SANS 10120-5 LC-1981 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section LC C.pdf
《SANS 10120-5 LC-1981 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section LC C.pdf》由会员分享,可在线阅读,更多相关《SANS 10120-5 LC-1981 Code of practice for use with standardized specifications for civil engineering construction and contract documents Part 5 Contract administration Section LC C.pdf(6页珍藏版)》请在麦多课文档分享上搜索。
1、 Collection of SANS standards in electronic format (PDF) 1. Copyright This standard is available to staff members of companies that have subscribed to the complete collection of SANS standards in accordance with a formal copyright agreement. This document may reside on a CENTRAL FILE SERVER or INTRA
2、NET SYSTEM only. Unless specific permission has been granted, this document MAY NOT be sent or given to staff members from other companies or organizations. Doing so would constitute a VIOLATION of SABS copyright rules. 2. Indemnity The South African Bureau of Standards accepts no liability for any
3、damage whatsoever than may result from the use of this material or the information contain therein, irrespective of the cause and quantum thereof. SABS 0120 : Part 5 Section U-1981 Cable ducts PART 5 : CONTRACT ADMINISTIWSION SECTION LC CONTENTS Clause Page Number . STAKJ 01 CONSTRUCTION I Instructi
4、ons to Cormence Work I 1I.DIEDlATELY AFTEK TllE HANDING OVER OF THE SITE . 1 Location of Ducts/Cables . 1 DURING CONSTRUCTION 1 Administration . I . Preliminary planning 1 Program of construction I Construction Methods . I Trenching I Laying of pipes l Jointing of pipes 2 (IUALIlY CUNTKOL AND OTHEK
5、CONSIDERITIONS . 2 General 2 IJisputes, Mediations, Arbitrations, and Court Cases 2 Drawing LC-5.1 - Joining Pitch-Impregnated Fibre Pipes 3 November 1981 Approved by the COUNCIL OF THE SOUTH AFRICAN BUREAU OF STANDN(DS SARS 0120 : Part 5 Section LC-1981 Cable ducts NOTE: The clause number(s) given
6、at the beginning or arter tllv heading of a clause is/are. unless otherwise stated, the numher(s) of the relevant clause(s) of SARS 1200 LC. START OF CONSTRUCTION INSCRUCPLONS TO COMMENCE WORK. For the purposes of this part of the code, contract ndministration starts with instructions to the contrac
7、tor to commence work as set out in Sobclause 4.1 of Scct Con 0. IMNEI)LATELY AFrER THE HANDING OVER OF THE SITE LOCATION OF UUCTSfCARLKS. The engineer should ensure that the contractor knows the exact location in which ducts must be constructed and cables laid and also the date on which the work is
8、expected to commence. DURING CONSTRUCTION Preliminary Planning. The contractor should appreciate tlmt lead time may he required by the manufac- turer or the GPO, as applicable, for the supply of large quantities of pipes. A responsible person should always be on hand at the oCE-loading site to check
9、 and endorse each weighbill or delivery note. Program of Construction. The engineer should ensure that all parties involved are aware of changes in the actual program of constructLon so as to avoid situations siwh as the opening up or backfilling of cable trenches when there is a risk of settlement
10、of work carried out by others. Trencl*. Sec Subclause 2.3 of Section DR. Laying of Pipes (Subclauses 5.2.2 and 5.3.1). Where a PVC pipeliue is jointed with positive solvent- welded jolnts, the effect oE the change in temperature during pipe laying may be reduced hy making the joints at ground level.
11、 lowering the pipeline into the trench, and then filling the pipeline with water. The fjlling with water has the further eEEect of providing some internal support to the walls of the pipe during hackfllling. After the pipe has been firmly and uniformly bedded, backfill should be placed in the trench
12、. up to the level of the top of the pipe, in layers of thickness not exceeding 150 mm. Each layer should be compacted to the specified density. Care should be taken to avoid a sideways shift of the pipe. During compaction the moisture content of the backfill should be within 2 X of OEIC. Where sheet
13、ing is used, the backfill should be placed as the sheeting is pulled (to prevent voids being left adjacent to the bedding). After the sLde fills have been compacted to the required density, a 300 mm thick layer of the same material should be placed over the top of the pipe and tamped lightly. Excess
14、ive tamping of this layer shon?d be avoided as it may result in distortion of the pipe. The trench should be kept clear of water until backfilling has been completed. The remainder of the hackfill should be placed and compacted in uniEorm layers so as to completely fill the trench, with no unfilled
15、spaces in the backfill. No rolling or heavy mechanical compaction should be done until at least h00 mm of material has been placed over the pipe. When pipes oE length oE the order of 6 m are laid, it may be found that, owing to storage in warm conditions without complete and level support, or for ot
16、her reasons, the pipes are slightly bowed. T.f a close conformity to line and gradient is required, it will be necessary to check and adjust the straightness and gradient of pipes at intervals more frequent than at pLpe ends only. Such pipes should be laid on the consolidated underbed with the how c
17、oncave upward and the how straightened by loading the two ends with hackfill (leaving a space at the joints for jointing and test observation) and carefully consolidating at the sides and over the pipe to bring the top of the pipe to true line and level (as checked by line and boning rod, or other m
18、eans of suitable accuracy), con- tinuing the process along the length of the pipe and checking Line and grade at suitahle intervals until the pipe is completely covered (except for the spaces at the joints) by properly consolidated backlil l. If the two ends of the pipeline are open and accessible a
19、nd thr pipeline is straight between them, a conflrmatory visual check may be made on the bore of the pipe by the use of a lamp and a mirror. Where pipes are to be laid in fill at, or above, natural ground level, the fill should be deposited and compacted to a height oE about 1 m above the proposed l
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- SANS101205LC1981CODEOFPRACTICEFORUSEWITHSTANDARDIZEDSPECIFICATIONSFORCIVILENGINEERINGCONSTRUCTIONANDCONTRACTDOCUMENTSPART5CONTRACTADMINISTRATIONSECTIONLCCPDF

链接地址:http://www.mydoc123.com/p-1028612.html