NAVY MIL-DTL-60519 B-2000 INITIATOR CARTRIDGE ACTUATED M53 METAL PARTS ASSEMBLY《M53型金属零件装配 延时弹筒驱动引发器》.pdf
《NAVY MIL-DTL-60519 B-2000 INITIATOR CARTRIDGE ACTUATED M53 METAL PARTS ASSEMBLY《M53型金属零件装配 延时弹筒驱动引发器》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-DTL-60519 B-2000 INITIATOR CARTRIDGE ACTUATED M53 METAL PARTS ASSEMBLY《M53型金属零件装配 延时弹筒驱动引发器》.pdf(13页珍藏版)》请在麦多课文档分享上搜索。
1、INCH-POUND MIL-DTL-605 19B 12 September 2000 SUPERSEDING MIL-1-605 19A 21 September 1992 DETAIL SPECIFICATION INITIATOR, CARTRIDGE ACTUATED, M53 METAL PARTS ASSEMBLY This specification is approved for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specific
2、ation covers the requirements for the M53 Cartridge Actuated Initiator Metal Parts Assembly (see 6.1). 2. APPLICABLE DOCUMENTS 2.1 General. The documents listed in this section are specified in sections 3 and 4 of this specification. This section does not include documents cited in other sections of
3、 this specification or recommended for additional information or as examples. While every effort has been made to ensure the completeness of this list, document users are cautioned that they must meet all specified requirements documents specified in sections 3 and 4 of this specification, whether o
4、r not they are listed. 2.2 Government documents. 2.2.1 Specifications and standards. The following specifications and standards form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are those listed in the Department of Defense Index o
5、f Specifications and Standards (DODISS) and supplement thereto, cited in the solicitation (see 6.2). SPECIFICATIONS DEPARTMENT OF DEFENSE MIL-A-2550 Ammunition, General Specification For Beneficid comments (rmmendctions, distribution is unlimited. Provided by IHSNot for ResaleNo reproduction or netw
6、orking permitted without license from IHS-,-,-MIL-DTL-605 19B STANDARDS DEPARTMENT OF DEFENSE MIL-STD-4 13 Visual Inspection Guide for Elastomeric O-rings (Unless otherwise indicated, copies of federal and military specifications and standards are available from Standardization Documents Order Desk,
7、 Bldg. 4D, 700 Robbins Avenue, Philadelphia, PA 191 11-5094.) 2.2.2 Other Government documents, drawings, and publications. The following other Government documents, drawings, and publications form a part of this document to the extent specified herein. Unless otherwise specified, the issues are tho
8、se cited in the solicitation. DRAWINGS NAVAL ORDNANCE STATION (CAGE Codes 19200 and 19203) 10520621 Initiator, Cartridge Actuated, M53 Metal Parts Assembly (Application for copies should be addressed to Commander, Naval Surface Warfare Center, Indian Head Division, 101 Strauss Avenue, Data Control B
9、ranch (Code 8410), Indian Head, MD 20640-5035.) 2.3 Non-Government publications and drawings. The following documents form a part of this document to the extent specified herein. Unless otherwise specified, the issues of the documents which are DOD adopted are those listed in the issue of the DODISS
10、 cited in solicitation. Unless otherwise specified, the issues of documents not listed in the DODISS are the issues of the documents cited in the solicitation (see 6.2). PUBLICATIONS AMERICAN SOCIETY FOR QUALITY CONTROL ASQC 21.4 Sampling Procedures and Tables for Inspection by Attributes ASQC A8402
11、 Quality Management and Quality Assurance Vocabulary (Appl icat ion for copies shoul d be addressed to the American Society for Qual it y Control, POBox 3005,611 E. Wisconsin Ave., Ml waukee, Wr53201-4606.) 2.4 Order of precedence. In the event of a conflict between the text of this document and the
12、 references cited herein (except for related associated specifications or specification sheets), the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained. 3. REQUIREMENTS 2 Provided by IHSN
13、ot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-DTL-605 19B 3.1 First article. When specified in the contract or purchase order (see 6.2), a sample shall be subjected to the first article inspection (see 4.4 and 6.3). 3.2 Materials. All materials used in the man
14、ufacture of the initiators shall conform to the specifications referred to on the respective drawings unless specific approval in writing covering a departure therefrom has been obtained from the cognizant Navy design activity prior to manufacture. When alternate materials or methods of manufacture
15、are specified on the drawings, the bidders selections shall be clearly stated in the proposal. 3.2.1 Raw material. The contractor shall be responsible for selecting from the classification list contained in the raw material specification the surface and physical condition of the raw material intende
16、d for use in manufacture. 3.3 Hardness and other physical properties. Hardness and other physical properties required by the drawing shall be uniform throughout the part within specified tolerances. Requirements for all alloy steel parts shall be achieved by quenching and tempering. 3.4 Hydrostatic
17、pressure. The initiator chamber and cap shall withstand a hydrostatic pressure of 14,000 to 15,000 pounds per square inch (psi) for 15 seconds, minimum, without deformation or mechanical failure (see 6.4.1). 3.5 Shear pin strength. The shear pin, after application of protective finish, shall shear w
18、hen a load of 20 f 1 pounds is applied at the steady rate of 0.125 inch per minute. 3.6 Metal parts assembly. Parts shall be combined to produce an assembly which conforms to the requirements of the metal parts assembly drawing. All threaded joints shall be assembled handtight. 3.7 Protective finish
19、. Protective finish shall be in accordance with the applicable specifications and shall apply to all surfaces of the component regardless of contour configuration. 3.8 Residual magnetism. The metal parts assembly shall not deflect the indicator of the compass more than five degrees in either directi
20、on using procedures in 4.6.5. 3.9 Workmanship. Initiators shall be free of cracks, splits, or other defects which might prevent proper mating with connecting parts or proper functioning of the device. 3.9.1. Metal defects. All components shall be free from cracks, splits, cold shuts, inclusions, por
21、osity, or any similar defect. 3.9.2 Burr. No part shall have a burr which might interfere with the assembly or function of the item or which might be injurious to personnel handling the item. 3.9.3 Foreign matter. No part or assembly shall contain chips, dirt, grease, rust, corrosion, or other forei
22、gn matter. 4. QUALITY ASSURANCE PROVISIONS 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-DTL-605 19B 4.1 Classification of inspections. The inspection requirements specified herein are classified as follows: a. First article inspection (see 4
23、.2) b. Conformance inspection (see 4.3). 4.1.2 Quality assurance terms and definitions. Reference shall be made to ASQC A804 to define the quality assurance terms used. 4.1.3 Inspections. Inspections shall be in accordance with MIL-A-2550. 4.1.4 Inspection conditions. Unless otherwise specified (see
24、 6.2), all inspections shall be performed under the following conditions: a. Temperature: room ambient (68 to 77EF) b. Altitude: sea level c. Humidity: 50 percent relative, maximum d. Atmospheric pressure: 14.7 psi 4.2 First article inspection. At the beginning of regular production, the contractor
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILDTL60519B2000INITIATORCARTRIDGEACTUATEDM53METALPARTSASSEMBLYM53 金属 零件 装配 延时 驱动 引发 PDF

链接地址:http://www.mydoc123.com/p-978855.html