NAVY MIL-S-85354-1980 SWITCH INERTIA FUZE《引信惯性开关》.pdf
《NAVY MIL-S-85354-1980 SWITCH INERTIA FUZE《引信惯性开关》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-S-85354-1980 SWITCH INERTIA FUZE《引信惯性开关》.pdf(14页珍藏版)》请在麦多课文档分享上搜索。
1、- MIL-S-5354 13 W 777770b 03611551 7 W I MIL-S-85354(,AS) e 14 Novem ber 1 980 MILITARY SPECIFICATION SWITCH, INERTIA, FUZE This specification is approved for use by the Naval Air Systems Command, Department of the Navy, and is available for use by all Departments and Agencies of the Department of D
2、efense, 1. SCOPE. 1.1 SCO e. This specification establishes the requirements for manu- facture -% an acceptance of the Fuze Inertia Switch, referred to herein as the switch, 2. APPLICABLE DOCUMENTS. 2.1 Issues of documents. The following documents of the issue in effect on date of invitation for bid
3、s or request for proposal form a part of this specification to the extent specified herein. SPECIFICATIONS 0 MILITARY MIL-C-45662 Calibration System Requirements. STANDARDS FEDERAL FED- STD-102 Preservation, Packaging I and Packing Levels. Beneficial comments (recommendations, additions, deletions)
4、and any pertinent data which may be of use in improving this document should be addressed to: Commanding Officer, Naval Air Engineering Center, Engineering Specifications and Standards Department (ESSD) , Code 93, Lakehurst , N J 08733, by using the self-addressed Standardization Document Improvemen
5、t Proposal (DD Form 1426) appearing at the end of this document or by letter. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-I_ - MIL-S-45354 13 W 7779706 0364552 O E MIL-S-85354( AS) MILITARY MIL-STD-105 MIL- STD - 129 MIL- STD-202 MIL-STD-810 Envi
6、ronmental Test Methods. MIL-STD-1246 . Product Cleanliness Levels and Contamination Control Program. MIL - STD - 1695 Environments, Working, Minimum Standards for. Sampling Procedures and Tables for Marking for Shipment and Storage. Test Methods for Electronic and Electrical Component Parts. : Inspe
7、ction by Attributes. DRAWINGS Naval Air Systems Command. (Code Ident 30003) DL 1186AS221 . Switch, Inertia, Fuze. Naval Sea Systems Comma (Code Ident 53711) LD 533577 LM 2186956 LM 2203492 DL 2205011 Test Set, Vibration. DL 2238186 Test Set, Inertia. Impact Test Fixture for Fuze Triggering Devices.
8、Fixture, vibration, for Fuze Trigger- ing Devices. Fixture, Vibration, for Fuze Trigger- fng Devices. (Copies of specifications, standards, publications, and drawings required by contractors in connection wi, be obtained from the procurrlG.g officer. ) fied procurement functions should or as directe
9、d by the contracting 2 I Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-S-85354 13 I 7777406 03h1.1553 2 I 2.2 Other publications. The following document forms a part of this specification to the extent specified herein. Unless otherwise indicat
10、ed , the issue in effect on date of invitation for bids or request for proposal shall apply. CODE OF FEDERAL REGULATIONS (CFR) 49 CFR 171-178 Transportation, (Application for copies should be addressed to the Superintendent of Documents , Government Printing Office , Washington , D. C. 20402. ) 3. R
11、EQUIREMENTS. NOTE : Drawings and associated documents (such as DLs, LMs, and LDs) referenced herein which are not listed in Section 2 are delineated on the DLs, LMs or LDs cited in Section 2, 3.1 Item description. The switch contains two vibration-dampened con- tacts which are designed to momentaril
12、y close at impact. The contacts are located within a housing that also serves as a portion of the switching common, or ground circuit. The switch must be specifically oriented with respect to the longitudinal centerline and direction of travel of the fuze or missile in which it is mounted. Upon impa
13、ct of the missile, a circuit for delivery of a firing pulse to initiate the explosive-train of the missile warhead is completed through closure of either one or both contacts of the switch. 3.2 Characteristics. 3.2.1 Performance. The performance characteristics of the switch shall be as specified he
14、rein when fabricated in accordance with the drawings and documents listed on DL 1186AS221. 3.2.1.1 Insulation resistance. The insulation resistance between the switch housing (Drawing 1186AS222) and both leads shorted together shall be 25 megohms (Mohms) minimum. 3.2.1.2 Impact. 3.2.1.2. I Impact ,
15、65-degree position. Neither contact of the switch shall close when subjected to a 65-degree impact in accordance with Figure 1. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL- S-85354(AS) , . 3.2.1.2.2 Impact , 95-degree position. Both contact
16、s of the switch shall close when subjected io E! %-degree impact in accordance with Figure 1. 3.2.1.3 Acceleration. 3.2.1.3.1 Acceleration, 350 gravity units (9). Neither contact of the switch shall close at an acceleration of 350 +5, -0 g. 3.2.1.3.2 Acceleration, 450 9. at an acceleration of 450 +O
17、, -5 g. Both contacts of the switch shall close 3.2.2 Environmental conditions. The switch shall not be damaged nor shall performance be degraded by exposure to the following environments. 3.2.2.1 Sinusoidal vibration, Neither contact of the switch shall close during &le (see 6.3.1) following exposu
18、re to the env during and the switch shall to the environment of 4.4.4.2. 3.2.2.3 Thermal shock. lowing exposure to the environment of 4.4.4.3. 3.2.2.2 Random vibration. Neither contact of the switch shall close mahle (see 6.3.1) following exposure The switch shall be operable (see 6.3.1) fol- 3.2.3
19、Visual. There shalPhk no evidence of external damage, such as cracks, deFor other blemishs, which may interfere with functioning or fit of the switch at the next assembly. 3.3 First article (preproduction sample). Unless otherwise specified in the contract or purchase ordef, the contractor shall fur
20、nish a preproduc- tion sample of 50 switches to Qi testing activity designated in the contract or purchase order for first artide inspection and approval (see 4.1.2.1 and 6.2.1). The preproduction sample shall be manufactured using the same methods, materials , processes , and procedures proposed fo
21、r production. Any production prior to acceptance of the preproduction sample shall be at the risk of the contractor. 3.4 Construction. The construction of the switch shall meet the re- quirements specified herein and on the drawings and documents listed on DL 1186AS221. 3.4.1 Production drawings. Th
22、e switch shall meet the requirements of and be manufactured and assepbled in accordance with the drawings and documents listed on DL 138$%3221. 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-S-5354 13 = 777770b 0364555 b W .- 3.4.2 Test equipm
23、ent calibration plan. , When specified in the contract or mrchase order. test euuii3ment shall be calibrated and maintained in accrdance with a -plan metig the. requirements of MIL-(2-45662. The calibration plan shall be prepared in accordance with the data item description (DID) cited in 6.2.2 and
24、shall be approved by the Govern- ment prior to use. 3.4.3 Test plan and test procedures. When specified in the contract or purchase order, the contractor shall prepare a test plan and test pro- cedures in accordance with the DID cited in 6.2.2. test procedures shall be approved by the Government pri
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILS853541980SWITCHINERTIAFUZE 引信 惯性 开关 PDF

链接地址:http://www.mydoc123.com/p-981795.html