NASA UFGS-23 22 23 00 40-2011 STEAM CONDENSATE PUMPS《蒸汽冷凝泵》.pdf
《NASA UFGS-23 22 23 00 40-2011 STEAM CONDENSATE PUMPS《蒸汽冷凝泵》.pdf》由会员分享,可在线阅读,更多相关《NASA UFGS-23 22 23 00 40-2011 STEAM CONDENSATE PUMPS《蒸汽冷凝泵》.pdf(13页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-23 22 23.00 40 (February 2011)-Preparing Activity: NASA SupersedingUFGS-23 22 23 (August 2008)UFGS-23 22 00.00 40 (April 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2011*SECTION TABLE OF CONTENTSDIVISION 23 - HEAT
2、ING, VENTILATING, AND AIR CONDITIONINGSECTION 23 22 23.00 40STEAM CONDENSATE PUMPS02/11PART 1 GENERAL1.1 REFERENCES1.2 SUBMITTALS1.3 GENERAL REQUIREMENTS1.3.1 Factory TestsPART 2 PRODUCTS2.1 CONDENSATE RETURN PUMP UNITS2.1.1 Pumps2.1.2 Motor Requirements2.1.3 Receiver2.1.4 Controls2.2 CONDENSATE REC
3、EIVER2.2.1 Materials and Construction2.2.2 Accessories2.3 RECIPROCATING STEAM PUMPS (RSP)2.3.1 Construction2.3.2 Tools and Accessories2.3.3 Steam-Cylinder DrainagePART 3 EXECUTION3.1 INSTALLATION3.2 TESTING3.2.1 Vibration Analyzer3.2.2 Acceptance Testing- End of Section Table of Contents -SECTION 23
4、 22 23.00 40 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-23 22 23.00 40 (February 2011)-Preparing Activity: NASA SupersedingUFGS-23 22 23 (August 2008)UFGS-23 22 00.00 40 (April 2008)UNIFIED FACILITIES G
5、UIDE SPECIFICATIONSReferences are in agreement with UMRL dated April 2011*SECTION 23 22 23.00 40STEAM CONDENSATE PUMPS02/11*NOTE: This guide specification covers the requirements for condensate return pump units and condensate steam pumps. Delete, select or rewrite any of the following paragraphs as
6、 required by project conditions.This specification includes units to indicated equivalent direct radiation (edr) with discharge pressures of up to 450 kilopascal 60 pounds per square inch, gage.Motors are covered in Section 26 60 13.00 40 LOW-VOLTAGE MOTORS.Adhere to UFC 1-300-02 Unified Facilities
7、Guide Specifications (UFGS) Format Standard when editing this guide specification or preparing new project specification sections. Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed items, choose applicable items(s) or insert appropri
8、ate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments, suggestions and recommended changes for this guide specification are welcome and should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 REFERENCES*
9、NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in SECTION 23 22 23.00 40 Page 2Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-the text by basic designation only an
10、d listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference featur
11、e to update the issue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.*The publications listed below form a part of this specification to the extent referenced. The
12、 publications are referred to within the text by the basic designation only.ASME INTERNATIONAL (ASME)ASME BPVC SEC VIII D1 (2007; Addenda 2008; Addenda 2009) BPVC Section VIII-Rules for Construction of Pressure Vessels Division 1HYDRAULIC INSTITUTE (HI)HI M100 (2009) HI Pump Standards SetINTERNATION
13、AL ORGANIZATION FOR STANDARDIZATION (ISO)ISO 1940-1 (2003; Cor 2005) Mechanical Vibration - Balance Quality Requirements for Rotors in a Constant (Rigid) State - Part 1: Specification and Verification of BalanceISO 2858 (1975) End Suction Centrifugal Pump (Rating 16 Bar) Designation Nominal Duty Poi
14、nt and Dimensions - International RestrictionsISO 5199 (2002) Technical Specifications for Centrifugal Pumps, Class IINATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)NEMA MG 1 (2009) Motors and Generators1.2 SUBMITTALS*NOTE: Review Submittal Description (SD) definitions in Section 01 33 00 SUBMI
15、TTAL PROCEDURES and edit the following list to reflect only the submittals required for the project. Submittals should be kept to the minimum required for adequate quality control.SECTION 23 22 23.00 40 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from I
16、HS-,-,-A “G” following a submittal item indicates that the submittal requires Government approval. Some submittals are already marked with a “G”. Only delete an existing “G” if the submittal item is not complex and can be reviewed through the Contractors Quality Control system. Only add a “G” if the
17、 submittal is sufficiently important or complex in context of the project.For submittals requiring Government approval on Army projects, a code of up to three characters within the submittal tags may be used following the “G“ designation to indicate the approving authority. Codes for Army projects u
18、sing the Resident Management System (RMS) are: “AE“ for Architect-Engineer; “DO“ for District Office (Engineering Division or other organization in the District Office); “AO“ for Area Office; “RO“ for Resident Office; and “PO“ for Project Office. Codes following the “G“ typically are not used for Na
19、vy, Air Force, and NASA projects.Choose the first bracketed item for Navy, Air Force and NASA projects, or choose the second bracketed item for Army projects.*Government approval is required for submittals with a “G“ designation; submittals not having a “G“ designation are for Contractor Quality Con
20、trol approval.for information only. When used, a designation following the “G“ designation identifies the office that will review the submittal for the Government. Submit the following in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:SD-02 Shop DrawingsSubmit the following in accordance with
21、 paragraph entitled, “General Requirements,“ of this section.Connection DiagramsControl DiagramsFabrication DrawingsInstallation DrawingsSD-03 Product DataSubmit Manufacturers catalog data for condensate pumps showing equipment foundation data and equipment and performance data including performance
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NASAUFGS23222300402011STEAMCONDENSATEPUMPS 蒸汽 冷凝 PDF

链接地址:http://www.mydoc123.com/p-836585.html