REG NASA-LLIS-0627-1999 Lessons Learned Criticality of Hardware Refurbishment Process.pdf
《REG NASA-LLIS-0627-1999 Lessons Learned Criticality of Hardware Refurbishment Process.pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-0627-1999 Lessons Learned Criticality of Hardware Refurbishment Process.pdf(2页珍藏版)》请在麦多课文档分享上搜索。
1、Lessons Learned Entry: 0627Lesson Info:a71 Lesson Number: 0627a71 Lesson Date: 1999-07-20a71 Submitting Organization: ARCa71 Submitted by: Dave ZimmerSubject: Criticality of Hardware Refurbishment Process Description of Driving Event: Shortly after launch of STS-90, some of the motors/air-pumps asso
2、ciated with the aquatic habitats exhibited an increased power draw indicating either motor or pump failure. To successfully complete the mission, an in-flight procedure was utilized to cross-link each habitat to an operational air pump. Upon landing and recovery, an investigation was conducted of th
3、e failed motor/air-pump assemblies to determine why some units failed while others performed normally. The investigation determined that all of the units that operated properly were original equipment manufacture units, and the units that failed had all been refurbished.Lesson(s) Learned: It was dis
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS06271999LESSONSLEARNEDCRITICALITYOFHARDWAREREFURBISHMENTPROCESSPDF

链接地址:http://www.mydoc123.com/p-1018274.html