AIR FORCE MIL-R-38956 C-1973 RACK BOMB EJECTOR AIRCRAFT MAU-50 A《MAU-50 A型飞机炸弹发射器机架》.pdf
《AIR FORCE MIL-R-38956 C-1973 RACK BOMB EJECTOR AIRCRAFT MAU-50 A《MAU-50 A型飞机炸弹发射器机架》.pdf》由会员分享,可在线阅读,更多相关《AIR FORCE MIL-R-38956 C-1973 RACK BOMB EJECTOR AIRCRAFT MAU-50 A《MAU-50 A型飞机炸弹发射器机架》.pdf(16页珍藏版)》请在麦多课文档分享上搜索。
1、L, MIL-R-375bC LO E 7777906 0305540 -1 b MIL-R-38956C (USAF) 18 April 1973 SUPERSEDING MIL-R-38956B(USAF) 16 April 1969 MILITARY SPECIFICATION RACK, BOMB EJECTOR, AIRCRAFT mU-5O/A 1. SCOPE 1.1 Scope. ment designated as Rack, Bomb Ejector, Aircraft MAU-50/A, hereafter referred to as the rack, for car
2、riage and release (either freefall or forced ejection) of stores up to the 2000 pound class. This specification cwers the requirements for one type of equip- 2. APPLICABU DOCUMENTS 2.1 The following documents, of the issue in effect on the date of invitation for bids, form a part of this specificati
3、on to the extent specified herein. *SPECIFICATION Federal PPP-B-601 PPP-B-636 PPP-c-843 Military MIL-P-U MIL-D-1000 MI ET-774 3 MI L-Q-9858 1-45662 STANDARDS Military MIL-STD-O MIL-STD-l.2 9 MI ESTD-14 3 MI ESTD-202 MIL-STD-785 MI L-STD -810 Boxes, Wood, Cleated-Plywood Boxes, Shisping, Fiberboard C
4、ushioning Material, Cellulose Freservation, Methods of Drawings, Engineering and Associated IXsts Testing, Store Suspension Equipment, General Specification For Quality Control System Requirements Caiibrat ion System Requirements Marking for Shipment arid Storage Identification Marking of U.S. h5lit
5、ary Property Specifications and Standards; Order of Precedence for the Selection of Test Nethods for Electronic and Electrical Component Wrts Requirements for 3eliability Frogram (For Systems and Equipment ) Ehvironmental Test Kethods for Aerospace and round Euuipment THIS DOCUMENT CONTAINS With App
6、ropriate Test Methods DRAWINGS Air Force 643.320 Rack, Bomb Ejector, Aircraft M4U-50 Assembly Of 64513ii5 Electrical Assembly and Schematic Bomb Ejector Rack (Copies of specifications, standards, drawings, and publications required by suppliers in connection with specific procurement functions shoul
7、d be obtained from the procuring activity or as directed by the contracting officer.) 3. REQuIREMEms *3.1 Qualification. The racks furnished under this specification sbaL1 be products that have been tested and passed the qualification tests specified herein, and have been listed or approved for list
8、ing on the applicable quali- fied products list at the time set for opening of bids. 3.2 Components. 3.2.1 Selection of materials. Specifications and standards of aU. usterials and parts, and Government certification and approval of processes and equipment which are not specificaliy designated herei
9、n and which are necessary for the execution of this specification, shall be selected in accordance with 3.2.2 Weight reduction. The contractor shall make every effort to hold to a minimum the equipments overall weight without impairing the function, opera- tion or durability. All changes that are re
10、quired to accomplish weight reduction shall be subject to mitten approval by the procuring agency prior to incorporation, MIL-STD-143 3.3 Design and construction, 3.3.1 The rack shall be constructed in conformance to drawing 64513120 and subsidiary drawings . 3.3.1.1 Precedence. and the drawings, th
11、e specification shall govern. in the event of any conflict between this specification 3.3.2 and completely interchangeable with each other with respect to installation and performance . craft to aircraft. MIL-D-1000 shall apply and new drawings shall be prepared as required. Interchangeability. All
12、parts having the same number shall be directly The rack skias be completely interchangeable from air- When parts are not interchangeable, the criteria listed in 3.4 Performance. by means of a cartridge-actuated mechanism which shall allow either a freefall The rack shall be capable of suspending and
13、 releasing stores 2 Licensed by Information Handling ServicesMIL-R-375bC 10 7997906 03055q2 T I drop or forced ejection of all stores up to the 2000 pound class having 14 inch lug spacing and a diameter between 9.00 and 30 inches. for dive, horizontal, and other type bombing. 3.4.1 Forced ejection.
