1、A-A-591555 March 2003- 1 -METRICCOMMERCIAL ITEM DESCRIPTIONNITROGEN, HIGH PURITY, SPECIAL PURPOSE1.0 ABSTRACTThis document provides the requirements for the procurement of gaseous or liquid primarygrade nitrogen suitable for use in reactor plant, steam plant and shipyard applications wherehigh purit
2、y nitrogen is required.2.0 SOURCES OF REFERENCE DOCUMENTSThe list of documents and specifications pertinent to this commercial item description is providedin Table 3 of this document.3.0 TECHNICAL REQUIREMENTS3.1 Material RequirementsThe nitrogen shall conform to the type, grade and class specified
3、in Table A below.Type I nitrogen shall contain no solid particles whose maximum dimensions are greater than50 microns in size assured by the use of a 10 micron or better filter at or close to the cylindercharging manifold that is capable of removing foreign material.Beneficial comments, (recommendat
4、ions, additions, deletions) and any pertinent data which may beused in improving this document should be addressed to: Commander, Naval Sea SystemsCommand, ATTN 05Q, 1333 Isaac Hull Avenue SE, STOP 5160, Washington Navy Yard,DC 20376-5160.AMSC N/A FSC 6830DISTRIBUTION STATEMENT A. Approved for publi
5、c release; distribution is unlimited.Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-A-A-59155- 2 -Table ACharacteristics for Type I-Gaseous and Type II-Liquid NitrogenCharacteristic Grade RequirementPurityAB99.95 % Minimum by Volume99.50 % Minimum b
6、y VolumeArgon, Neon & Helium All Includes Trace QuantitiesOxygen ContentAB0.05 % Maximum by Volume0.50 % Maximum by VolumeMoisture Content All 0.02 mg/L MaximumOil All Oil FreeOdor All NoneHydrocarbon Content All 50 ppm as Methane by VolumeParticulate Content All 50 Microns in Size3.2 Manufacturing
7、and Process Requirements3.2.1 Mercury ContaminationThe nitrogen shall not contain and shall not be contaminated by mercury or mercurycompounds. During the manufacturing process, tests and inspections, the productshall not have come in direct contact with mercury, nor any of its compounds, nor anymer
8、cury containing device employing a single boundary of containment.3.2.2 Foreign Material ExclusionThe nitrogen shall be free from foreign material such as oil, grease, dirt and debris.Production operations shall be conducted so as to assure the required level ofcleanliness. Such operations may inclu
9、de but are not limited to the followingprecautions: Ensuring that the nitrogen containers are free from foreign material priorto fill, providing an area for fill operations that is free of dirt and debris, and maintainingthe fill equipment in a clean condition.3.2.3 Container RequirementsNew cylinde
10、rs shall conform to the requirements of FED-RR-C-901. Used orGovernment furnished cylinders shall conform to the requirements of MIL-STD-1411and 49 CFR 100-199 prior to refilling. Cylinders are to be color coded according toMIL-STD-101. Type II liquid nitrogen shall be contained in either supplier o
11、wned orGovernment owned insulated containers in accordance with 49 CFR 171-190.Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-A-A-59155- 3 -3.2.4 Valve RequirementsCylinder valves shall conform to the requirements of MIL-DTL-2, Valve OutletApplicati
12、on 580 for cylinders with rated pressures less than 3000 psig andApplication 680 for cylinders with rated pressures greater than 3000 psig.3.2.5. Lot Size RequirementsA lot is defined as all nitrogen produced during a consecutive 24-hour period from thesame source, by one manufacturer, at one plant,
13、 from the same materials, and underessentially the same manufacturing conditions provided the operation is continuous. Asource is considered to be either an individual nitrogen producing process or anindividual storage container to which no nitrogen is added after the initial filling.In the event th
14、e process is a batch operation, each batch (see 3.2.6 below) shallconstitute a lot. Even if a batch is larger, each lot of Type I nitrogen cylinders ready fordelivery shall be limited to a maximum of 500 cylinders. For Type II liquid nitrogen,each individually filled container shall be considered a
15、lot.3.2.6 Batch RequirementThat quantity of material which has been manufactured by some unit chemical process.3.2.7 Processing RequirementsType I gaseous nitrogen shall be manufactured by any process known not to introduceoil into the nitrogen. Type I gaseous nitrogen shall be compressed with a wat
16、er-lubricated or dry-seal compressor or produced using a cryogenic converter from aliquid nitrogen source. Cylinders shall be filled using a 10-micron or better filter,positioned at or close to the cylinder charging manifold, that is capable of removingboth oil and solid particulates.The settled pre
17、ssure in a filled container shall be within 25 psig of the pressure thatcorresponds to the settled container temperature as shown on Table 2.4.0. QUALITY ASSURANCE PROVISIONS4.1 Inspection System RequirementsThe vendor shall maintain complete records for all inspections and tests performed on thepro
18、duct. The records shall be traceable by the vendors lot or batch number. These recordsshall indicate the nature and number of observations made, the number and type of deficienciesfound, the quantities approved and rejected, and the specific actions taken to correct thedeficiencies.Provided by IHSNo
19、t for ResaleNo reproduction or networking permitted without license from IHS-,-,-A-A-59155- 4 -4.2 Test Equipment RequirementsAll gages, measuring and test equipment used in the tests, inspection and processing of theproduct shall be calibrated to certified standards that have known, valid relations
20、hips tonationally accepted industry standards. The calibration frequency for each device shall bebased on its stability, purpose and usage. A positive means (such as stickers) shall be providedto identify the calibration interval, last date of calibration and date calibration is due for eachdevice.
21、Complete written records of calibration data traceable to the individual test devices shallbe available for Contracting Agency review.4.3 Contract Certification RequirementsThe contractor shall certify and maintain substantiating evidence that the product offered meetsthe salient characteristics of
22、this Commercial Item Description in accordance with the requiredfrequency of testing specified in Section 3.2.5 and that the product conforms to the producersown drawings, specifications, standards, and quality assurance practices, and is the sameproduct offered for sale in the commercial marketplac
23、e. The Government reserves the right torequire proof of such conformance prior to first delivery and thereafter as may be provided forunder the provisions of the contract.4.4 Inspection RequirementsSampling for visual inspection of Type I containers shall be performed on those containers thatare rea
24、dy for delivery. Samples shall be chosen randomly and in accordance with Table 1.Type I containers should be sampled from near the beginning and end of the production run,and if more than two containers are required, from points in between. Type II containers shallbe visually inspected individually.
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NAVYAA591552003NITROGENHIGHPURITYSPECIALPURPOSE 专门 用途 纯度 PDF

链接地址:http://www.mydoc123.com/p-976357.html