NAVY MIL-R-22618-1960 RELEASE BOMB SHACKLE AERO 7A SERIES AND RELEASE BOMB RACK AERO 7B SERIES《7A航空系列炸弹钩及航空7B系列炸弹机架的解锁》.pdf
《NAVY MIL-R-22618-1960 RELEASE BOMB SHACKLE AERO 7A SERIES AND RELEASE BOMB RACK AERO 7B SERIES《7A航空系列炸弹钩及航空7B系列炸弹机架的解锁》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-R-22618-1960 RELEASE BOMB SHACKLE AERO 7A SERIES AND RELEASE BOMB RACK AERO 7B SERIES《7A航空系列炸弹钩及航空7B系列炸弹机架的解锁》.pdf(12页珍藏版)》请在麦多课文档分享上搜索。
1、 MIL-R-22618 LO m 7977706 0302582 7 m 5-34-03- - M I L-R-2 2 6 I 8 (WE P) 15 SEPTEMBER I960 MILITARY SPECIFICATION Release, Bomb Shackle, Aero 7A, Ser,.% Release, Bomb Rack Aero 7B Series and This specification has been approved by the Bureau of Naval Weapons, Department of the Navy. 1. SCOPE 1.1 Th
2、is specification covers the manufacture,- inspection and testing of two types of electrically-operated release mechanisms for use with a bomb shackle and bomb racks of the type specified by the procuring activity. Bomb Rack Release shall be of two types and shall consist of the following items: 1.2
3、Classification - The Aero 7A Series Bomb Shackle Releas and Aero 7B Series Max. Allow. Max. Allow. - Item Designation Size (Inches) Wt. (Lbs.) Release, Bomb Shackle Aero 7A Series 4-31/32 by 1-13/16 by 3-11/32 2 Release, Bomb Rack Aero 7B Series 4-7/32 by 1-5/8 by 2-1/2 2 2. APPLICABLE DOCUMENTS 2.1
4、 General - The following documents of the issue in effect on the date of invitation for bids, formaof this specification to the extent specified herein: S PE CIFICA TIONS Military MIL-T-7743 Testing, Store Suspension Equipment, General Specifica- tion For MIL-P-17555 Preparation For Delivery of Elec
5、tronic Equipment; Miscellaneous Electrical Equipment (Except Rotating Electrical Equipment) And Associated Repair Parts Nomenclature and Nameplates For Aeronautical Electronic And Associated Equipment MIL-N- 18307 MIL-D-70327 Drawings, Engineering And Associated Lists SAR-300 Material Changes And Ma
6、terial Bulletins, Preparation of THIS DOCUMENT CONTAINS 12 PAGES. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-R-22bL LO 777770b 0302583 7 MIL-R- 22618(WEP) STANDARDS Federal FED-STD-NO. 151 Metals, Test Methods Military MIL-STD-704 Electric P
7、ower, Aircraft, Characteristics And Utilization of PUBLICATIONS Air Force-Navy Aeronautical Bulletin No. 143 Specifications and Standards, Use of DRAWINGS Bureau of Naval Weanons Drawing Index 60A55 Aero 7A Bomb Shackle Release Drawing Index 60A121 Aero 7A-1 Bomb Shackle Release 2.2 Drawing Index 60
8、A56 Drawing Index 60A122 Availability of Documents - (1) When requesting specifications, standards, drawings, and publications refer to both title and number. Copies of this specification and applicable specifications required by contractors in connection with specific procurement functions may be o
9、btained upon application to the Commanding Officer, Naval Supply Depot, Code CDS, 5801 Tabor Avenue, Philadelphia 20, Pennsylvania. Aero 7B Bomb Rack Release Aero 7B-1 Bomb Rack Release 3. REQUIREMENTS 3.1 Parts and materials used in the manufacture of the Release shall conform to the ap- plicable s
10、pecifications as specified herein or as listed on the applicable drawings. Material con- forming to contractors specifications may be used provided the specifications are approved by the procuring activity, are equivalent to the Government specifications and contain requirements for adequate tests o
11、f the material. The use of contractors specifications shall not constitute a waiver of Government inspection. All materials shaii be of the lightest practical weight and en- tirely suitable for the intended purpose. When materials are used which are procured under com- merciaily recognized non-Gover
12、nment specifications, a certificate, acceptable to the Government Inspector, showing compliance with such specifications, shail be furnished by the supplier of such material. 3.1.1 Selection of Materials - Specifications and standards of ail materiais and parts, and Government certification and appr
