NASA UFGS-23 36 00 00 40-2011 AIR TERMINAL UNITS《航空集散站装置》.pdf
《NASA UFGS-23 36 00 00 40-2011 AIR TERMINAL UNITS《航空集散站装置》.pdf》由会员分享,可在线阅读,更多相关《NASA UFGS-23 36 00 00 40-2011 AIR TERMINAL UNITS《航空集散站装置》.pdf(31页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-23 36 00.00 40 (February 2011)-Preparing Activity: NASA SupersedingUFGS-23 36 00 (November 2010)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2011*SECTION TABLE OF CONTENTSDIVISION 23 - HEATING, VENTILATING, AND AIR COND
2、ITIONINGSECTION 23 36 00.00 40AIR TERMINAL UNITS02/11PART 1 GENERAL1.1 REFERENCES1.2 SUBMITTALS1.3 GENERAL REQUIREMENTS1.4 QUALITY ASSURANCE1.5 COORDINATIONPART 2 PRODUCTS2.1 BYPASS SINGLE-DUCT AIR TERMINAL UNITS2.1.1 Configuration2.1.2 Casing2.1.3 Diverter Assembly2.1.4 Multi-Outlet Attenuator Sect
3、ion2.1.5 Hot-Water Heating Coil2.1.6 Electric Heating Coil2.1.7 Electric Controls2.1.8 Electronic Controls2.1.9 Pneumatic Controls2.1.9.1 Pneumatic Damper Operator2.1.9.2 Velocity Controllers2.1.10 Thermostat2.2 DUAL-DUCT AIR TERMINAL UNITS2.2.1 Configuration2.2.2 Casing2.2.2.1 Casing Lining2.2.3 Vo
4、lume Damper2.2.4 Attenuator Section2.2.5 Multi-Outlet Attenuator Section2.2.6 Pneumatic Controls2.2.6.1 Pneumatic Damper Operator2.2.6.2 Velocity Controllers2.2.6.3 Thermostat2.2.7 Electronic Controls2.2.7.1 Damper ActuatorSECTION 23 36 00.00 40 Page 1Provided by IHSNot for ResaleNo reproduction or
5、networking permitted without license from IHS-,-,-2.2.7.2 Velocity Control2.2.7.3 Thermostat2.2.8 DDC Controls2.2.8.1 Damper Actuators2.2.8.2 Velocity Sensors2.2.8.3 Terminal Unit Controller2.2.8.4 Room Sensor2.2.9 Control Sequence2.3 FAN-POWERED AIR TERMINAL UNITS2.3.1 Configuration2.3.2 Casing2.3.
6、2.1 Casing Lining2.3.3 Volume Damper2.3.4 Fan Section2.3.4.1 Lining2.3.4.2 Motor2.3.4.3 Air Filter2.3.5 Attenuator Section2.3.6 Hot-Water Heating Coil2.3.7 Electric Heating Coil2.3.8 Factory-Mounted and -Wired Controls2.3.9 Control Panel Enclosure2.3.10 Electric Controls2.3.11 Pneumatic Controls2.3.
