NASA UFGS-23 05 15-2009 COMMON PIPING FOR HVAC《暖通空调的普通管道系统》.pdf
《NASA UFGS-23 05 15-2009 COMMON PIPING FOR HVAC《暖通空调的普通管道系统》.pdf》由会员分享,可在线阅读,更多相关《NASA UFGS-23 05 15-2009 COMMON PIPING FOR HVAC《暖通空调的普通管道系统》.pdf(45页珍藏版)》请在麦多课文档分享上搜索。
1、*USACE / NAVFAC / AFCESA / NASA UFGS-23 05 15 (February 2009)-Preparing Activity: NASA SupersedingUFGS-23 05 00.00 40 (August 2008)UNIFIED FACILITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated January 2009*SECTION TABLE OF CONTENTSDIVISION 23 - HEATING, VENTILATING, AND AIR COND
2、ITIONINGSECTION 23 05 15COMMON PIPING FOR HVAC02/09PART 1 GENERAL1.1 REFERENCES1.2 GENERAL REQUIREMENTS1.3 SUBMITTALS1.4 QUALITY ASSURANCE1.4.1 Material and Equipment Qualifications1.4.2 Alternative Qualifications1.4.3 Service Support1.4.4 Manufacturers Nameplate1.4.5 Modification of References1.4.5
3、.1 Definitions1.4.5.2 Administrative Interpretations1.5 DELIVERY, STORAGE, AND HANDLING1.6 ELECTRICAL REQUIREMENTS1.7 ELECTRICAL INSTALLATION REQUIREMENTS1.7.1 New Work1.7.2 Modifications to Existing Systems1.7.3 High Efficiency Motors1.7.3.1 High Efficiency Single-Phase Motors1.7.3.2 High Efficienc
4、y Polyphase Motors1.7.4 Three-Phase Motor Protection1.8 INSTRUCTION TO GOVERNMENT PERSONNEL1.9 ACCESSIBILITYPART 2 PRODUCTS2.1 ELECTRICAL HEAT TRACING2.2 PIPE AND FITTINGS2.2.1 Type BCS, Black Carbon Steel2.2.2 Type BCS-125, 862 kilopascal Service 125-psi Service2.2.3 Type GCS, Galvanized Carbon Ste
5、el2.2.4 Type GCS-DWV, Galvanized Steel Drain, Waste and Vent2.2.5 Type CISP-DWV, Cast-Iron Drain, Waste and Vent2.2.6 Type CPR, Copper2.2.6.1 Type CPR-A, Copper Above GroundSECTION 23 05 15 Page 1Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-2.2.6.
6、2 Type CPR-U, Copper Under Ground2.2.6.3 Type CPR-INS, Copper Under Ground Insulated2.2.7 Grooved Pipe Couplings and Fittings2.3 PIPING SPECIALTIES2.3.1 Air Separator2.3.2 Air Vents2.3.3 Compression Tank2.3.4 Dielectric Connections2.3.5 Expansion Vibration Isolation Joints2.3.6 Flexible Pipe2.3.7 Fl
7、exible Metallic Pipe2.3.8 Flexible Metal Steam Hose2.3.9 Metallic Expansion Joints2.3.10 Hose Faucets2.3.11 Pressure Gages2.3.12 Sight-Flow Indicators2.3.13 Sleeve Couplings2.3.14 Thermometers2.3.15 Pump Suction Strainers2.3.16 Line Strainers, Water Service2.3.17 Line Strainers, Steam Service2.4 VAL
8、VES2.4.1 Ball and Butterfly Valves2.4.2 Drain, Vent, and Gage Cocks2.4.3 Gate Valves (GAV)2.4.4 Globe and Angle Valves (GLV-ANV)2.4.5 Standard Check Valves (SCV)2.4.6 Nonslam Check Valves (NSV)2.5 MISCELLANEOUS MATERIALS2.5.1 Bituminous Coating2.5.2 Bolting2.5.3 Elastomer Calk2.5.4 Escutcheons2.5.5
9、Flashing2.5.6 Flange Gaskets2.5.7 Grout2.5.8 Pipe Thread Compounds2.6 SUPPORTING ELEMENTS2.6.1 Building Structure Attachments2.6.1.1 Anchor Devices, Concrete and Masonry2.6.1.2 Beam Clamps2.6.1.3 C-Clamps2.6.1.4 Inserts, Concrete2.6.2 Horizontal Pipe Attachments2.6.2.1 Single Pipes2.6.2.2 Parallel P
10、ipes2.6.3 Vertical Pipe Attachments2.6.4 Hanger Rods and Fixtures2.6.5 Supplementary SteelPART 3 EXECUTION3.1 PIPE INSTALLATION3.2 VALVES3.3 SUPPORTING ELEMENTS INSTALLATION3.4 PENETRATIONS3.5 SLEEVES3.6 ESCUTCHEONS3.7 FLASHINGSSECTION 23 05 15 Page 2Provided by IHSNot for ResaleNo reproduction or n
11、etworking permitted without license from IHS-,-,-3.8 UNDERGROUND PIPING INSTALLATION3.9 HEAT TRACE CABLE INSTALLATION3.10 DISINFECTION3.11 HEAT TRACE CABLE TESTS3.12 OPERATION AND MAINTENANCE3.13 PAINTING OF NEW EQUIPMENT3.13.1 Factory Painting Systems3.13.2 Shop Painting Systems for Metal Surfaces-
