SANS 10120-5 NB-1981 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section NB R.pdf
《SANS 10120-5 NB-1981 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section NB R.pdf》由会员分享,可在线阅读,更多相关《SANS 10120-5 NB-1981 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section NB R.pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、 Collection of SANS standards in electronic format (PDF) 1. Copyright This standard is available to staff members of companies that have subscribed to the complete collection of SANS standards in accordance with a formal copyright agreement. This document may reside on a CENTRAL FILE SERVER or INTRA
2、NET SYSTEM only. Unless specific permission has been granted, this document MAY NOT be sent or given to staff members from other companies or organizations. Doing so would constitute a VIOLATION of SABS copyright rules. 2. Indemnity The South African Bureau of Standards accepts no liability for any
3、damage whatsoever than may result from the use of this material or the information contain therein, irrespective of the cause and quantum thereof. SARS 0120 : Part 5 Sect ion NR-1981 Railway sidings (trackwork) Clause 1 . 1.1 2 . 2.1 2.2 2.3 2.4 3 . 3.1 3.1.1 3.1.2 3.1.3 3.1.4 3.1.5 3.1.6 3.2 3.2.1
4、3.2.2 3.2.3 3.2.4 3.2.5 3.2.6 3.2.7 3.2.8 3.2.9 3.2.10 4 . 4.1 4.2 4.2.1 PART 5 : CONTRACT ADMINISTRATIOM SKCTION NB CONTENTS START OF CONSTRUCTION General . IMMEIIIATEI. Y AITER THE HANDING OVER OF THE SITE Approval of Workmanship and Materials Drawings and Inscructions Setting Ouc Ballast Samples
5、DURING CONSTRUCTION Adminiscracion . Approval of materials Special rails Occupation . Welding SARs approval . Races (payment) for the rectifying of mismatches of rail! Details of Construction Methods General . Baccered rail ends Excessively worn rails . Fishplating Welding of rail joints . Wood slee
6、pers Concrete sleepers Gauging Measuring of expansion gaps Boundary fences QUALITY CONTROL AND OTHER CONSIDERATIONS . Lessons from Construction Failures . Lessons from Mediations. Arhicrations. and Court Cases . Employer provides material . Page Number November 1981 Approved by the COUNCIL OF THE SC
7、UT h) the time nvailable for carrying out the work; c) the number of days advance warning thac must be gtven to the PWI and the local System Manager hy the engineer (and thus by the contractor to the engineer); and d) whether the work is to he carried out under occnpation conditions or during ordina
8、ry working hours. SETTING OUT (Suhclause 5.2.2). The contractor sliould note that. in terms of SARS 1200 NB, he is responsible for setting out the siding and for completLng the work without any significant deviation from the drawings. BALLAST SAMPLES (Subclause 3.2.14) The contractor should submit s
9、amples and the grading analysis oE stone that he proposes to use for ballast timeously. The engineer should ensure that he gives approval expeditiously. DURING CONSTRUCTION Approval of Materials Where it is proposed to use materials that are not OF the same types as ore used by the SAR, provide ampl
10、e time to obtain the prior approval of the SARfs Chief Civil Engineer. Before any platelaying work is undertaken the contractor should arrange For the Pm1 that are to he used to be inspected and approved by a responsible official from the SAR (such as the PWI) so as to ensure that no material is rej
11、ected after trackwork has been completed. Special Rails (Subclause 5.2.6.2). As special rails are not supplied hy the SAR, the contractor sho111d make his own arrangements if they are required. Occpation. Acting npon the instructions issued in terms of 2.2, the contractor should give che engineer ti
12、meom warning of each dace by which construction will have advanced to the stage nc which occnpa tion, if required, should be oh tained. When a dace and time has been set for occupation, steps should he taken to ensure thac all material is ready and in position, thac the necessary labour is available
13、, and that all plant and equipment are in good working order and waiting before the time set for the start oE the occupation. krtng the occttpation close supervision of the work should be maintained to ensure that it is completed within the allocated period. Welding. If welding of joints is to be ca
14、rried out, the concmctor should arrange for chz welders to undergo. and pass, the SAR Welding Inspectors test early enough to avoid delays to the work program (see 3.2.5). SARS 0120 : Part 5 Section NB-1981 Railway sidings (trackwork) SARIS Approval (Suhclause 7.2.2). The contractor should ensure, e
15、arly in the constructlcm process, thac the standard of workmanship, particularly as regards gauge and supereleva tion, confc ns to the PWIs interpretation of the relevant specif ications, so chat approval will he obtained rtadi1 y when the work is finished. (See also 3.1.1.2.) Rates (Payment) for th
16、e Rectifying of Mismatches of Ralls (Clause 8) Where the employer has supplied second-hand rails that require rectiEying and no provision has been made in the schedule for rates CO cwer such work. the engineer should obtain quotations from the concractor for each of the procedures given in Suhclause
17、 5.2.6.1 of SARS 1200 NU to recti.Fy mismacches before advising the contractor which method is to he used and where. If second-hand rails are supplied by the contractor. the tendered rates should cover the cost of making good mismatches at joints. DETAILS OF CONSTRUCTION METHODS General. The concrac
18、tor should construct the siding in accordanve wich the requirements of Part R of the SARIS private sidings publicationl) and pay particular attention to clearances, superelevocion, and sleeper spacing. (See Drawing NB-4 in SARS 1200 NB.) Battered Rail Ends. Subject to the requirements of Suhclause 3
19、.2.2(a) and (b) of SARS 1200 NB, the concractor should crop rail ends that are hatrered in excess of 2 mm in height, over a lt,ngth oC 150 mm or less, in such a way that one remaining fishholt hole is serviceahle. He should then clrill an additional fishbolt hole. Excessively Worn Rails. The concrac
20、tor should remove from the track any rail the height of which is below the value given for Class R (or such other class as is required in terms of the coritract), or if the side wear is more than the maximum side wear permitted in cenns of Suhclause 3.2.2(c) of SARS 1200 NB. 3.2.4 Fishplattn. Fishpl
21、ates should be cleaned hy wire brushing and g;reased along the fishing, surfaces with heavy graphite grease before being placed in position on the rails, and all Eishholts anc nuts should he oiled hefore use. Threaded rail fastenings should be torqued to approximately 340 N.m. Second-hand fishplates
22、 should not be used if, after the holts have heen tightened, the rtmaining draw is less than 5 mm. 3.2.5 Welding of Rail Joints. Exochenic welding of rail joints in thr. track should not be done by any person who has not passed the SAR Welding Inspectors test. Welding should be in accordr,nce with A
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SANS101205NB1981CODEOFPRACTICEFORUSEWITHSTANDARDIZEDSPECIFICATIONSFORCIVILENGINEERINGCONSTRUCTIONANDCONTRACTDOCUMENTSPART5CONTRACTADMINISTRATIONSECTIONNBRPDF

链接地址:http://www.mydoc123.com/p-1028626.html