System of Systems Engineering and Process Synchronization.ppt
《System of Systems Engineering and Process Synchronization.ppt》由会员分享,可在线阅读,更多相关《System of Systems Engineering and Process Synchronization.ppt(19页珍藏版)》请在麦多课文档分享上搜索。
1、System of Systems Engineering and Process Synchronization,Jo Ann Lane jolaneusc.edu University of Southern California Center for Software Engineering, USC CSE 2008,Lane: SoSE and Process Synchronization, USC CSSE 2008,2,Overview,System of Systems (SoS) and SoS Engineering (SoSE) Environment Life Cyc
2、le Implications ICM SoS Special Case Process Synchronization in an SoSE Environment Conclusions,Lane: SoSE and Process Synchronization, USC CSSE 2008,3,Key Definitions,System of Systems (SoS) Very large systems developed by creating a framework or architecture to integrate constituent systems Typica
3、lly software-intensive and net-centric SoS constituent systems independently developed and managed SoS constituent systems have their own purpose Constituent systems can dynamically come and go from SoS System of Systems Engineering (SoSE) “The process of planning, analyzing, organizing, and integra
4、ting the capabilities of a mix of existing and new systems into a system-of-systems capability that is greater than the sum of the capabilities of the constituent parts. This processes emphasizes the process of discovering, developing, and implementing standards that promote interoperability among s
5、ystems developed via different sponsorship, management, and primary acquisition processes.” USAF 2005,Lane: SoSE and Process Synchronization, USC CSSE 2008,4,Recent Research Findings*,Many types of SoS and associated modes of SoSE Directed (example: Future Combat Systems) Acknowledged (most SoSs wit
6、h a defined SoSE team to guide, but not manage constituent systems) Collaborative (example: Internet) Virtual (examples: Web/social systems) SoSE Teams: Varying degrees of responsibility and authority Incorporating many agile-like approaches to handle Multiple constituent systems Asynchronous activi
7、ties and events Quickly take advantage of opportunities as they appear SoSE Must support multiple purposes and visions Requires significantly more negotiation Is content to satisfice rather than optimize SoSE activities map to traditional SE activities (e.g., DAG and EIA 632), but take on a differen
8、t focus and scope,* Based on USC CSSE SoSE cost model research and OSD SoS SE pilot studies,Lane: SoSE and Process Synchronization, USC CSSE 2008,5,SoSE Compared to Traditional SE Activities: Reported Differences,Architecting Architecting composability vs. decomposition (Meilich 2006) Net-friendly v
9、s. hierarchical (Meilich 2006) Prototypes/experimentation/tradeoffs Early tradeoffs/evaluations of alternatives (Finley 2006) Intense concept phase analysis followed by continuous anticipation; aided by ongoing experimentation (USAF 2005) Modeling and simulation, in particular to better understand “
10、emergent behaviors” (Finley 2006) First order tradeoffs above the component systems level (e.g., more optimal at the SoS level, instead of at the component system level) (Garber 2006) Discovery and application of convergence protocols (USAF 2005),Lane: SoSE and Process Synchronization, USC CSSE 2008
11、,6,SoSE Compared to Traditional SE Activities: Reported Differences (continued),Scope and performance Added “ilities” such as flexibility, adaptability, composability (USAF 2005) Human as part of the SoS (Siel 2006, Meilich 2006, USAF 2005) Organizational scope defined at runtime instead of at syste
12、m development time (Meilich 2006) Dynamic reconfiguration of architecture as needs change (Meilich 2006) Maintenance and evolution Component systems separately acquired and continue to be managed as independent systems (USAF 2005),Lane: SoSE and Process Synchronization, USC CSSE 2008,7,SoSE Core Ele
13、ments*,* OUSD AT&L, 2008,Lane: SoSE and Process Synchronization, USC CSSE 2008,8,SoSE Compared to Traditional SE Activities: Key Challenges for DoD SoSE,Business model and incentives to encourage working together at the SoS level (Garber 2006) Doing the necessary tradeoffs at the SoS level (Garber 2
14、006) Human-system integration (Siel 2006, Meilich 2006) Commonality of data, architecture, and business strategies at the SoS level (Pair 2006) Removing multiple decision making layers (Pair 2006) Requiring accountability at the enterprise level (Pair 2006) Evolution management (Meilich 2006) Maturi
15、ty of technology (Finley 2006),For the most part, SoSE appears to be SE+ organized in new ways and with new challenges,Lane: SoSE and Process Synchronization, USC CSSE 2008,9,Life Cycle Implications,For the SoS, the life cycle model and associated processes need to Identify and respond to change qui
16、ckly Combine both rigor and agility to provide needed SoS capabilities in the needed timeframe Provide for extensive modeling and simulation early on to Investigate alternatives and potential new technologies Understand potential SoS emergent behaviors Provide flexibility to handle the asynchronous
17、nature of constituent system upgrades and evolution For the constituent systems, the life cycle model and associate processes need to Accommodate the expanding number of stakeholders as the system becomes part of one or more SoSs Attempt to synchronize (to the extent possible) the implementation of
18、their part of SoS capabilities with other constituent systems,Lane: SoSE and Process Synchronization, USC CSSE 2008,10,What is the ICM?,Risk-driven framework for tailoring system life-cycle processes Integrates the strengths of phased and risk-driven spiral process models Synthesizes together princi
19、ples critical to successful system development Commitment and accountability of system sponsors Success-critical stakeholder satisficing Incremental growth of system definition and stakeholder commitment Concurrent engineering Iterative development cycles Risk-based activity levels and anchor point
20、milestones,Principles trump diagrams,Used by 60-80% of CrossTalk Top-5 projects, 2002-2005,Lane: SoSE and Process Synchronization, USC CSSE 2008,11,Common Risk-Driven Special Cases of the ICM,C4ISR: Command, Control, Computing, Communications, Intelligence, Surveillance, Reconnaissance. CDR: Critica
21、l Design Review. DCR: Development Commitment Review. FRP: Full-Rate Production. HMI: Human-Machine Interface. HW: Hard ware. IOC: Initial Operational Capability. LRIP: Low-Rate Initial Production. NDI: Non-Development Item. SW: Software,Lane: SoSE and Process Synchronization, USC CSSE 2008,12,Case 9
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
2000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SYSTEMOFSYSTEMSENGINEERINGANDPROCESSSYNCHRONIZATIONPPT

链接地址:http://www.mydoc123.com/p-389558.html