14、velocity of store, reactiori forces and the flight attitude of the store shall be controlled by orifices which are placed in the gas system and which meter the flow of gases to the ejection pistons. The rack is designed When forced ejection of the store is desired, the *3*4.2 Conventional weapon arm
15、ing control. The nose, center, and tail solenoid operated arming controls shall operate from an 18 to 30 vdc parer supply and shaU. each iOns, ex- cluding cartridge failure, C. Reliability failure, The bomb rack shall be constructed as specified herein and successfully complete the tests of paragrap
16、h 4.7, “est methods,“ of this specification with no lly advise the procuring activity of all defects likelyto be found and methods of correcting theme 4.5 Test conditions. test under “4.7 Test methods . I Each rack shall be subjected to the individual One sample shaU be selected at random by the qua
17、lity Prior to being sub- Sampling tests shall consist of the sampling tests When the sample rack fails to meet the specified The investigation of a test milure If so, the Test conditions shall be. as specified in each specific 4.6 Quality control requirements . a quality control system acceptable to
18、 the government for the equipment covered by this specification, with Specification MIL-e tensile strength of 160,000 psi. A 2000 pound simulated store as shown in Figure 1 shall be installed on the rack. each end of the rack shall be torqued to a total of 840 f 50 inch pounds, The torque shall be a
19、pplied incremently by turning each bolt of a set approximately the same number of turns. 4.7.3.1.2 Test procedure. the simultaneous imposition of loads for each condition along or about, as applicable, the axes shown in Figure 1. first be imposed inincrements of 10 per cent of design load until 100
20、per cent of design load is reached, then in increments of 5 per cent of design load until il5 per cent of design load is reached. at each per cent increment for three minutes before proceeding to the next per cent increment after 60 per cent of the design load is attained. loading shall not exceed 5
21、 per cent of the design lads per second, load of 115 per cent of design load has been reached and held for three minutes, the load shall be relieved to zero and the rack inspected. simulated store shall be manually released and the position of the rack in the fixture shall be reversed. permnent defo
22、rmation shall be cause for rejection. shown in Table II. The set of sway braces at The yield load test of the rack shall consist of For each condition the loads shall The loads shall be held The rate of When a The Test Set-up and procedures shall be repeated. Design loads shall be as 7 Licensed by I
23、nformation Handling Services14 INCH HOOKS CONDITION NUMBER P x lbs y Us z LBS !x IN-BS My In-Lbs MZ IN-LBS 1 2903 7200 16%) 13900 -104750 -80500 2 3590 6650 2400 i1650 -12- -74700 3 -2265 3880 -1070 48500 128000 48300 4 -1970 2820 -190 35200 117200 34800 4.7.3.2 Ultimate strength test, 4,7,3.2.1 Tes
24、t Set-up. for the YIELJ) LQAD TEST. The test Set-up for this test shall be as specified 4.7.3.2.2 Test procedure. yield load test up to U5 per cent of the design lad, except thatEtfter li5 per cent of the design load has been reached, loading shall continue in 5 per cent increments of the design loa
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
5000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- AIRFORCEMILR38956C1973RACKBOMBEJECTORAIRCRAFTMAU50AMAU50A 飞机 炸弹 发射器 机架 PDF

链接地址:http://www.mydoc123.com/p-428355.html