NAVY MIL-R-85320-1980 RACK BOMB EJECTOR AIRCRAFT BRU-20 BRU-21 BRU-22 BRU-24 AND BRU-25 SERIES《BRU-20 BRU-21 BRU-22 BRU-24 及 BRU-25系列飞机喷射器及炸弹的机架》.pdf
《NAVY MIL-R-85320-1980 RACK BOMB EJECTOR AIRCRAFT BRU-20 BRU-21 BRU-22 BRU-24 AND BRU-25 SERIES《BRU-20 BRU-21 BRU-22 BRU-24 及 BRU-25系列飞机喷射器及炸弹的机架》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-R-85320-1980 RACK BOMB EJECTOR AIRCRAFT BRU-20 BRU-21 BRU-22 BRU-24 AND BRU-25 SERIES《BRU-20 BRU-21 BRU-22 BRU-24 及 BRU-25系列飞机喷射器及炸弹的机架》.pdf(19页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-R-85320(AS) 25 April 1980 MILITARY SPECIFICATION RACK, BOMB EJECTOR, AIRCWT; BRU-20, BRU-21, BRU-22, BRU-23, BRU-24 AND BRU-25 SERIES This specification is approved for use by the Naval Air Systems Command, Department of the Navy, and is available for use by all Departments and Agencies of the D
2、epartment of Defense. 1. SCOPE 1.1 Scope. This specification establishes the requirements for the manufacture and inspection of two types of bomb ejector racks capable of carrying and releasing stores having suspension lugs spaced 355.6 millimeters (14 inches) apart and weighing from 45 kilograms (1
3、00 pounds) to 660 kilograms (1,450 pounds). The test limits in this speci- fication define minimum acceptable capabilities. 1.2 Classification. Bomb ejector racks, hereinafter called ejector units, covered by this specification shall be of the following types : Type I BRU-20, BRU-21, BRU-22, BRU-23
4、Bomb Ejector Racks Type TI BRU-24, BRU-25 Bomb Ejector Racks 2. APPLICABLE DOCUMENTS 2.1 Issues of documents. The following documents, of the issue in effect on date of invitation for bids or request for prcsposal, form a part of this specification to the extent specified herein. Beneficial comments
5、 (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document should be addressed to: Engineering Specifications and Standards Department (Code 93) Naval Air Engineering Center, Lakehurst, N.J. 08733, by using the self-addressed Standardizatiop Docume
6、nt Improve- ment Proposal (DD Form 1426) appearing at the end of this document or by letter. FSC 1095 VHS DOCUMENT CONTAINS WWS. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Inspection, Penetrant Method of -Testing, Store Suspension and Release Eq
7、uipment; General Specification for -Connector Assemblies for Bomb Rack Electric Fuzing Provisions Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-R-5320 10 W 9999906 03b4394 I - 2.2 Order of precedance of specifications and standards. Should a co
8、nflict exist between any requirement in this specification and any requirement in the applicable documents referenced herein, the requirements of this specification shall take precedence over the ref- erenced (applicable) document. 3. REQUIREMENTS 3.1 First article. The ejector units furnished under
9、 this specification shall be a product which has been inspected and passed the first article inspection specified herein see 4.3). 3.2 Selection of specifications and standards. Specifications and standards for necessary commodities and- services not specified herein shall be selected in accordance
10、with MIL-STD-143. 3.3 Interchangeability. All parts having the same part number shall be directly and completely interchangeable with each other with respect to installation ana performance. 3 4 Identification of parts. All parts shall be specified on the drawings listed in the data list-For the eje
11、ctor unit being procured, or in accordance with MIL-STD-130, if not specified on the drawings. The item identification and part number requirements of MIL-STD-100 shall govern the part number and changes thereto. 3.5 Ejector unit. 3.5.1 . Construction. The construction of the ejector unit shall be i
12、n accordance with the drawings listed in the data list for the ejector unit being procured and as specified herein (see 6.2.lf). 3.5.2 Performance. The ejector units shall satisfy all perform- ance requirements when subjected to the following inspections in the order specified in Tables 1 and II, 4.
13、6.8b) a. b. Functional Test (see 4.6.4) c. Arming Mechanism (see 4.6.5) d. e, Electrical Characteristics (see 4.6.8a) f. L,*g Time or Time of Release Determination (see Ejector Unit inspection (see 4.6.3) Electric Fuze Arming (see 4.6.6) 3 Provided by IHSNot for ResaleNo reproduction or networking p
14、ermitted without license from IHS-,-,-_-_- MIL-R-85320 LO W 9777706 03bLi375 T W g- h. i. j. k. 1. m. n. Icing (see 4.6.8) Sand (see 4.6.8d) Life (see 4.6.7) Salt Spray (see 4.6.8e) Shock (see 4.6.8f) Vibration (see 4.6.8g) Static (see 4.6.8b) Lock Shut Ffring (see 4.6.8) 3.6 Electric fuze arming un
15、it. The construction and nspec- tion of the electric fuze arming unit shcall be in accordance with MIL-C- 81842. 3.7 Workmanship. The worhansip displayed in fabrication and assembly of the ejector units shall be such as to assure, within design limitations, the ability of the ejector units to meet t
16、heir performance requirements under all applicable environmental conditions specified herein. Unauthorized repair, we1ding;heavy burrs, or parts assembled by introduction of high stresses not prescribed in the drawings, are typical signs of inferior workmanship and shall be eause for rejection. The
17、standards o workmanship exhibited in the approved first article sample , subject to any qualification stated in the governments notice o approval, , shall be determinative of the reeuirements of the contract relative to 4. QUALITY ASSURANCE PROVISIONS m 4.1 Responsibility for inspection. Unless othe
18、rwise speci- fied in the contract, the contractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract, the contractor may use his own or any other facilities suitable for the nerformance of the insnection reauirements ,
19、 specified herein, unless disapproved by the goverment. The government . m reserves the right to perform any of the inspections set forth in the specification. where such insDections are deemed necessarv to assure that the supplies and services conform to vrescribed reauirements. m 4.2 Classificatio
20、n of inismxtion. The inspection of the Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-b . Quality conformance inspection (see 4.4) 4.3 F-. First article inspection shall consist of all of the inspections listed in Table I. First article inspection r
21、eport format shall be in accordance with MIL-STD-831 (see 6.3). 4.3,1 Sampling for the first article inspection. First article ejector unit samples shall consist. E the first two ejector units manu- factured on contract. The ejector units shall be permanently labeled A and B for ease of identificati
22、on. Failure of the ejector units to pass any of the first article inspections shall be cause for rejection (see 6.3). 4.4 Quality conformance inspection. Quality conformance inspection shall consist of t-pections: a. Individual inspections (see 4.4.1) b . Sampling Inspections (see 4.4.2) Quality con
23、formance inspection report format shall be in accordance with . MIL-STD-831 (see 6.3). 4.4.1 Individual inspections. Individual inspections are those inspections conducted on each ejector unit. Individual inspections for the ejector units are shown in Table II, Group I. Failure to pass any of these
24、inspections shall be cause for rejection of the ejector unit. 4.4.2 Sampling inspections. A random sampling of the ejector units shall be selected by the procuring activity from each production lot in accordance with Table III and shall be subjected to the inspec- tans listed in Table II, Group 1 an
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILR853201980RACKBOMBEJECTORAIRCRAFTBRU20BRU21BRU22BRU24ANDBRU25SERIESBRU20BRU21BRU22BRU24 BRU25

链接地址:http://www.mydoc123.com/p-981433.html