ASTM G14-2004(2018) Standard Test Method for Impact Resistance of Pipeline Coatings (Falling Weight Test).pdf
《ASTM G14-2004(2018) Standard Test Method for Impact Resistance of Pipeline Coatings (Falling Weight Test).pdf》由会员分享,可在线阅读,更多相关《ASTM G14-2004(2018) Standard Test Method for Impact Resistance of Pipeline Coatings (Falling Weight Test).pdf(6页珍藏版)》请在麦多课文档分享上搜索。
1、Designation: G14 04 (Reapproved 2018)Standard Test Method forImpact Resistance of Pipeline Coatings (Falling WeightTest)1This standard is issued under the fixed designation G14; the number immediately following the designation indicates the year of originaladoption or, in the case of revision, the y
2、ear of last revision. A number in parentheses indicates the year of last reapproval. A superscriptepsilon () indicates an editorial change since the last revision or reapproval.1. Scope1.1 This test method covers the determination of the energyrequired to rupture coatings applied to pipe under speci
3、fiedconditions of impact from a falling weight.1.2 The values stated in SI units to three significant deci-mals are to be regarded as the standard. The values given inparentheses are for information only.1.3 This standard does not purport to address all of thesafety concerns, if any, associated with
4、 its use. It is theresponsibility of the user of this standard to establish appro-priate safety, health, and environmental practices and deter-mine the applicability of regulatory limitations prior to use.1.4 This international standard was developed in accor-dance with internationally recognized pr
5、inciples on standard-ization established in the Decision on Principles for theDevelopment of International Standards, Guides and Recom-mendations issued by the World Trade Organization TechnicalBarriers to Trade (TBT) Committee.2. Referenced Documents2.1 ASTM Standards:2G12 Test Method for Nondestru
6、ctive Measurement of FilmThickness of Pipeline Coatings on Steel (Withdrawn2013)3G62 Test Methods for Holiday Detection in Pipeline Coat-ings2.2 SAE Standard:Grade 52100 Steel43. Summary of Test Method3.1 This test method uses a falling fixed weight having aspecified diameter impact surface, tup, wh
7、ich is restrainedvertically and dropped from varying heights to produce impactenergies over the required range. Electrical inspection is usedto detect resultant breaks in the coating. Impact resistance isdetermined as the amount of energy required to cause penetra-tion of the coating film.4. Signifi
8、cance and Use4.1 The ability of a pipe coating to resist mechanicaldamage during shipping, handling, and installation will dependupon its impact resistance. This test method provides asystematic means for screening coating materials with regardto this property.5. Apparatus5.1 This test method can be
9、 successfully used with impactapparatus conforming to the following specifications:5.1.1 TupThe tup shall be made up from a tup body and atup nose having a combined, fixed weight of 1.361 kg (3.00 lb)and shall be used over a drop range of 0.61 to 1.22 m (2 to 4ft). With most coatings, a 1.361-kg (3.
10、00-lb) tup droppedthrough a distance of 914 mm (3 ft) yields suitable results. Thetup nose shall have a 15.875-mm (58-in.) hemispherical head.NOTE 1Frequent replacement of the tup nose can be avoided if it iscut from steel capable of being hardened to a hardness of Rockwell C/45while retaining an im
11、pact toughness of at least 15 ftlb (20.34 J). Ballbearings conforming to SAE Grade 52100 have also been found suitablefor this purpose.5.1.2 Drop TubeA tube 1.52 m (5 ft) long shall be used tocontain the tup and guide it during free fall. The drop tube shallbe constructed of steel, aluminum, or any
12、other suitably rigidmaterial and internally sized to provide a minimum of frictionto the falling tup. A scale shall be attached for measuring theheight of drop to the nearest 2.54 mm (0.10 in.).5.1.3 Specimen HolderThe base plate of the apparatusshall include a device for positioning and holding the
13、 pipespecimen on line with the axis of the vertical drop tube.NOTE 2An arrangement using a V-notch vise made of metal withspring clamp is recommended for this purpose. Glancing blows, caused by1This test method is under the jurisdiction of ASTM Committee D01 on Paintand Related Coatings, Materials,
14、and Applications and is the direct responsibility ofSubcommittee D01.48 on Durability of Pipeline Coating and Linings.Current edition approved Nov. 1, 2018. Published November 2018. Originallyapproved in 1969. Last previous edition approved in 2010 as G14 04 (2010)1.DOI: 10.1520/G0014-04R10R18.2For
15、referenced ASTM standards, visit the ASTM website, www.astm.org, orcontact ASTM Customer Service at serviceastm.org. For Annual Book of ASTMStandards volume information, refer to the standards Document Summary page onthe ASTM website.3The last approved version of this historical standard is referenc
16、ed onwww.astm.org.4Available from SAE International (SAE), 400 Commonwealth Dr., Warrendale,PA 15096-0001, http:/www.sae.org.Copyright ASTM International, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959. United StatesThis international standard was developed in accordance with i
17、nternationally recognized principles on standardization established in the Decision on Principles for theDevelopment of International Standards, Guides and Recommendations issued by the World Trade Organization Technical Barriers to Trade (TBT) Committee.1an out-of-plumb condition between drop tube
18、and pipe sample, will causeerratic test results.5.1.4 Apparatus SupportBoth the apparatus and sampleshall be firmly supported and secured to a rigid base tooptimize energy transfer from the tup to the specimen.5.2 A design for the test apparatus appears in Figs. X1.1-X1.3 of Appendix X1.5.3 Thicknes
19、s GageMeasurements of coating thicknesswill be required for this test, and shall be done in accordancewith Test Method G12.5.4 Holiday DetectorA suitable detector as specified inTest Methods G62 shall be used to locate breaks in the coatingfilm.6. Test Specimen6.1 The test specimen shall be a 406.4
20、mm (16 in.) longpiece of Schedule 40, 60.325 mm (2.375 in.) outside diametercoated pipe prepared with its surface preparation and coatingprocedures equivalent to that of production coated pipe.6.2 Seven specimens shall be required for the test.7. Conditioning7.1 The specimen shall be exposed to a ro
21、om temperature of21 to 25C (70 to 77F) for a period of 24 h before beginningthe test.8. Preliminary Measurements8.1 Measure the applied coating thickness of each specimenin accordance with Test Method G12.8.2 Place test specimen in sample holder and lightly placetup on surface of the coating. Adjust
22、 either the drop tube or theattached scale so that the wing bolt (lifting pin) is at the zeromark of the scale.8.3 Make a preliminary set of impact readings to determinethe approximate starting point for the test. This shall be doneby striking the first specimen from a height sufficient to causefail
23、ure of the coating film. Consider any penetration a failure ifit is detectable with a suitable Holiday Detector as specified inTest Methods G62.8.3.1 Reduce the height by 50 % and make a secondexploratory drop at a fresh area on the pipe surface. Continuetesting in this manner, with the correspondin
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ASTMG1420042018STANDARDTESTMETHODFORIMPACTRESISTANCEOFPIPELINECOATINGSFALLINGWEIGHTTESTPDF

链接地址:http://www.mydoc123.com/p-1244033.html