7、11.1 Pneumatic Damper Operator2.3.11.2 Velocity Controller2.3.11.3 Thermostat2.3.12 Electronic Controls2.4 INDUCTION AIR TERMINAL UNITS2.4.1 Configuration2.4.2 Casing2.4.2.1 Casing Lining2.4.3 Volume Damper2.4.4 Induction Damper2.4.5 Hot-Water Heating Coil2.4.6 Electric Heating Coil2.4.7 Pneumatic C
8、ontrols2.4.7.1 Damper Operator2.4.7.2 Velocity Controller2.4.7.3 Induction Damper Operator2.4.7.4 Thermostat2.4.8 Electronic Controls2.4.8.1 Damper Actuator2.4.8.2 Velocity Controller2.4.8.3 Induction Damper Operator2.4.8.4 Thermostat2.5 SHUTOFF SINGLE-DUCT AIR TERMINAL UNITS2.5.1 Configuration2.5.2
9、 Casing2.5.2.1 Casing Lining2.5.3 Regulator Assembly2.5.3.1 Automatic Flow-Control Assembly2.5.4 Regulator Assembly2.5.5 Volume Damper2.5.6 Attenuator Section2.5.7 Multi-Outlet Attenuator Section2.5.8 Hot-Water Heating Coil2.5.9 Electric Heating Coil2.5.10 Electric ControlsSECTION 23 36 00.00 40 Pag
10、e 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.5.10.1 Damper Actuator2.5.10.2 Thermostat2.5.11 Pneumatic Controls2.5.11.1 Pneumatic Damper Operator2.5.11.2 Velocity Controllers2.5.11.3 Thermostat2.5.12 Electronic Controls2.5.12.1 Damper Actuato
11、r2.5.12.2 Velocity Controller2.5.12.3 Thermostat2.5.13 DDC Controls2.5.13.1 Damper Actuators2.5.13.2 Terminal Unit Controller2.5.13.3 Room Sensor2.5.14 Control Sequence2.6 INTEGRAL-DIFFUSER AIR TERMINAL UNITS2.6.1 Configuration2.6.2 Casing2.6.2.1 Casing Lining2.6.3 Volume Damper2.6.4 Diffuser2.6.5 E
12、lectric Controls2.6.5.1 Damper Actuator2.6.5.2 Thermostat2.6.6 Pneumatic Controls2.6.6.1 Pneumatic Damper Operator2.6.6.2 Velocity Controller2.6.6.3 Thermostat2.6.7 Electronic Controls2.6.7.1 Damper Actuator2.6.7.2 Velocity Controller2.6.7.3 Thermostat2.6.8 Control Sequence2.7 HIGH-PRESSURE DUAL-DUC
13、T MIXING BOXES2.7.1 Construction2.7.2 Casing Leakage2.7.3 Inlet Valve Leakage2.7.4 Mixed-Air Temperature Requirements2.7.5 Volume Control Requirements2.7.6 Sound Level Requirements2.7.7 Control Requirements2.8 LOW-PRESSURE DUAL-DUCT MIXING BOXES2.8.1 Casing Leakage2.8.2 Inlet Valve Leakage2.8.3 Mixe
14、d-Air Temperature Requirements2.8.4 Sound Level Requirements2.8.5 Control Requirements2.9 SOURCE QUALITY CONTROL2.9.1 Identification2.9.2 Verification of PerformancePART 3 EXECUTION3.1 INSTALLATION3.2 CONNECTIONS3.2.1 Hot-Water Piping3.3 OPERATION AND MAINTENANCE3.4 FIELD QUALITY CONTROL3.4.1 Leak T
15、estSECTION 23 36 00.00 40 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-3.4.2 Operational Test3.5 STARTUP SERVICE3.6 DEMONSTRATION- End of Section Table of Contents -SECTION 23 36 00.00 40 Page 4Provided by IHSNot for ResaleNo reproduction or
16、 networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-23 36 00.00 40 (February 2011)-Preparing Activity: NASA SupersedingUFGS-23 36 00 (November 2010)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2011*SECTION 23 36 00.00 40
17、AIR TERMINAL UNITS02/11*NOTE: This guide specification covers the requirements for bypass single-duct air terminal units, dual-duct air terminal units, fan-powered air terminal units, induction air terminal units, shutoff single-duct air terminal units and integral-diffuser air terminal units for ai
18、r handling systems.Adhere to UFC 1-300-02 Unified Facilities Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this guide specification for project specific requirements by adding, deleting, or revising text. For b
19、racketed items, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments, suggestions and recommended changes for this guide specification are welcome and should be submitted as a
20、 Criteria Change Request (CCR).*PART 1 GENERAL*NOTE: Clearly portray system dynamics in drawings and schedules so that equipment functions as required.*1.1 REFERENCES*NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to
21、in the text by basic designation only and listed in SECTION 23 36 00.00 40 Page 5Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you a
22、dd a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project specificat
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NASAUFGS23360000402011AIRTERMINALUNITS 航空 集散 装置 PDF

链接地址:http://www.mydoc123.com/p-836587.html