SANS 10802-2010 Ductile iron pipelines - Hydrostatic testing after installation《高强度铸铁管道 安装后水压试验》.pdf
《SANS 10802-2010 Ductile iron pipelines - Hydrostatic testing after installation《高强度铸铁管道 安装后水压试验》.pdf》由会员分享,可在线阅读,更多相关《SANS 10802-2010 Ductile iron pipelines - Hydrostatic testing after installation《高强度铸铁管道 安装后水压试验》.pdf(10页珍藏版)》请在麦多课文档分享上搜索。
1、 Collection of SANS standards in electronic format (PDF) 1. Copyright This standard is available to staff members of companies that have subscribed to the complete collection of SANS standards in accordance with a formal copyright agreement. This document may reside on a CENTRAL FILE SERVER or INTRA
2、NET SYSTEM only. Unless specific permission has been granted, this document MAY NOT be sent or given to staff members from other companies or organizations. Doing so would constitute a VIOLATION of SABS copyright rules. 2. Indemnity The South African Bureau of Standards accepts no liability for any
3、damage whatsoever than may result from the use of this material or the information contain therein, irrespective of the cause and quantum thereof. ISBN 978-0-626-23898-8 SANS 10802:2010Edition 1ISO 10802:1992Edition 1SOUTH AFRICAN NATIONAL STANDARD Ductile iron pipelines Hydrostatic testing after in
4、stallation This national standard is the identical implementation of ISO 10802:1992 and is adopted with the permission of the International Organization for Standardization. Published by SABS Standards Division 1 Dr Lategan Road Groenkloof Private Bag X191 Pretoria 0001Tel: +27 12 428 7911 Fax: +27
5、12 344 1568 www.sabs.co.za SABS SANS 10802:2010 Edition 1 ISO 10802:1992 Edition 1 Table of changes Change No. Date Scope National foreword This South African standard was approved by National Committee SABS SC 138C, Water and sanitation Equipment and systems Cast and ductile iron pipes and fittings
6、, in accordance with procedures of the SABS Standards Division, in compliance with annex 3 of the WTO/TBT agreement. This SANS document was published in March 2010. INTERNATIONAL STANDARD ISO 10802 First edition 1992-12-15 Ductile iron pipelines - Hydrostatic testing after installation Canalisa tion
7、s en fon te ductile - Essais hydrostatiques apr b) the availability of suitable water; c) the number of fittings and accessories (e.g. valves, hydrants, etc.) constituting the Pipeline; d) the differente in elevation between different Parts of the Pipeline. 4.1.2 For pressure pipelines, the length o
8、f the test sections shall not exceed 1 500 m unless otheiwise specified. 4.1.3 For non-pressure pipelines, the test section is usually the total length between consecutive manholes or inspection Points. If special arrangements are made to enable testing over only part of the length between manholes
9、and inspection Points, then the length of the test section shall not exceed 1 000 m unless otherwise specified. 1 SANS 10802:2010This s tandard may only be used and printed by approved subscription and freemailing clients of the SABS .ISO 10802:1992(E) 4.2 Anchoring and closures 5.1 Pressure pipelin
10、es 4.2.1 Pressure pipelines All changes in direction and/or Cross-section of the Pipeline, such as bends, tees, tapers (reducers) and blank flanges, shall be adequately restrained (or an- chored) before testing by means of thrust blocks or restraining (self-anchoring) joints. The design of the restr
11、aining (anchoring) devices shall take due consideration of the test pressure to be ap- plied. Isolation of the test sections shall be achieved by us- ing blank flanges or other types of closures. If, for practical reasons, valves are used as closure pieces, the test pressure shall not exceed the rat
12、ed pressure of the valves. When evaluating the Overall leakage al- Iowance for a test section, due consideration shall be taken of the allowable leakage rate(s) of the valve(s). 4.2.2 Non-pressure pipelines 5.1 .l Preliminary operations 5.1.1.1 After filling and before application of the test pressu
13、re, maintain the test section at the working pressure for a sufficient period of time for it to stabil- ize with respect to line movement under pressure, water absorption by the lining, etc. Inspect visually all exposed joints, fittings, anchorages and closures and repair all defects, after draining
14、 the test section if necessary. 5.1.1.2 When the visual inspection is satisfactory, raise the pressure steadily until the test pressures , specified in 5.1 .1.3 and 5.1 I.4 are attained. 5.1.1.3 The test pressure at the lowest Point of the test section shall be not less than the limit specified in a
15、) or b), whichever is greater. Anchoring of non-pressure pipelines is not usually necessary owing to the low test pressure applied. a) for working pressures less than or equal to 10 bar: l,5 times the working pressure; 4.3 Partial backfilling before testing for working pressures greater than 10 bar:
16、 the working pressure plus 5 bar; Pipelines are normally tested after backfilling. How- ever, when particular conditions necessitate that pressure testing be carried out before completion of backfilling or with the pipe joints accessible for examination, sufficient backfill material shall be placed
17、over the pipe barrel between the joints to prevent movement, and due consideration shall be given to restraining thrust forces during the test. In particular, restrained-joint Systems which derive their stability from the interaction of the pipe and soil should be backfilled Prior to testing. b) the
18、 maximum working pressure. The test pressure shall not exceed - the maximum test pressure specified in the stan- dards applicable to the pipes, fittings, flanges and accessories, or - the design pressure of the restraining or anchoring devices. 4.4 Filling with water Filling should normally be carri
19、ed out at the lowest Point of the section to be tested and at a rate slow enough to ensure that all air is evacuated. 5.1.1.4 The test pressure at the highest Point of the test section shall not be less than the working press- ure at this Point. 5.1.2 Pressure test The Pipeline shall have air-ventin
20、g facilities at all high Points. As a guide, the flow-rate during filling should not exceed 10 % of the design working flow-rate. 5.1.2.1 Falling pressure test Maintain the test pressure constant to + 0,l bar, by pumping if necessary, for a period of at least 1 h. Then disconnect the pump and allow
21、no further water to enter the test section for a period of at least Cement mortar lined pipelines require a period of time after filling (depending on site hygrometric conditions) for absorption by the lining to take place. 5 Test procedure 1 h for DN 1 400 At the end of this period, measure the pre
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SANS108022010DUCTILEIRONPIPELINESHYDROSTATICTESTINGAFTERINSTALLATION 强度 铸铁 管道 安装 水压试验 PDF