DNV RP F111-2006 Interference Between Trawl Gear and Pipelines.pdf
《DNV RP F111-2006 Interference Between Trawl Gear and Pipelines.pdf》由会员分享,可在线阅读,更多相关《DNV RP F111-2006 Interference Between Trawl Gear and Pipelines.pdf(36页珍藏版)》请在麦多课文档分享上搜索。
1、RECOMMENDED PRACTICEDNV-RP-F111INTERFERENCE BETWEEN TRAWL GEAR AND PIPELINESOCTOBER 2006Since issued in print (October 2006), this booklet has been amended, latest in April 2007. See the reference to “Amendments and Corrections” on the next page. DET NORSKE VERITASFOREWORDDET NORSKE VERITAS (DNV) is
2、 an autonomous and independent foundation with the objectives of safeguarding life, prop-erty and the environment, at sea and onshore. DNV undertakes classification, certification, and other verification and consultancyservices relating to quality of ships, offshore units and installations, and onsh
3、ore industries worldwide, and carries out researchin relation to these functions.DNV Offshore Codes consist of a three level hierarchy of documents: Offshore Service Specifications. Provide principles and procedures of DNV classification, certification, verification and con-sultancy services. Offsho
4、re Standards. Provide technical provisions and acceptance criteria for general use by the offshore industry as well asthe technical basis for DNV offshore services. Recommended Practices. Provide proven technology and sound engineering practice as well as guidance for the higher levelOffshore Servic
5、e Specifications and Offshore Standards.DNV Offshore Codes are offered within the following areas:A) Qualification, Quality and Safety MethodologyB) Materials TechnologyC) StructuresD) SystemsE) Special FacilitiesF) Pipelines and RisersG) Asset OperationH) Marine OperationsJ) Wind TurbinesAmendments
6、 and Corrections This document is valid until superseded by a new revision. Minor amendments and corrections will be published in a separatedocument normally updated twice per year (April and October). For a complete listing of the changes, see the “Amendments and Corrections” document located at: h
7、ttp:/ under category “Offshore Codes”.The electronic web-versions of the DNV Offshore Codes will be regularly updated to include these amendments and corrections.Comments may be sent by e-mail to For subscription orders or information about subscription terms, please use Comprehensive information ab
8、out DNV services, research and publications can be found at http:/, or can be obtained from DNV, Veritas-veien 1, NO-1322 Hvik, Norway; Tel +47 67 57 99 00, Fax +47 67 57 99 11. Det Norske Veritas. All rights reserved. No part of this publication may be reproduced or transmitted in any form or by an
9、y means, including pho-tocopying and recording, without the prior written consent of Det Norske Veritas.Computer Typesetting (FM+SGML) by Det Norske Veritas.Printed in NorwayIf any person suffers loss or damage which is proved to have been caused by any negligent act or omission of Det Norske Verita
10、s, then Det Norske Veritas shall pay compensation to such personfor his proved direct loss or damage. However, the compensation shall not exceed an amount equal to ten times the fee charged for the service in question, provided that the maximum compen-sation shall never exceed USD 2 million.In this
11、provision Det Norske Veritas shall mean the Foundation Det Norske Veritas as well as all its subsidiaries, directors, officers, employees, agents and any other acting on behalf of DetNorske Veritas.Recommended Practice DNV-RP-F111, October 2006Introduction Page 3IntroductionDNV-RP-F111 is issued as
12、an update to DNV Guidelines No.13 Interference between trawl gear and pipelines issued in1997. This RP replaces DNV Guideline No. 13, which will bewithdrawn. Trawl equipment has developed since 1997, and new typesof equipment (i.e. clump weights) are being used in theNorth Sea and the Norwegian Sea.
13、 The new DNV-RP-F111 includes these changes. As part of the qualification of new pipelines in the Norwe-gian Sea (Kristin, Snhvit and Ormen Lange), severalstudies and model tests of clump weight interference withpipelines have been performed. Results from these studieshave also been included in this
14、 RP.Main changesThe main changes are: Harmonisation of the design format and acceptance crite-ria with other DNV Offshore Codes. Includes increased sizes and new trawl equipment (in par-ticular clump weights used in twin trawling). Utilization of new know-how from recent pipelineprojects designing f
15、or clump weights.AcknowledgementsThe following companies sponsored this JIP: Hydro ASA Statoil DNV.The following organisations have made major contributions tothe hearing process: Reinertsen Engineering Subsea 7.DNV is grateful for the valuable input, including test results,cooperation and discussio
16、ns with these companies. DET NORSKE VERITASRecommended Practice DNV-RP-F111, October 2006Page 4 IntroductionDET NORSKE VERITASAmended April 2007 Recommended Practice DNV-RP-F111, October 2006see note on front cover Page 5CONTENTS1. GENERAL . 71.1 Introduction .71.2 Trawling aspects .71.3 Scope and a
17、pplication .81.4 Limitations .91.5 Relationship to other rules.91.6 References .91.7 Trawl-pipeline interaction phases.91.8 Units.101.9 Symbols and abbreviations.112. TRAWL DESIGN DATA . 122.1 Types of trawl gear.122.2 Basic data requirements .122.3 Most critical trawl gear.132.4 Trawl gear impact f
18、requency .133. IMPACT. 133.1 Introduction .133.2 Impact energy .133.3 Energy dissipation .133.4 Simplified response calculations .154. PULL-OVER . 174.1 Introduction .174.2 Structural modelling .174.3 Pull-over loads for trawl boards and beam trawls .174.4 Pull-over loads for clump weights.184.5 Pul
19、l-over duration Trawl boards and beam trawls .194.6 Pull-over duration - clump weight. 194.7 Response calculations . 205. HOOKING. 205.1 Introduction. 205.2 Structural model . 215.3 Snagging. 215.4 Critical span height. 215.5 Part penetration . 215.6 Wedged. 215.7 Maximum warp line force . 215.8 Res
20、ponse calculations . 216. ACCEPTANCE CRITERIA. 226.1 General. 226.2 Pipe shell - impact . 226.3 Coating - impact. 226.4 Pull-over. 236.5 Hooking. 247. COATING IMPACT TESTING. 247.1 General. 247.2 Specimens. 247.3 Test equipment . 257.4 Test procedure. 267.5 Test-rig calibration . 268. BIBLIOGRAPHY .
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- DNV RP F111 2006 Interference Between Trawl Gear and Pipelines

链接地址:http://www.mydoc123.com/p-115528.html