NAVY MIL-F-85400-1980 FUZE GUIDED MISSILE DUMMY FMU-138(D-1) B《道具FMU-138(D-1) B制导导弹引信》.pdf
《NAVY MIL-F-85400-1980 FUZE GUIDED MISSILE DUMMY FMU-138(D-1) B《道具FMU-138(D-1) B制导导弹引信》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-F-85400-1980 FUZE GUIDED MISSILE DUMMY FMU-138(D-1) B《道具FMU-138(D-1) B制导导弹引信》.pdf(25页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-F-85400 13 7779706 03b11787 7 a MIL-F-85400(AS 14 November 1 80 MILITARY SPECIFICATION FUZE, GUIDED MISSILE, DUMMY This specification is approved for use by the Naval Air Systems Command, Department of the Navy, and is available for use by all Departments and Agencies of the Department of Defens
2、e. 1. SCOPE. 1.1 SCO e. This specification establishes the requirements for manu- facture -% an acceptance of the FM-138(D-l)/B Dummy Guided Missile Fuze, referred to herein as the dummy fuze. 2. APPLICABLE DOCUMENTS. e- 2.1 Issues of documents. The following documents of the issue in effect on date
3、 of invitation for bids or request for proposal form a part of this specification to the extent specified herein. SPECIFICATIONS FEDERAL TT-I- 735 Isopropyl Alcohol. MILITARY MIL-S-6872 Soldering Process, General Specification for. Beneficial comments (recommendations , additions , deletions) and an
4、y pertinent data which may be of use in improving this docu- ment should be addressed to: Commanding Officer, Naval Air Engineering Center, Engineering Specifications and Standards Department (ESSD), Code 93, Lakehurst, NJ 08733, by using the self-addressed Standardization Document Improvement Pro-
5、posal (DD Form 1426) appearing at the end of this document, or by letter. ctpP,! DQjkt;Li(f( - i Cee Figure 2) -IP FIP see Figure 2) L?Clip must be attached to case for these tests. Z?Lower limit will show capacitor (Ci) charging. S?Calibration readings are taken at calibration socket. 2?Net values
6、are the normal readings minus the calibration readings. Upper limit (approximately 7 Megohms (hlohms) may be exceeded , depending on charging time. 6 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- Test mode 3469 Ohmmeter reading 100 kohms 100 kohms
7、 lkohm 1 kohm Al A2 A3 (Cai)- i/ A3 2/ (Net)- Resistance Switch Configuration B C limit limit limit limit positions c+ c- Lower Upper Lower Upper 10 5 35 kohms 45 kohmc 20 kohms 60 kohms 5 10 Open Open Open Open 8 12 500ohms 700ohms 500ohms 700ohms 12 8 500 ohms 700 ohms 500 ohms 700 ohms MIL-F-5400
8、 13 = 97999Ob 03b11795 11 = TABLE III. Resistance (armed condition) requirements for configuration A. Ohmmeter scale reading 100 kohms 100 kohms 1 ohm 1 ohm - Switch positions c+ 10 5 7 7 - C- 5 10 3 3 - Res is tance Lower limit 35 kohms Open - - O ohm Upper limit 45 kohms Open - - 0.45 ohm Items ch
9、ecked (see Figure 2) CR5, . S1D CR5 - - S1E -Calibration readings are taken at calibration socket. ?Net values are the normal readings minus the calibration readings. TABLE IV. Resistance (armed position) requirements for configurations B .and C. Test mode 3469 Al A2 A3 A4 A5 if less than 1 Vdc, the
10、 firing capacitor is discharged. 4.4.1 Electrical. The tests of 4.4.1.1 and 4.4.1.2 shall be performed on dummy fuzes during and after assembly as specified on the applicable figures. Resistance measurements shall be performed using the test set (see 3.1.2 and 3.2.1.1), or standard test equipment th
11、at meets the requirements of 4.3.1. The test results shall be recorded on the inspec- tion record (see Figure 4). 13 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-F-85400(AS) 4.4.1 1 Resistance (safe position). To determine conformance to 3.2.1
12、.1.1, verify the resistance requirements of Table II with the dummy fuze in the safe position (see 6.3.1). The high pot (HP) tests shall be performed at 500 Vdc 210 percent. limits specified in the table. The resistance shall be within the 4.4.1.2 Resistance (armed position). To determine conformanc
