NAVY UFGS-32 93 00-2010 EXTERIOR PLANTS《外部植物》.pdf
《NAVY UFGS-32 93 00-2010 EXTERIOR PLANTS《外部植物》.pdf》由会员分享,可在线阅读,更多相关《NAVY UFGS-32 93 00-2010 EXTERIOR PLANTS《外部植物》.pdf(37页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-32 93 00 (February 2010)-Preparing Activity: NAVFAC SupersedingUFGS-32 93 00 (July 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2010*SECTION TABLE OF CONTENTSDIVISION 32 - EXTERIOR IMPROVEMENTSSECTION 32 93 00EXTER
2、IOR PLANTS02/10PART 1 GENERAL1.1 REFERENCES1.2 RELATED REQUIREMENTS1.3 SUBMITTALS1.4 QUALITY ASSURANCE1.4.1 Topsoil Composition Tests1.4.2 Nursery Certifications1.4.3 State Landscape Contractors License1.4.4 Plant Material Photographs1.4.5 Percolation Test1.4.6 Erosion Assessment1.4.7 Pre-Installati
3、on Meeting1.5 DELIVERY, STORAGE, AND HANDLING1.5.1 Delivery1.5.1.1 Branched Plant Delivery1.5.1.2 Soil Amendment Delivery1.5.1.3 Plant Labels1.5.2 Storage1.5.2.1 Plant Storage and Protection1.5.2.2 Fertilizer, Gypsum, pH Adjusters and Mulch Storage1.5.2.3 Topsoil1.5.2.4 Root Control Barrier and Weed
4、 Control Fabric1.5.3 Handling1.5.4 TIME LIMITATION1.6 TIME RESTRICTIONS AND PLANTING CONDITIONS1.6.1 Planting Dates1.6.1.1 Deciduous Material1.6.1.2 Evergreen Material1.6.2 Restrictions1.7 GUARANTEE1.8 SUSTAINABLE DESIGN REQUIREMENTS1.8.1 Local/Regional Materials1.8.2 Plastic Identification1.8.3 For
5、est Stewardship Council (FSC) CertificationSECTION 32 93 00 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-PART 2 PRODUCTS2.1 PLANTS2.1.1 Regulations and Varieties2.1.2 Shape and Condition2.1.2.1 Deciduous Trees and Shrubs2.1.2.2 Evergreen Tre
6、es and Shrubs2.1.2.3 Ground Covers and Vines2.1.3 Plant Size2.1.4 Root Ball Size2.1.4.1 Mycorrhizal fungi inoculum2.1.5 Growth of Trunk and Crown2.1.5.1 Deciduous Trees2.1.5.2 Palms2.1.5.3 Deciduous Shrubs2.1.5.4 Coniferous Evergreen Plant Material2.1.5.5 Broadleaf Evergreen Plant Material2.1.5.6 Gr
7、ound Cover and Vine Plant Material2.2 TOPSOIL2.2.1 Existing Soil2.2.2 On-Site Topsoil2.2.3 Off-Site Topsoil2.2.4 Composition2.3 SOIL CONDITIONERS2.3.1 Lime2.3.2 Aluminum Sulfate2.3.3 Sulfur2.3.4 Iron2.3.5 Peat2.3.6 Sand2.3.7 Perlite2.3.8 Composted Derivatives2.3.8.1 Particle Size2.3.8.2 Nitrogen Con
8、tent2.3.8.3 Biobased Content2.3.9 Gypsum2.3.10 Vermiculite2.3.11 Rotted Manure2.4 PLANTING SOIL MIXTURES2.5 FERTILIZER2.5.1 Granular Fertilizer2.5.2 Fertilizer Tablets2.6 WEED CONTROL FABRIC2.6.1 Roll Type Polypropylene or Polyester Mats2.7 DRAINAGE PIPE FOR PLANT PITS AND BEDS2.8 MULCH2.8.1 Inert M
9、ulch Materials2.8.2 Organic Mulch Materials2.8.3 Recycled Organic Mulch2.9 STAKING AND GUYING MATERIAL2.9.1 Staking Material2.9.1.1 Tree Support Stakes2.9.1.2 Ground Stakes2.9.2 Guying Material2.9.2.1 Guying Wire2.9.2.2 Guying Cable2.9.3 Hose Chafing Guards2.9.4 Flags2.9.5 TurnbucklesSECTION 32 93 0
