1、*USACE / NAVFAC / AFCESA / NASA UFGS-33 52 80 (February 2010)-Preparing Activity: NAVFAC SupersedingUFGS-33 52 80 (August 2009)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2010*SECTION TABLE OF CONTENTSDIVISION 33 - UTILITIESSECTION 33 52 80LIQUID FUELS PI
2、PELINE COATING SYSTEMS02/10PART 1 GENERAL1.1 REFERENCES1.2 SYSTEM DESCRIPTION1.3 SUBMITTALS1.4 QUALITY ASSURANCE1.4.1 Contract Errors, Omissions, and Other Discrepancies1.4.2 Corrective Action (CA)1.4.2.1 Corrective Action Procedures1.4.2.2 Implement Corrective Action1.4.3 Coating Work Plan1.4.4 Qua
3、lifications1.4.4.1 Qualifications of Certified Industrial Hygienist (CIH)1.4.4.2 Qualifications of Certified Protective Coatings Specialist (PCS)1.4.4.3 Qualifications of Coating Inspection Company for Field Coating1.4.4.4 Qualifications of Coating Inspector for Field Coating1.4.4.5 Qualifications O
4、f Individuals Performing Abrasive Blasting for Field Coating1.4.4.6 Qualifications of Individuals Performing Coating Application for Field Coating1.4.4.7 Qualifications of Individuals Operating Plural Component Equipment (Pump Tenders) for Field Coating1.4.4.8 Qualifications of Pipe Coating Shop1.4.
5、4.9 Qualifications of Coating Contractors for Field Coating1.4.5 Protective Coating Specialist (PCS)1.4.6 Pre-Application Meeting For Field Coating1.5 DELIVERY AND STORAGE1.6 COATING HAZARDS1.7 JOB SITE REFERENCES - SHOP1.8 JOB SITE REFERENCES - FIELDPART 2 PRODUCTS2.1 SHOP-APPLIED COATING FOR BURIE
6、D PIPINGSECTION 33 52 80 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.1.1 External Pipe Coating2.1.2 Internal Pipe Coating (Lining)2.2 SOURCE QUALITY CONTROL2.2.1 Test Requirements2.2.2 Coating Inspector for Shop Coating2.2.3 Shop Inspecti
7、on2.2.3.1 Inspection Requirements2.2.3.2 Inspection Report Forms2.2.3.3 Daily Inspection Reports2.2.3.4 Inspection EquipmentPART 3 EXECUTION3.1 FIELD EXTERIOR COATING OF ABOVEGROUND PIPING3.2 FIELD REPAIRS TO EXTERNAL COATING OF BURIED PIPING3.2.1 Field-Applied External Pipe Coating3.2.2 Surface Pre
8、paration3.2.3 Soluble Salt Testing3.2.3.1 Test Kit for Measuring Chloride, Sulfate and Nitrate Ions on Steel and Coated Surfaces3.2.3.2 Pre-Preparation Testing for Soluble Salts Contamination3.2.3.3 Pre-Application Testing for Soluble Salts Contamination3.2.4 Coating Application3.2.5 Final Inspectio
9、n of Pipeline Prior to Burial3.3 PROJECT IDENTIFICATION3.3.1 Stencils3.3.2 Nameplates3.4 FIELD QUALITY CONTROL3.4.1 Coating Inspector3.4.2 Field Inspection3.4.2.1 Inspection Requirements3.4.2.2 Inspection Report Forms3.4.2.3 Daily Inspection Reports3.4.2.4 Inspection Logbook3.4.2.5 Inspection Equipm
10、ent3.5 FINAL CLEANUP- End of Section Table of Contents -SECTION 33 52 80 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-33 52 80 (February 2010)-Preparing Activity: NAVFAC SupersedingUFGS-33 52 80 (August 2
11、009)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2010*SECTION 33 52 80LIQUID FUELS PIPELINE COATING SYSTEMS02/10*NOTE: This guide specification covers the requirements for interior and exterior coating of aboveground and buried, carbon steel, liquid fuel p
12、ipelines. The exterior coating system for aboveground pipelines is the same as used on the exterior of fuel tanks, Section 09 97 13.27 EXTERIOR COATING OF STEEL STRUCTURES. The exterior coating system for buried pipelines is either Extruded Polyolefin system or Fusion Bonded Epoxy coating. An option
13、al Fusion Bonded Epoxy coating is provided for the interior of pipe to protect aviation fuel from iron contamination.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of Technical Proponents, including t
14、heir organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).Use of electronic communication is encouraged.Brackets are used in the text to indicate designer choices or locations where text must be supplie
15、d by the designer.*NOTE: This guide specification is intended for coating of new pipe only. For maintenance coating of existing buried pipe, a coating inspection, or coating condition survey (CCS), as described in Section 09 97 13.27 EXTERIOR COATING OF STEEL STRUCTURES, should be accomplished prior
16、 to designing the coating project. Without a competent inspection, there is no reliable way to determine the type or condition of the existing coating system. Without knowing the existing conditions, proper (effective and financially supportable) SECTION 33 52 80 Page 3Provided by IHSNot for ResaleN
17、o reproduction or networking permitted without license from IHS-,-,-surface preparation or coating system selection cannot be made.*NOTE: This specification is the result of much experience and expertise of SSPC certified Protective Coatings Specialists.A specifier, in adapting this specification to
18、 a project, should not alter the products and processes specified herein without thorough knowledge of the need for the changes and the implications of those changes.Prior to changing or altering the products or processes specified herein, it is recommended that the specifier consult with the NAVFAC
19、 Paints and Coatings Subject Matter Expert at Naval Facilities Engineering Service Center.*NOTE: The metric standard for measuring coating thickness is microns (25.4 microns=1 mil - use nominal 25 microns=1 mil).*PART 1 GENERAL1.1 REFERENCES*NOTE: This paragraph is used to list the publications cite
20、d in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article t
21、o automatically place the reference in the Reference Article. Do not use the Reference Wizards Check Reference feature to update the issue dates, as this document is specific to the standards listed. This guide specification will be updated when the standards are updated.References not used in the t
22、ext will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the bas
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYUFGS3352802010LIQUIDFUELSPIPELINECOATINGSYSTEMS 液体燃料 管道 涂层 系统 PDF

链接地址:http://www.mydoc123.com/p-984856.html