13、e to 3.2.1.1.2, verify the resistance requirements of Tables III and IV with the dummy fuzein the armed positin (see 6.3.2). The tests for config- uration C (see Table I) of Table IV shall be performed during the envi- ronmental inspection sequences below the dashed lines of Figures 6 and 7. The res
14、istance shall be within the limits specified in the tables. 4.4.2 Mechanical operability. To determine conformance to 3.2.1.2, verify the mechanical operability requirements of Table V using the test set (see 3.1.2 and 3.2.1.1), or standard fest equipment with a two- channel (minimum) recorder and a
15、n acoustic pickup which meets the requirements of 4.3.1. Timing shall be determined from the output record chart as shown on Figure 3. Record the test results on the inspection record (see Figure 4). NOTE: An acoustic pickup shall be used as an audio aid to verify dummy fuze armkiig and resetting (s
16、ee 4.3.5). 4.4.3 Seal. To determine conformance to 3.2.1.3, test the dummy 1 fuze in aEEZrdance with MIL-STD-202, Method 112, Test Condition Cl Procedure IV. Trichlorotrifluoroethane (MIL-T-14757) , or isopropyl alco- hol (TT-1-735, grade optional) may be used as alternative immersion fluids for gro
17、ss-leak testing. At the contractors facility, the dummy fuze shall be tested within 4 hours after pressurizing and sealing and the test re- sults shall be recorded on the inspection record (see Figure 4). 4.4.4 Environmental. All dummy fuzes of the preproduction sample, or a randomly selected sample
18、 of 15 fuzes from an inspection lot shall be subjected to the following environmental tests in accordance with Figure 6 or 7, as applicable, at an independent test facility designated in the contract or purchase order (see 6.2.1). All dummy fuzes sub- jected to these tests shall be considered destro
19、yed and shall not be returned to the lot nor forwarded for service use, but shall be labeled appropriately and disposed of at the discretion of the contracting officer. 4.4.4.1 Transportation vibration-temperature . To determine conform- ance to 3.2.2.1, mount the dummy fuze to the vibration fixture
20、 (Draw- ing SA 498019). Test the dummy fuze in accordance with MIL-STD-331, Test 119, Procedure 2. NOTE: For the vibration and shock tests specified herein, the test fixtures shall be mounted to a vibration table or shock ma- chine and the mounting bolts shall be tightened to a torque of 25 il foot-
21、pounds. 14 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-F-85400 13 999790b O364803 T 9 I MIL- F-85400 (AS) 4.4.4.2 Shock. To determine conformance to 3.2.2.2, mount the dummy fuze to the- fixture (Drawing SA 2876062; alternate, vibration fixt
22、ure of Drawing SA 498016). Test the dummy fuze in accordance with MIL- STD-202, Method 213, Test Condition J, except the amplitude shall be 15 +-1 g. 4.4.4.3 Temperature and humidity. To determine conformance to 3.2.2.3, test the dummy fuze in accordance with MIL-STD-331, Test 105, either method. Th
23、e connector shall be thoroughly cleaned and dried after the test. 4 4.4.4 Captive flight vibration (safe position). To determine con- formance to 3.2.2.4, mount the dummy fuze to the. vibration fixture (Drawing SA 498016). Test the dm? fuze in accordance with MILL STD-820, Method 514, Procedure V, P
24、art 2, Curve AE, except apply random vibration for 2 hours minimum along each of the three mutually perpendicular axes for a total of 6 hours, 4.4.4.5 Missile flight vibration (armed position) . To determine con- formance to 3.2.2.5, mount the dummy fuze to the vibration fixture (Drawing SA 498016)
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILF854001980FUZEGUIDEDMISSILEDUMMYFMU138D1B 道具 FMU138D1B 制导 导弹 引信 PDF

链接地址:http://www.mydoc123.com/p-979237.html