10、0 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.9.6 Deadmen2.9.7 Metal Anchors2.9.7.1 Driven Anchors2.9.7.2 Screw Anchors2.10 EDGING MATERIAL2.10.1 Wood Edging2.10.2 Recycled Plastic Edging2.10.3 Concrete Edging2.11 ANTIDESICCANTS2.12 EROSI
11、ON CONTROL MATERIALS2.12.1 Erosion Control Blanket2.12.2 Erosion Control Fabric2.12.3 Erosion Control Net2.12.4 Hydrophilic Colloids2.12.5 Erosion Control Material Anchors2.13 ROOT CONTROL BARRIER2.14 WATER2.14.1 Hose2.15 MYCORRHIZAL FUNGI INOCULUM2.16 SOURCE QUALITY CONTROLPART 3 EXECUTION3.1 EXTEN
12、T OF WORK3.2 ALTERNATIVE HERBICIDE TREATMENT (SOLARIZING SOIL)3.3 PREPARATION3.3.1 Protection3.3.2 Layout3.3.3 Erosion Control3.3.4 Soil Preparation3.3.4.1 pH Adjuster Application Rates3.3.4.2 Soil Conditioner Application Rates3.3.4.3 Fertilizer Application Rates3.3.5 Root Control Barrier3.3.6 Subso
13、il Drainage for Plant Pits and Beds3.4 PLANT BED PREPARATION3.5 PLANT INSTALLATION3.5.1 Individual Plant Pit Excavation3.5.2 Plant Beds with Multiple Plants3.5.3 Handling and Setting3.5.3.1 Balled and Burlapped Stock3.5.3.2 Bare-Root Stock3.5.3.3 Container Grown Stock3.5.3.4 Ground Covers and Vines3
14、.5.4 Earth Mounded Watering Basin for Individual Plant Pits3.5.5 Weed Control Fabric Installation3.5.6 Erosion Control Material3.5.7 Placement of Mulch Topdressing3.5.8 Mulch Topdressing3.5.9 Installation of Edging3.5.10 Fertilization3.5.10.1 Fertilizer Tablets3.5.10.2 Granular Fertilizer3.5.11 Wate
15、ring3.5.12 Staking and Guying3.5.12.1 Staking3.5.12.2 Guying3.5.12.3 Chafing Guards3.5.12.4 DeadmenSECTION 32 93 00 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.5.12.5 Wood Ground Stakes3.5.12.6 Iron Anchors3.5.12.7 Steel Screw Anchors3.5.
16、12.8 Flags3.5.13 Pruning3.5.13.1 Trees and Shrubs3.5.13.2 Wound Dressing3.6 RESTORATION AND CLEAN UP3.6.1 Restoration3.6.2 Clean Up- End of Section Table of Contents -SECTION 32 93 00 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAV
17、FAC / AFCESA / NASA UFGS-32 93 00 (February 2010)-Preparing Activity: NAVFAC SupersedingUFGS-32 93 00 (July 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2010*SECTION 32 93 00EXTERIOR PLANTS02/10*NOTE: This guide specification covers the requirements f
18、or exterior planting.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not bracket
19、s are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of Technical Proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS sh
20、ould be submitted as a Criteria Change Request (CCR).*NOTE: The following information shall be shown on the project drawings:1. All areas to be planted, with plant layout provided.2. Plant list.3. Subsurface drainage.4. Planting accessories.*PART 1 GENERAL1.1 REFERENCES*SECTION 32 93 00 Page 5Provid
21、ed by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organ
22、ization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.Referen
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYUFGS3293002010EXTERIORPLANTS 外部 植物 PDF
