《NAVY UFGS-31 62 16 16-2011 STEEL H-PILES《钢制H形桩柱》.pdf》由会员分享,可在线阅读,更多相关《NAVY UFGS-31 62 16 16-2011 STEEL H-PILES《钢制H形桩柱》.pdf(28页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-31 62 16.16 (November 2011)-Preparing Activity: NAVFAC SupersedingUFGS-31 62 16.16 (January 2008)UFGS-31 62 16.16 (April 2006)UFGS-31 62 16.00 10 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2011*SECTION T
2、ABLE OF CONTENTSDIVISION 31 - EARTHWORKSECTION 31 62 16.16STEEL H-PILES11/11PART 1 GENERAL1.1 REFERENCES1.2 BASIS FOR BIDS AND PAYMENT1.2.1 Principal Sum1.2.2 Unit Price1.2.2.1 Payment and Measurement for Furnishing and Delivering Piles1.2.2.2 Payment and Measurement for Driving Piles1.2.2.3 Payment
3、 and Measurement for Pulled Piles1.2.2.4 Payment and Measurement for Driving Tests1.2.2.5 Payment and Measurement for Load Tests1.2.2.6 Payment and Measurement for Compressive Load Tests1.2.2.7 Payment and Measurement for Tensile Load Tests1.2.2.8 Payment and Measurement for Lateral Load Tests1.2.2.
4、9 Payment and Measurement for Pulled Load Test H-Piles1.2.2.10 Payment and Measurement for Steel H-Pile Points1.2.2.11 Payment and Measurement for Steel H-Pile Caps1.2.2.12 Payment and Measurement for Steel H-Pile Splices1.2.2.13 Payment and Measurement for Steel H-Pile Tension Anchors1.3 SUBMITTALS
5、1.4 DELIVERY, STORAGE, AND HANDLING1.4.1 Delivery and Storage1.4.2 HandlingPART 2 PRODUCTS2.1 MATERIALS2.1.1 H-Piles2.1.2 Pile Splices2.1.3 Pile Points2.1.4 Pile Caps2.1.5 Pile Tension Anchors2.1.6 FABRICATION2.1.6.1 Pile SplicesSECTION 31 62 16.16 Page 1Provided by IHSNot for ResaleNo reproduction
6、or networking permitted without license from IHS-,-,-2.1.6.2 Pile Caps, Pile Points, Pile Tension AnchorsPART 3 EXECUTION3.1 PILE DRIVING EQUIPMENT3.1.1 Pile Driving Hammers3.1.1.1 Impact Hammers3.1.1.2 Vibratory Hammers3.1.2 Pile Driving Leads3.1.3 Pile Extractors3.1.4 Jetting Equipment3.2 INSTALLA
7、TION3.2.1 Lengths of Job Piles3.2.2 Pile Driving Records3.2.3 Pile Placement and Tolerances in Driving3.2.3.1 Survey Data3.2.4 Pile Penetration Criteria3.2.5 Pile Driving3.2.5.1 Splicing Piles3.2.5.2 Jetting3.2.5.3 Predrilling3.2.5.4 Heaved Piles3.2.5.5 Pulled Piles3.2.5.6 Long Piles3.2.5.7 Welding3
8、.3 PILE TESTS3.3.1 Test Piles3.3.2 Pile Driving Tests3.3.3 Dynamic Testing of Piles3.3.3.1 Test Piles3.3.3.2 Job Piles3.3.3.3 Reports3.3.4 Pile Load Tests3.3.4.1 Compressive Load Test3.3.4.2 Tensile Load Test3.3.4.3 Lateral Load Test3.3.5 Safe Design Capacity3.4 SPECIAL INSPECTION AND TESTING FOR SE
9、ISMIC-RESISTING SYSTEMS- End of Section Table of Contents -SECTION 31 62 16.16 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-31 62 16.16 (November 2011)-Preparing Activity: NAVFAC SupersedingUFGS-31 62 16.
10、16 (January 2008)UFGS-31 62 16.16 (April 2006)UFGS-31 62 16.00 10 (April 2006)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated October 2011*SECTION 31 62 16.16STEEL H-PILES11/11*NOTE: This guide specification covers the requirements for furnishing all equipment, lab
11、or, and materials (except materials specified to be furnished by the Government) and performing all operations in connection with the furnishing, installing and testing of steel H-piles in accordance with these specifications and applicable drawings.Adhere to UFC 1-300-02 Unified Facilities Guide Sp
12、ecifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate info
13、rmation.Remove information and requirements not required in respective project, whether or not brackets are present.Comments, suggestions and recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).*NOTE: Use Section 31 62 19 TIMBER PIL
14、ES.Use Section 31 62 23 COMPOSITE PILES.*NOTE: Show the following information on the project drawings:1. Location, size, and cutoff elevation of project piles.SECTION 31 62 16.16 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2. Location, size
15、, cutoff elevation, and identification of test piles.3. Subsurface soil data logs. Other subsurface data is design information and is not a part of the contract. Make data available for examination by the bidders at appropriate locations.4. Staging area.*PART 1 GENERAL1.1 REFERENCES*NOTE: This parag
16、raph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID o
17、utside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project specification when y
18、ou choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.AMERICAN WELDING SOCIETY (AWS)AWS D1.1/D1.1M (2010) Structural Weld
19、ing Code - SteelASTM INTERNATIONAL (ASTM)ASTM A27/A27M (2010) Standard Specification for Steel Castings, Carbon, for General ApplicationASTM A36/A36M (2008) Standard Specification for Carbon Structural SteelASTM A572/A572M (2007) Standard Specification for High-Strength Low-Alloy Columbium-Vanadium
20、Structural SteelASTM A588/A588M (2010) Standard Specification for High-Strength Low-Alloy Structural Steel with 50 ksi (345 MPa) Minimum Yield Point, SECTION 31 62 16.16 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-with Atmospheric Corrosion
21、 ResistanceASTM A690/A690M (2007) Standard Specification for High-Strength Low-Alloy Nickel, Copper, Phosphorus Steel H-Piles and Sheet Piling with Atmospheric Corrosion Resistance for Use in Marine EnvironmentsASTM D 1143/D 1143M (2007e1) Piles Under Static Axial Compressive LoadASTM D 3689 (2007)
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYUFGS316216162011STEELHPILES 钢制 形桩柱 PDF

链接地址:http://www.mydoc123.com/p-984839.html