NAVY MIL-I-23775-1963 INERT LOAD BINDER FOR DRILL MINES《用于地雷的拉紧器插件》.pdf
《NAVY MIL-I-23775-1963 INERT LOAD BINDER FOR DRILL MINES《用于地雷的拉紧器插件》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-I-23775-1963 INERT LOAD BINDER FOR DRILL MINES《用于地雷的拉紧器插件》.pdf(10页珍藏版)》请在麦多课文档分享上搜索。
1、MI L-I -2 37 7 5( w cp) 25 June 1963 . SUPERSEDING NAVOKD OS 816OA 3 January 1963 MI LIT MY SPECIFICATION INERT LOAD BINDER FOR DRILL MINES This specification has been approved by the Bureau . of Naval Wcapons, Department of the Navy 1. SCOPE 1.1 This specification est blishes the requir rnents for
2、the procurement of Inert Load Binder for Drill Mines uses in applications wherein low magnetic permeability charac- terist ics are required, for 1.2 wwt ion - The Inert Load Binder for Drill Mines shall be of the following types: Type I. Type IA, - Air-entraining binder for same - . For use in gener
3、al binding uses as Type I, 2. APPLICABLE DCUMENS 2.1 The following specifications standards, drawings and publications of the issue in effect on t ion uwg for acceptance OP individual lots shall be performed by the contractor. Contractors not having laborator facilities commercial testing laboratory
4、 acceptable to the procuring activity. Dctail records of all contractor performed exam- ination and tests shall be made available to the Government represent at ive . satisfactory to the Government shall engage t i: e services of a Provided by IHSNot for ResaleNo reproduction or networking permitted
5、 without license from IHS-,-,-4.1.1 Sampling. - - Unless otherwise specified, and when appli- cable, the sampling plans and procedures used in the determination of the acceptability of- products suhitte6 by 8 supplier for Government inspect ion shall be in accordance with the provisions set -forth i
6、n XIL-STO-105 4.1.2 Lot size. - As applied to Government inspection of units of product the term “1s shall mean “inspection lot“, and shall consist of one batch offered for delivery at one time. 4,2 Lot acceptance tests. - The sample nclected in accord- ance with 4 .I 1 shall be subjected to the tes
7、ts speciAred in 4.5. When samples are submitted to represent more than one lot. under a contract or order, the laboratory may elect to perform cornplfite tests on one sample and only selective tests on other samples submitted to specify that all. material is alike. 4,3 Rcjecfed lots, - Rejected lots
8、 may be resubmitted for inspection and acceptance tests provided the contractor has removed (or reworked) all nonconforming products. 4*4 Test equipment. - The following items of test equipment are required to perform the acceptance tests set forth in this specification: 4,4.1 Standard commercial te
9、sting equipment for obtaining chemical analysis and physical characteristics of the binder material. Test Set Mark 115 Mod 4 Government Furnished Equipment 4,4,2 The Government shall furnish Test Set Mark 115 Mod 4; the Contractor shall furnish personnel, facilities and other equipment to accomplish
10、 the acceptance tests I 4.5 Acceptance tests. 4.51 Chemical analysis - Federal Test Method Standard No 158, Cements, Hydraulic; Sampling, Inspection, and Testing shall be used or obtaining chemical analysis, Referee methods shall be used in wse of dispute, or when the results obtained by optional me
11、thods indi- cate a result so close to the specification limit that meeting or failing %Q meet the specification requirement is in doubt. When referee I=. - . -. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-1-23775 56 7777706 0234335 2 - method
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILI237751963INERTLOADBINDERFORDRILLMINES 用于 地雷 拉紧 插件 PDF

链接地址:http://www.mydoc123.com/p-979809.html