NAVY MIL-V-82440-1966 VALVE FUEL INTERLOCK《燃料互锁电子管》.pdf
《NAVY MIL-V-82440-1966 VALVE FUEL INTERLOCK《燃料互锁电子管》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-V-82440-1966 VALVE FUEL INTERLOCK《燃料互锁电子管》.pdf(22页珍藏版)》请在麦多课文档分享上搜索。
1、Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-V-8244.0 (OS) 3.3.2 Valve closure. With the pilot pressure removed the valve shall close. There shal
2、l be no leakage between the inlet and outlet ports. 3.3.3 Pilot cylinder leakage. The pilot cylinder shall not leak with a pressure of 4500 psig applied to the pilot port for a period of five minutes. 3.4 Environmental requirements. Un-less otherwise specified, the valve shall be capable of conformi
3、ng to the performance requirements and product characteristics of the specification after being exposed to the environmental conditions specified in this section. For definitions of .ready, operating, and non-operating see 6.3.1, 6.3.2, and 6.3.3. 3.4 .I The valve, mounted as shown in Figure 1, shal
4、l be capable of meeting the performance requirements after being subjected, in the ready condition, to the vibrations defined in Table I. The valve shall be vibrated for 180 minutes each in its longi- tudinal axis and in two mutually perpendicular transverse axes at any temperature within the range
5、of -45“ F to +140“ F. Vibration is defined in 6.3.4. Vibration, ready condition. TABLE I VIBRATION SCHEDULE I I Double Amplitude Acce lera t ion Frequency (CPS) (in. +_ 10%) Minimum (gs f 10%) Minimum - 3 .O lo - 5 - 22 22 - 40 40 - 74 74 - 500 I L 3.4.2 Figure 1, shall be capable of meeting the per
6、formance requirements after being subjected, in the ready condition, to the accelerations defined in Table II for a duration of lminute foreach magnitude. Acceleration is defined in 6.3.5. Acceleration, ready condition. The valve, mounted as shown in . -7 P 3 - Provided by IHSNot for ResaleNo reprod
7、uction or networking permitted without license from IHS-,-,-III. Shock is defined in 6,3.6. TABLE III SHOCK SCHEDULE Peak Direction of Number Test Magnitude Duration Impact Deceleration Of Sequence (gs f 10%) (ms) Axis Force Impacts 1 300 0.5 to 1.5 Longitudinal Aft 3 2 85 0.5 to 1.5 Transverse A Op
8、tional 3 3 85 0.5 to 1.5 Transverse B Optiotia 3 4 45 18.0 to 20.0 Longitudinal Fwd 3 5 60 8.0 to 10.0 Longitudinal Aft 3 6 60 8.0 to 10.0 Longitudinal Fwd 3 .7 60 8.0 to 10.0 Transverse A Optional 3 8 60 8.0 to 10.0 Transverse B Optional 3. 3.4.4. Temperature and humidity. 3.4.4.1 Non-operating. Pr
9、ovided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-V-82440 (OS) 3.4.4.2 Ready, operating. The valve immediately after being condi- tioned for 1 hour at any temperature between O“ F and +140“ F shall be capable of meetiig the performance requirements a
10、t any environmental temperature between O“ F and +140“ F. 3.5 Operational service life. The valve shall have a service life of 20 duty cycles. 3.6 Workmanship. The workmanship and finish shall be of sufficiently high grade to insure satisfactory operation consistent with the requirements of this spe
11、cification. The assembly shall be thoroughly clean and free of excess materials, chips, and loose or spattered foreign materials. production sample, subject to any qualification stated in the Govern- ments notice of approval, shall be determinative of the recpirements of the contract relative to wor
12、kmanship insofar as not specifically covered . by applicable specifications. The standards of workmanship exhibited in any approved. pre- . 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection. Uniess otherwise specified in the contract or purchase order, the supplier is responsible for
13、 the as otherwise specified, the supplier may utilize his own facilities or any comercial laboratory acceptable to the Govefnment. ment reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conf
14、orm to prescribed requirements. . . performance of all inspection requirements as specified herein. Except The Govern- 4.2 Classification of inspection. Inspection of the va1v.e shall be classified as follows: - a. Preproduction inspection (Subsection 4.4) . - b. Acceptance inspection (Subsection 4.
15、5) - c. Periodic inspection (Subsection k.6) . - d. Examination of first echelon repair parts (Subsection 4.7) 4.3 . Sampling. 3 4.3.1 Preproductin inspection sample. A preproduction sample of 6 valves manufactured in accordance with 3.2 shall be subjected to the preproduction tests listed in Table
16、IV and detailed in 4.4 through 4.4.4.10 at an activity designated by the procuring activity. preproduction sample shall be based on no defects in the-sample. Further production of the valve by the supplier, prior to approval of the Acceptance of the See 4.4.6. preproduction sample shall be at the su
17、ppliers- risk. 5 -* r -=+ ? - - - Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-V-2440 13 777770b 03bO48 I M 4.4.2 TABLE IV PREPRODUCTION TEST SEQ
18、UENCE Paragraph Test Sequence Tests Reference A B C Operational Test Vibration, Ready Condition Acceleration, Ready Condition . Shock, Ready Condition Operational Test Temperature and Humidity Low Temperature, Operating High Tempeyature , Operating Vibration, Packed and Packaged Shock, Packed and Pa
19、ckaged Operational Test Operational Service Life 4.4.4.1 1 4.4.4.2 2 4.4.4.3 4.4.4.4 4.4.4.1 3 4.4.4.5 4 4.4.4.6 5 4.4.4.7 4.4.4.8 4.4.4.9 4.4.4.1 . 4.4.4.10 6 1 1 2 3 4 5 6 2 3 4 Test conditions. Unless otherwise specified, the valve shall be subjected to the tests in 4.4.1 under the following cond
20、itions: - a. Temperature: i. . Altitude: - c. Vibration: - d. Humidity: Room ambient +32O F to +98“ F Normal ground atmospheric pressure None Room ambient 4.4.3 Test equipment and Set-up. In addition to the items listed in 4.5.3, test equipment is required which provides the following characteristic
21、s: . 4.4.3.1 Vibration equipment with temperature chamber. The vibration equipment with temperature chamber shall have the following characteristics: - a. Frequency range, logarithmic sweep: 5 to 500 cycles per - b. Test specimen: 3 pounds - c. second (cps) Acceleration and displacement (ready condi
22、tion): 5 to 22 cps 22 to 40 cps 40 to 74 cps 74 to 500 cps 0.2 inch 3.0 gravitational units (gs) 0.036 inch 10 gs Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-V-82440 13 m 977970b 0360849 3 m MIL-V-$2440 (OS) - d. I Acceleration (packed and pa
23、ckaged): 5 to 60 cps Ig - e. Automatic cycling time range: O to 5 minutes ,Jptional - f. Temperature chamber range: -45“ F to 4-140“ F accuracy to k 5OF g. Interior size: 2-1/2inches x 3-1/2. inches. x 5-1/2 inches minimum 4.4.3.2 Acceleration equipment. The acceleration equipment shall have the fol
24、lowing characteristics: 35 gs with a 1 pound test specimen. 4.4.3.3 Shock equipment. The shock equipment shall be capable of accepting a 1 pound test specimen and shall providranges of: - a. - b. - c. 300 gs for 0;5 millisecond (ms) to 1.5 ms 60 gs for 8.0 ms to 10.0 ms 45 gs for 18.0 ms$to 20.0 ms
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILV824401966VALVEFUELINTERLOCK 燃料 互锁 电子管 PDF

链接地址:http://www.mydoc123.com/p-983142.html