NAVY MIL-C-81804 A-1987 CARTRIDGE IMPULSE MARK 124 MOD O《标识为124的0型推动式炮筒》.pdf
《NAVY MIL-C-81804 A-1987 CARTRIDGE IMPULSE MARK 124 MOD O《标识为124的0型推动式炮筒》.pdf》由会员分享,可在线阅读,更多相关《NAVY MIL-C-81804 A-1987 CARTRIDGE IMPULSE MARK 124 MOD O《标识为124的0型推动式炮筒》.pdf(10页珍藏版)》请在麦多课文档分享上搜索。
1、flIL-C-81804A 13 = 7799906 0357784 4 W _ _ MIL-C-R1804A(AS) 28 AUGUST 1987 SUPERSEDING 14 December 1970 MILL8 1804(AS) MILITARY SPECIFICATION CARTRIDGE, IMPULSE, MARK 124 MOD O This specification is approved for use within the Naval Air Systems Command, Departmcnt of the Navy, and is available for u
2、se by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification covers the requirements for the manufacture and acceptance of the Mark 124 Mod O Impulse Cartridge (see 6.1). 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specifications and standards.
3、The following specifications and standards form a part of this specification to the extent specified herein. Unless otherwise specified, the issues of these documents shall be those listed in the issue of the Department of Defense Index of Specifications and Standards (DODISS) and supplement thereto
4、, cited in the solicitation. SPECIFICATIONS Military MIL-P-116 Preservation-Packaging, Methods of MIL-D-21625 MIL-C-8 1803 MIL-D-81303 Design and Evaluation of Cartridges for Cartridge Actuated Devices Ignition Element, Electric, Mark 14 Mod O Design and Evaluation of Cartridges for Stores Suspensio
5、n Equipment. STANDARDS Military MIL-STD-105 Sampling Procedures and Tables for Inspection by Attributes MIL-STD-129 Marking for Shipment and Storage MIL-STD-453 Inspection, Radiographic Beneficial comments (recommendations, additions , deletions) and any pertinent data which may be of use in improvi
6、ng this document should be addressed to: Commanding Officer, Naval Air Engineering Center, Systems Engineering and Standardization Department (SESD) Code 93, Lakehurst, NJ 08733, by using the self-addressed Standardization Document Improvement Proposal (DD Form 1426) appearing at the end of this doc
7、ument or by letter. AMSC LV/A FSC 1377 THIS DOCUMENT CONTAINS 10 PAGES. - _- DISTRIBUTION STATEMENT : Approved for publicTelease; distribution is unlimited. Licensed by Information Handling Services. MIL-C-BZBOYA 13 W 7799706 0357985 b MIL-C-8 1804A(AS) 2.1.2 Drawings and publications. The following
8、 drawings and publications form a part of this specifica- tion to the extent specified herein. Unless otherwise specified, the issues shall be those in effect on the date of the solicitation. DRAWINGS Naval Air Systems Command (Code Ident 30003) DL 2520046 Ignition Element, Electrical, Mark 14 Mod O
9、 DL 2838195 Cartridge, Impulse, Mark 124 Mod O Cartridge, Impulse, Mark 124 Mod O, Packaging Assembly -.- DL 2838208 DL 2838209 Container, Inner, Assembly DL 844AS820 Test Fixture PUBLICATIONS Naval Sea Systems Command (Code Ident 5371 1) OP 5 Ammunition and Explosives Ashore WR-43 Preparation of Qu
10、ality Assurance Provisions Code of Federal Regulations 49 CFR 100-199 Transpor tation (Copies of specifications, standards, drawings, and publications required by contractors in connection with specific acquisition functions should be obtained from the contracting activity or as directed by the con-
11、 tracting activity). 2.2 Order of Precedence. In the event of a conflict between the text of this specification and the references cited herein (except for associated detail specifications, specification sheets or MS standards), the text of this specification shall take precedence. Nothing in this s
12、pecification, however, shall supersede applicable laws and regulations unless a specific exemption has been obtained. 3. REQUIREMENTS 3.1 First article. When specified in the contract or purchase order, a sample shall be subjected to first article inspection (see 4.4 and 6.3). 3.2 Conformance to doc