13、oval of processes and equipment, which are not specificaily designated herein and which are necessary for the execution of this specification, shail be selected in accordance with ANA Bulletin No. 143. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-
14、MIL-R-22bL LO = 777770b 03025i.1 O -, MIL-R-22618(WEP) 3.1.2 Weight Reduction - The contractor shall make every effort to reduce the equip- ments over-all weight without impairing the function, operation or durability. All changes that are required to accomplish weight reduction shall be subject to
15、written approval by the procuring activity prior to incorporation. 3.2 Design and Construction - 3.2.1 Conformance to Drawings - No departure from or revision to the drawings speci- fied in 2.1 shall be permitted without prior written approval by the procuring activity, with the contractor furnishin
16、g reproducible drawings covering the change. Conformance to the drawings will not relieve the contractor of the requirements of section 4. 3.2.2 input Power Requirements - This equipment shall perform satisfactorily under all applicable conditions specified in Specification MIL-T-7743, from a 28-vol
17、t power source with characteristics and limits as defined in Specification MILSTD-704. 3.2.3 Interchangeability - All parts having the same manufacturers part number shall be directly and completely interchangeable with each other with respect to installation and per- formance. Changes in manufactur
18、ers part numbers shall be governed by the drawing number re- quirements of Specification MIL-D- 70327. 3.2.4 Nomenclature and Nameplates - Nomenclature assignment and nameplate approval for equipment identification shall be in accordance with Specification MIL-N-18307. 3.2.5 Undervoltage Protection
19、- The equipment shall not be damaged by voltages below the minimum specified herein and shail automatically resume normal operation when the volta.ge returns within limits. 3.2.6 Service Conditions - The Releases shall operate without failure throughout the en- tire environmental ranges listed below
20、: Thrust Force: Min. 55 pounds after 1/16 inch travel to 18 pounds minimum Length of Stroke: Aero 7A Series 1-1/2 inches Aero 7B Series 9/16 inch Time of Actuating Pulse: Min. 20 milliseconds Max. 15 seconds, 20% duty cycle Input .Power Current: 5 amperes maximum at 28 V DC input Power Voltage: 20 t
21、o 32 V DC Temperature: -70“ F to 160“ F Vibration: 8 to 2000 cycles/sec. Altitude: O to 70,000 Ft. Humidity: Room ambient to 90% relative humidity Shock 125 f 12-1/2 gravitational units I- far a duration of 10 milliseconds, waveform Performance - Unless otherwise specified, values set forth to estab
22、lish the require- ments for satisfactory performance apply to performance under both standard and extreme service conditions. The Release and its appropriate mount shail be capable of operating, without periodic lubrication, a bomb shackle of the Mark 8 or Aero 16B type safely and successfully when
23、tested to the conditions specified in Section 4. to approximate a sinusoid. 3.3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-R-22bL8 LO m 777770b 0302585 2 m MIL-R-22618WEP) 4. QUALITY ASSURANCE PROVISIONS 4.1 General - Equipments shall be sub
24、jected to the following tests to determine compli- (1) Preproduction Tests - (4.2). (2) Acceptance Tests - (4.3). Test Samples - The equipments used for preproduction and sampling tests shall not be considered as equipments under the contract. They are to be supplied as equipments over and above the
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILR226181960RELEASEBOMBSHACKLEAERO7ASERIESANDRELEASEBOMBRACKAERO7BSERIES7A 航空 系列 炸弹 机架 解锁 PDF

链接地址:http://www.mydoc123.com/p-981136.html