NAVY MIL-DTL-60525 B-2012 INITIATOR CARTRIDGE ACTUATED M99 METAL PARTS ASSEMBLY《M99金属零件组件弹药驱动引爆器》.pdf
《NAVY MIL-DTL-60525 B-2012 INITIATOR CARTRIDGE ACTUATED M99 METAL PARTS ASSEMBLY《M99金属零件组件弹药驱动引爆器》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-DTL-60525 B-2012 INITIATOR CARTRIDGE ACTUATED M99 METAL PARTS ASSEMBLY《M99金属零件组件弹药驱动引爆器》.pdf(17页珍藏版)》请在麦多课文档分享上搜索。
1、INCH-POUNDMIL-DTL-60525B 6 January 2012 SUPERSEDING MIL-I-60525A 30 March 1990 DETAIL SPECIFICATION INITIATOR, CARTRIDGE ACTUATED, M99 METAL PARTS ASSEMBLY This specification is approved for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification cove
2、rs the requirements for the M99 Cartridge Actuated Initiator Metal Parts Assembly (see 6.1). 2. APPLICABLE DOCUMENTS 2.1 General. The documents listed in this section are specified in sections 3, 4, or 5 of this specification. This section does not include documents cited in other sections of this s
3、pecification or recommended for additional information or as examples. While every effort has been made to ensure the completeness of this list, document users are cautioned that they must meet all specified requirements of documents cited in sections 3, 4, or 5 of this specification, whether or not
4、 they are listed. 2.2 Government documents. 2.2.1 Specifications, standards, and handbooks. The following specifications, standards, and handbooks form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are those cited in the solicitatio
5、n or contract. DEPARTMENT OF DEFENSE SPECIFICATIONS MIL-A-2550 Ammunition, General Specification For (Copies of these documents are available online at https:/assist.daps.dla.mil/ or from the Standardization Documents Order Desk, Building 4D, 700 Robbins Avenue, Philadelphia PA 19111- 5094.) Comment
6、s, suggestions, or questions on this document should be addressed to DEPARTMENT OF THE NAVY, Indian Head Division, NSWC, Code E12AP, Document Control, 4123 Artisans Court, Suite 103, Indian Head, Maryland 20640-5085, OFFICIAL BUSINESS, or emailed to amanda.pennnavy.mil. Since contact information can
7、 change, you may want to verify the currency of this information using the ASSIST Online database at https:/assist.daps.dla.mil. AMSC N/A FSC 1377 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Provided by IHSNot for ResaleNo reproduction or networking permitted wi
8、thout license from IHS-,-,-MIL-DTL-60525B 2 2.2.2 Other Government documents, drawings, and publications. The following other Government documents, drawings, and publications form a part of this document to the extent specified herein. Unless otherwise specified, the issues are those cited in the so
9、licitation or contract. DRAWINGS NAVAL ORDNANCE STATION, INDIAN HEAD, MD (CAGE Code 19200 and 19203) 10520406 Initiator, Cartridge Actuated, M99, Metal Parts Assembly 8830984 Box, Fiberboard (Inner) Packing, Ammunition for Initiator, Cartridge Actuated M27, M86, M87, M98, M99, or XM107 8830985 Box,
10、Packing, Ammunition for Initiator, Cartridge Actuated M27, M86, M87, M98, M99, or XM107 9241155 Box, Fiberboard (Outer) Alternative, Packing Ammunition, for Initiator, Cartridge Actuated M27, M86, M87, M98, M99, or XM107 (Application for copies should be addressed to DEPARTMENT OF THE NAVY, Indian H
11、ead Division, NSWC, Code E12P, Document Control, 4123 Artisans Court, Suite 103, Indian Head, Maryland 20640-5085, OFFICIAL BUSINESS.) 2.3 Non-Government publications. The following documents form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these
12、 documents are those cited in the solicitation or contract. American National Standards Institute (ANSI)/American Society For Quality (ASQ) ANSI/ASQ Z1.4 Sampling Procedures and Tables for Inspection by Attributes (DoD adopted) ASQ A8402 Quality Management and Quality Assurance Vocabulary (Copies of
13、 this document are available online at http:/www.asq.org/, or from the American Society for Quality, PO Box 3005, 611 E. Wisconsin Ave., Milwaukee, WI 53201-4606.) INTERNATIONAL ORGANIZATION FOR STANDARDIZATION ISO 3601-3 Fluid power systems O-ring Part 3: Quality acceptance criteria (Application fo
14、r copies should be addressed to the International Organization for Standardization, 1, ch. de la Voie-Creuse, Case postale 56 CH-1211 Geneva 20, Switzerland) 2.4 Order of precedence. Unless otherwise noted herein or in the contract, in the event of a conflict between the text of this document and th
15、e references cited herein, the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-DT
16、L-60525B 3 3. REQUIREMENTS 3.1 First article. When specified in the contract or purchase order (see 6.2), a sample shall be subjected to first article inspection (see 4.4 and 6.3). 3.2 Materials. All materials used in the manufacture of the initiators shall conform strictly to the specifications ref
17、erred to on the respective drawings unless specific approval in writing covering a departure therefrom has been obtained from the cognizant Navy design activity prior to manufacture. When alternate materials or methods of manufacture are specified on the drawings, the bidders selections shall be cle
18、arly stated in the proposal. 3.2.1 Raw material. The contractor shall be responsible for selecting from the classification list contained in the raw material specification the surface and physical condition of the raw material intended for use in manufacture. 3.3 Hardness and other physical properti
19、es. Physical properties required by the drawing shall be uniform throughout the part within specified tolerances. Requirements for all alloy steel parts shall be achieved by quenching and tempering. 3.4 Hydrostatic pressure. The initiator chamber and cap shall withstand a hydrostatic pressure of 14,
20、000 to 15,000 pounds per square inch (psi) for 15 seconds, minimum, without deformation or mechanical failure (see 6.4.1). 3.5 Firing pin release. The firing pin of the metal parts assembly, less safety pin, shall release from the cocked position when the application of an axial load of 18 to 25 pou
21、nds has withdrawn the initiator pin 0.370 inch, minimum, and 0.425 inch, maximum. 3.6 Initiator pin security. Application of an axial load of 200 to 220 pounds to the initiator pin of the metal parts assembly shall not withdraw the initiator pin past the safety pin. Load application shall cause no p
22、ermanent deformation of the safety pin. 3.7 Metal parts assembly. Parts shall be combined to produce an assembly which conforms to the requirements of the metal parts assembly drawing. All threaded joints shall be assembled handtight. 3.8 Protective finish. Protective finish shall be in accordance w
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILDTL60525B2012INITIATORCARTRIDGEACTUATEDM99METALPARTSASSEMBLYM99 金属 零件 组件 弹药 驱动 引爆 PDF

链接地址:http://www.mydoc123.com/p-978856.html