥湾的升降操作临时建议.第1版》.pdf》由会员分享,可在线阅读,更多相关《API RP 95J-2006 Gulf of Mexico Jackup Operations for Hurricane Season (FIRST EDITION)《飓风季节墨西哥湾的升降操作临时建议.第1版》.pdf(24页珍藏版)》请在麦多课文档分享上搜索。
1、Gulf of Mexico Jackup Operations for Hurricane SeasonAPI RECOMMENDED PRACTICE 95JFIRST EDITION, JUNE 2006REAFFIRMED, APRIL 2013Gulf of Mexico Jackup Operations for Hurricane SeasonUpstream SegmentAPI RECOMMENDED PRACTICE 95JFIRST EDITION, JUNE 2006REAFFIRMED, APRIL 2013Special NotesAPI publications
2、necessarily address problems of a general nature. With respect to particular circumstances, local,state, and federal laws and regulations should be reviewed.Neither API nor any of APIs employees, subcontractors, consultants, committees, or other assignees make anywarranty or representation, either e
3、xpress or implied, with respect to the accuracy, completeness, or usefulness ofthe information contained herein, or assume any liability or responsibility for any use, or the results of such use, of anyinformation or process disclosed in this publication. Neither API nor any of APIs employees, subco
4、ntractors,consultants, or other assignees represent that use of this publication would not infringe upon privately owned rights.API publications may be used by anyone desiring to do so. Every effort has been made by the Institute to assure theaccuracy and reliability of the data contained in them; h
5、owever, the Institute makes no representation, warranty, orguarantee in connection with this publication and hereby expressly disclaims any liability or responsibility for loss ordamage resulting from its use or for the violation of any authorities having jurisdiction with which this publication may
6、conflict.API publications are published to facilitate the broad availability of proven, sound engineering and operatingpractices. These publications are not intended to obviate the need for applying sound engineering judgmentregarding when and where these publications should be utilized. The formula
7、tion and publication of API publicationsis not intended in any way to inhibit anyone from using any other practices.Any manufacturer marking equipment or materials in conformance with the marking requirements of an API standardis solely responsible for complying with all the applicable requirements
8、of that standard. API does not represent,warrant, or guarantee that such products do in fact conform to the applicable API standard.All rights reserved. No part of this work may be reproduced, stored in a retrieval system, or transmitted by any means, electronic, mechanical, photocopying, recording,
9、 or otherwise, without prior written permission from the publisher. Contact the Publisher, API Publishing Services, 1220 L Street, N.W., Washington, D.C. 20005.Copyright 2008 American Petroleum InstituteForewordThis recommended practice (RP) is under the jurisdiction of the API Upstream Executive Co
10、mmittee on Drilling and Production Operations (ECDPO) and was developed with guidance from and in cooperation with the International Association of Drilling Contractors (IADC) Jackup Rig Committee and the Offshore Operators Committees (OOC) Drilling Technical Subcommittee. Additionally, the Minerals
11、 Management Service (MMS) and the U.S. Coast Guard (USCG) provided general guidance and assistance in the development of the RP.Nothing contained in any API publication is to be construed as granting any right, by implication or otherwise, for the manufacture, sale, or use of any method, apparatus,
12、or product covered by letters patent. Neither should anything contained in the publication be construed as insuring anyone against liability for infringement of letters patent.This document was produced under API standardization procedures that ensure appropriate notification and participation in th
13、e developmental process and is designated as an API standard. Questions concerning the interpretation of the content of this publication or comments and questions concerning the procedures under which this publication was developed should be directed in writing to the Director of Standards, American
14、 Petroleum Institute, 1220 L Street, N.W., Washington, D.C. 20005. Requests for permission to reproduce or translate all or any part of the material published herein should also be addressed to the director.Generally, API standards are reviewed and revised, reaffirmed, or withdrawn at least every fi
15、ve years. A one-time extension of up to two years may be added to this review cycle. Status of the publication can be ascertained from the API Standards Department, telephone (202) 682-8000. A catalog of API publications and materials is published annually and updated quarterly by API, 1220 L Street
16、, N.W., Washington, D.C. 20005.Suggested revisions are invited and should be submitted to the Standards Department, API, 1220 L Street, NW, Washington, D.C. 20005, standardsapi.org.iiiContentsPage1 Scope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
17、. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12 Overview. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13 Terms and Definitions. . . . . . . . . . . . . . . . . . .
18、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14 Site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 35 Preloading Process.
19、. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 46 Air Gap . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
20、 . . . . . . 47 Unit Preparations and Evacuation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48 Post-storm Recovery . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
21、 . . . . . . . . . . . . . 59 Post-storm Inspections. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5Annex A . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
22、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7Annex B . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9Annex C . . . . . . . . . . . . . . . . . . . . . . .
23、 . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11Annex D . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
24、 13FiguresA.1 Recommended Air Gap for Jackups in Hurricane Season. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8B.1 Jackup Hurricane Data Collection Form. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10D.1 Exp
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- APIRP95J2006GULFOFMEXICOJACKUPOPERATIONSFORHURRICANESEASONFIRSTEDITION 飓风 季节 墨西哥湾 升降 操作 临时 建议 PDF

链接地址:http://www.mydoc123.com/p-400343.html