《ASTM C1188 - 04(2011) Standard Guide for Establishing a Quality Assurance Program for Uranium Conversion Facilities (Withdrawn 2017).pdf》由会员分享,可在线阅读,更多相关《ASTM C1188 - 04(2011) Standard Guide for Establishing a Quality Assurance Program for Uranium Conversion Facilities (Withdrawn 2017).pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: C1188 04 (Reapproved 2011)Standard Guide forEstablishing a Quality Assurance Program for UraniumConversion Facilities1This standard is issued under the fixed designation C1188; the number immediately following the designation indicates the year oforiginal adoption or, in the case of rev
2、ision, the year of last revision. A number in parentheses indicates the year of last reapproval. Asuperscript epsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This guide provides guidance and recommended prac-tices for establishing a comprehensive quality as
3、surance pro-gram for uranium conversion facilities.1.2 This standard does not purport to address all of thesafety concerns, if any, associated with its use. It is theresponsibility of the user of this standard to establish appro-priate health and safety practices and determine the applica-bility of
4、regulatory limitations prior to use.1.3 The basic elements of a quality assurance programappear in the following order:FUNCTION SECTIONOrganization 5Quality Assurance Program 6Design Control 7Instructions, Procedures & Drawings 8Document Control 9Procurement 10Identification and Traceability 11Proce
5、sses 12Inspection 13Control of Measuring and Test Equipment 14Handling, Storage and Shipping 15Inspection, Test and Operating Status 16Control of Nonconforming Items 17Corrective Actions 18Quality Assurance Records 19Audits 202. Referenced Documents2.1 ANSI Standard:2ANSI/ASME NQA-1 Quality Assuranc
6、e Program Require-ments for Nuclear Facility Applications3. Terminology3.1 Definitions:3.1.1 operationthe terms operation, operations, and op-eration activities are used interchangeably to describe collec-tively all activities and functions executed by the conversionfacility.3.1.2 special processa p
7、rocess, the results of which arehighly dependent on the control of the process or the skill ofthe operators, or both, and in which the specified quality cannotbe readily determined by inspection or test of the product.3.1.3 uranium conversion facilitya chemical processingplant whose primary function
8、 is to convert uranium oreconcentrates or uranium oxide to purified uranium hexafluo-ride.4. Significance and Use4.1 Quality assurance provides a planned and systematicapproach for establishing practices to meet requirements ofsafe facility operation and product quality.4.2 In the operation of a ura
9、nium conversion facility thereare many requirements established by regulatory bodies, codes,customers, and the facility itself. These requirements areidentified by facility management and acted upon by variousfacility groups. Implementation of the practices described inthis guide are intended to ass
10、ist with compliance with theserequirements.4.3 In the operation of a uranium conversion facility there isa potential for both chemical and radiological exposure toemployees, the public, and the environment. This potential isreduced by implementation of the practices described in thisguide. The devel
11、opment of this guide, as part of soundmanagement practice, provides a means for ensuring consis-tency between facilities, and documentation and formalizationof existing practices.4.4 To establish a quality assurance program for a uraniumconversion facility, the practices in use should be evaluatedag
12、ainst the recommended practices of this guide. Existingpractices may then be modified or new practices implementedto correct any identified deficiencies. This approach highlightsthe fact that the basic foundation of a quality assuranceprogram is already present.4.5 ANSI/ASME NQA-1 is a quality assur
13、ance standardthat is being applied broadly across the nuclear industry.1This guide is under the jurisdiction of ASTM Committee C26 on Nuclear FuelCycle and is the direct responsibility of Subcommittee C26.08 on QualityAssurance, Statistical Applications, and Reference Materials.Current edition appro
14、ved June 1, 2011. Published June 2011. Originallyapproved in 1991. Last previous edition approved in 2004 as C1188 04. DOI:10.1520/C1188-04R11.2Available from American National Standards Institute (ANSI), 25 W. 43rd St.,4th Floor, New York, NY 10036, http:/www.ansi.org.Copyright ASTM International,
15、100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United StatesNOTICE: This standard has either been superseded and replaced by a new version or withdrawn.Contact ASTM International (www.astm.org) for the latest information1NQA-1 was used as guidance in the development of theprog
16、ram elements of this guide.4.6 The program functions detailed in this guide should beselected based on the particular needs and applications at thefacility. Those activities or programs to be included in auranium conversion facility should be defined in that program.5. Organization5.1 SummaryThe org
17、anizational structure of a facility isthe basis from which authority, functional responsibility, linesof communication and interfaces are derived. Since, in everycase, facilities are composed of smaller organizations ofvarious functions, it is necessary to define the organizationalstructure and the
18、controls and responsibilities delegated to eachcomponent.5.2 Recommendations:5.2.1 Organizational StructureAll facilities have an inter-nal organizational structure. The organizational structureshould be defined and documented. This is necessary to definerelationships between groups and to assign re
19、sponsibilities forthe accomplishment of required activities. Without a definedorganizational structure, the efficiency and quality of output ofthe organization will be adversely affected. The most commonmethod of documenting the organizational structure is via theorganization chart.5.2.2 Functional
20、ResponsibilitiesEach position detailedon the organization chart should be defined. This can be donevia a position description or other method. The job descriptionshould include the functional responsibilities and relationshipto the organization.5.2.3 Levels of AuthorityIncluded with functional respo
21、n-sibilities should be the authority level of the position. Thisauthority should include decision making and approval ofactions necessary to carry out the assigned functional respon-sibility. The delegation of authority should also be addressed.This may be necessary in order to most efficiently or e
22、ffectivelyaccomplish the assigned responsibilities.5.2.4 Communication Lines of communication for formalinteraction between groups should be defined. This is espe-cially important when more than one group is responsible forthe completion or performance of an activity. Interfaces, bothinternal and ex
23、ternal to the facility, may be defined throughposition descriptions. Specific interfaces may be detailed in thequality assurance program in order to clarify or emphasize theproper protocol. It should be stressed that the quality assurancepersonnel be formally given, via appropriate lines ofcommunica
24、tion, the organizational freedom and access tomanagement to effectively perform quality assurance func-tions.6. Quality Assurance Program6.1 SummaryA quality assurance program should beestablished, documented and implemented. The programshould consist of suitable policies, programs, and writtenproce
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTM C1188 04 2011 Standard Guide for Establishing Quality Assurance Program Uranium Conversion Facilities Withdrawn 2017

链接地址:http://www.mydoc123.com/p-286736.html