REG NASA-LLIS-0131-1992 Lessons Learned - Environmental Control System (ECS) Pressure Distribution Unit.pdf
《REG NASA-LLIS-0131-1992 Lessons Learned - Environmental Control System (ECS) Pressure Distribution Unit.pdf》由会员分享,可在线阅读,更多相关《REG NASA-LLIS-0131-1992 Lessons Learned - Environmental Control System (ECS) Pressure Distribution Unit.pdf(2页珍藏版)》请在麦多课文档分享上搜索。
1、Lessons Learned Entry: 0131Lesson Info:a71 Lesson Number: 0131a71 Lesson Date: 1992-09-24a71 Submitting Organization: KSCa71 Submitted by: David PenningtonSubject: Environmental Control System (ECS) Pressure Distribution Unit Description of Driving Event: The environmental control system (ECS) press
2、ure distribution unit pre-operations set-up requires several flexhose connections and leak checks prior to operation. Pressure lines could be misconnected and result in damage to flight hardware or injury to personnel.Lesson(s) Learned: Similar adjacent connections on the ECS pressure distribution s
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- REGNASALLIS01311992LESSONSLEARNEDENVIRONMENTALCONTROLSYSTEMECSPRESSUREDISTRIBUTIONUNITPDF

链接地址:http://www.mydoc123.com/p-1017785.html