1、*USACE / NAVFAC / AFCESA / NASA UFGS-01 45 00.10 20 (February 2010)-Preparing Activity: NAVFAC SupersedingUFGS-01 45 02.10 (November 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2010*SECTION TABLE OF CONTENTSDIVISION 01 - GENERAL REQUIREMENTSSECTION 0
2、1 45 00.10 20QUALITY CONTROL FOR MINOR CONSTRUCTION02/10PART 1 GENERAL1.1 REFERENCES1.2 SUBMITTALS1.3 INFORMATION FOR THE CONTRACTING OFFICER (KO)1.4 QC PROGRAM REQUIREMENTS1.4.1 Preliminary Work Authorized Prior to Acceptance1.4.2 Acceptance1.4.3 Notification of Changes1.5 QC ORGANIZATION1.5.1 QC M
3、anager1.5.1.1 Duties1.5.1.2 Qualifications1.5.1.3 Construction Quality Management Training1.5.2 Alternate QC Manager Duties and Qualifications1.6 QC PLAN1.6.1 Requirements1.7 COORDINATION AND MUTUAL UNDERSTANDING MEETING1.8 QC MEETINGS1.9 THREE PHASES OF CONTROL1.9.1 Preparatory Phase1.9.2 Initial P
4、hase1.9.3 Follow-Up Phase1.9.4 Additional Preparatory and Initial Phases1.9.5 Notification of Three Phases of Control for Off-Site Work1.10 SUBMITTAL REVIEW AND APPROVAL1.11 TESTING1.11.1 Accreditation Requirements1.11.2 Laboratory Accreditation Authorities1.11.3 Capability Check1.11.4 Test Results1
5、.12 QC CERTIFICATIONS1.12.1 Contractor Quality Control Report Certification1.12.2 Invoice Certification1.12.3 Completion Certification1.13 COMPLETION INSPECTIONSSECTION 01 45 00.10 20 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1.13.1 Punch
6、-Out Inspection1.13.2 Pre-Final Inspection1.13.3 Final Acceptance Inspection1.14 DOCUMENTATION1.14.1 Quality Control Validation1.14.2 As-Built Drawings1.15 NOTIFICATION ON NON-COMPLIANCEPART 2 PRODUCTSPART 3 EXECUTION- End of Section Table of Contents -SECTION 01 45 00.10 20 Page 2Provided by IHSNot
7、 for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-01 45 00.10 20 (February 2010)-Preparing Activity: NAVFAC SupersedingUFGS-01 45 02.10 (November 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated
8、 April 2010*SECTION 01 45 00.10 20QUALITY CONTROL FOR MINOR CONSTRUCTION02/10*NOTE: This guide specification covers the requirements for Quality Control for small construction projects and repair or maintenance work. It may also be used for minor elements or small quantities of work in larger projec
9、ts at the discretion of the Government.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whet
10、her or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the specification. A listing of Technical Proponents, including their organization designation and telephone number, is on the Internet.Recommended ch
11、anges to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph
12、 by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the SECTION 01 45 00.10 20 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license f
13、rom IHS-,-,-reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print p
14、rocess.*The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.U.S. ARMY CORPS OF ENGINEERS (USACE)EM 385-1-1 (2008) Safety and Health Requirements Manual1.2 SUBMITTALS*NOTE: Review subm
15、ittal description (SD) definitions in Section 01 33 00 SUBMITTAL PROCEDURES and edit the following list to reflect only the submittals required for the project. Submittals should be kept to the minimum required for adequate quality control.A “G” following a submittal item indicates that the submitta
16、l requires Government approval. Some submittals are already marked with a “G”. Only delete an existing “G” if the submittal item is not complex and can be reviewed through the Contractors Quality Control system. Only add a “G” if the submittal is sufficiently important or complex in context of the p
17、roject.For submittals requiring Government approval on Army projects, a code of up to three characters within the submittal tags may be used following the “G“ designation to indicate the approving authority. Codes for Army projects using the Resident Management System (RMS) are: “AE“ for Architect-E
18、ngineer; “DO“ for District Office (Engineering Division or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ typically are not used for Navy, Air Force, and NASA projects.Choose the first bracketed item fo
19、r Navy, Air Force and NASA projects, or choose the second bracketed item for Army projects.*Government approval is required for submittals with a “G“ designation; submittals not having a “G“ designation are for Contractor Quality Control approval.for information only. When used, a designation follow
20、ing the “G“ designation identifies the office that will review the submittal for SECTION 01 45 00.10 20 Page 4Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITT
21、AL PROCEDURES:SD-01 Preconstruction SubmittalsQC Plan; G, _Submit a QC plan within 15 calendar days after receipt of Notice of Award.1.3 INFORMATION FOR THE CONTRACTING OFFICER (KO) *NOTE: Weekly CQC Reports and Contractor Production Reports may be submitted on contracts and task orders under $750,0
22、00.*Prior to commencing work on construction, the Contractor can obtain a single copy set of the current report forms from the KO. The report forms will consist of the Contractor Production Report, Contractor Production Report (Continuation Sheet), Contractor Quality Control (CQC) Report, CQC Report
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYUFGS01450010202010QUALITYCONTROLFORMINORCONSTRUCTION 小型 施工 质量 控制 PDF

链接地址:http://www.mydoc123.com/p-984693.html