13、uments. The Mark 124 Mod O impulse cartridge covered by this specification shall be manufactured in accordance with DL 2838195 and all documents listed thereon. , Licensed by Information Handling ServicesMIL-C-8 1804AfAS) 3.3 Materials. Ail materials used in the manufacture of the cartridges shall c
14、onform strictly to the specifi- cations referred to on the respective drawings. When alternate materials or methods of manufacture are specified on the drawings, the bidders selections shall be clearly stated in the proposal. 3.4 Primary components. For the purposes of this specification the main pr
15、opellant charge Dwg. 2838195 and the Mark 14 Mod O electric ignition element (Dwg. 2520046) are defined as primary components. . 3.5 Ignition element. The ignition elements shall be furnished from lots which were manufactured within the past 12 months. The ignition elements shall be manufactured in
16、accordance with the drawings listed on DL 2520046, and shall be from lots which were accepted in accordance with the requirements of MIL-C-81803 (see 4.6.1). When the same contractor manufactures the Mark 14 Mod O electric ignition element and the Mark 124 Mod O impulse cartridge and assembles the i
17、gnition element in the cartridge, the preproduction and production test requirements of MIL-C-8 1803 for the ignition element shall be waived. Ignition elements shall be free of the defects listed in 4.6.1. 3.6 Propellant-charge. 3.6.1 Quantity. All propellant charges shall be as specified on Drawin
18、g 2838195 of DL 2838195. Charges shall be determined by weight rather than by volume measurement. 3.6.2 Smokeless powder, handling, and loading. The smokeless powder shall be subjected to no unnecessary handling or exposure to the atmosphere. The handling and loading of smokeless powder exposed to t
19、he atmosphere shall be performed only under conditions that do not permit the relative humidity to exceed 75 percent. 3.6.3 Smokeless powder, condition. The smokeless powder used shall exhibit no evidence of decomposi- tion (see 4.6.2) 3.7 Cartridge requirements. 3.7.1 Bridge circuit resistance. The
20、 resistance of the bridge circuit in each completely assembled cartridge, when measured electricalIy (see 4.6.4), shall be not less than 1.00 ohm nor more than 1.20 ohm. 3.7.2 X-ray. Cartridges shall be free of imperfections when X-rayed (see 4.6.6). 3.7.3 Leakage. Cartridge leakage rate shall be no
21、t greater than cubic centimeters of air per second (see 4.6.7). 3.8 Ballistic requirements. Cartridges shall meet the ballistic requirements specified in 3.8.1 through 3.8.3 when subjected to the test prescribed in 4.6.9. . 3.8.1 Velocity. The lower limit (L) of velocity shall be 18 ft/sec. 3.8.2 Mi
22、sfire. There shall be no misfires (see 4.6.9.2). 3.8.3 Hangfire. There shall be no hangfires (see 4.6.9.3). 3.8.4 No-fire. Each of the twenty cartridges set aside for integrity testing shall first meet the no-fire requirements of 4.6.8. 3 , Licensed by Information Handling ServicesMIL-C-8 1804A(AS)
23、3.8.5 Cartridge integrity.Twenty cartridges from each first article sample and production lot shall be sub- jected to the test of 4.6.5. There shall be no propellant gas leakage as described in 4.6.5.1. 3.9 Change in propellant lot. Whenever a change occurs in the propellant lot for the main charge,
24、 test firings shall be conducted in accordance with 4.8. No cartridge shall produce results outside the velocity limit of 3.8.1 and no cartridge shall fail to meet the requirements of 3.8.2 and 3.8.3. 3.10 Workmanship. Cartridges shall be free of the following defects: burrs, dents, deep scratches,
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYMILC81804A1987CARTRIDGEIMPULSEMARK124MODO 标识 124 推动 炮筒 PDF

链接地址:http://www.mydoc123.com/p-978033.html