12、 End of Section Table of Contents -SECTION 23 05 15 Page 3Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-*USACE / NAVFAC / AFCESA / NASA UFGS-23 05 15 (February 2009)-Preparing Activity: NASA SupersedingUFGS-23 05 00.00 40 (August 2008)UNIFIED FACIL
13、ITIES GUIDE SPECIFICATIONSReferences are in agreement with UMRL dated January 2009*SECTION 23 05 15COMMON PIPING FOR HVAC02/09*NOTE: This specification covers the requirements for standard basic mechanical work and should be supplemented by use of other mechanical sections as required.Show on the dr
14、awings detailed upstream and downstream piping anchor provisions.Install flexible metallic pipe vertically to keep dirt out of convolutions.Coordinate design detail and specification for each installation with the manufacturer to ensure that length, stiffness of hose, and slack are suitable for the
15、intended offset, travel, and imposed service under normal and shock conditions.Indicate on the drawings use for main steamline dripping where amount of expansion and contraction is such that movement cannot be readily accommodated by piping configuration, with excessive stress on pressurized compone
16、nts or where there is a tendency to cause leaks at connections to mains. Tunnels, trenches, manholes, and above-ground steamlines are prime locations; pressure rating must provide for water-hammer shock. This specification is limited to15 millimeter through 25 millimeter1/2 inch through 1 inch. Use
17、welded pipe, valve, and hole connections wherever possible. Provide a welded end steam strainer upstream of hose to prevent welding bead penetration of bellows upon start up. Wherever possible, install flexible metal steam hose vertically.Show on the Drawings, or supplement the specifications to inc
18、lude, calculated movement of piping, operating pressure and temperature ranges, fluid velocity, piping anchor and guiding provisions, limit stops, installation length, end connections, and special conditions such as angular displacement and vibration analysis in one or more SECTION 23 05 15 Page 4Pr
19、ovided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-planes.This specification does not include slip-type expansion joints or ball joints.Edit this guide specification for project specific requirements by adding, deleting, or revising text. For bracketed it
20、ems, choose applicable items(s) or insert appropriate information.Remove information and requirements not required in respective project, whether or not brackets are present.Comments and suggestions on this guide specification are welcome and should be directed to the technical proponent of the spec
21、ification. A listing of technical proponents, including their organization designation and telephone number, is on the Internet.Recommended changes to a UFGS should be submitted as a Criteria Change Request (CCR).*PART 1 GENERAL1.1 REFERENCES*NOTE: This paragraph is used to list the publications cit
22、ed in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.Use the Reference Wizards Check Reference feature when you add a RID outside of the Sections Reference Article
23、to automatically place the reference in the Reference Article. Also use the Reference Wizards Check Reference feature to update the issue dates.References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- NASAUFGS2305152009COMMONPIPINGFORHVAC 暖通 空调 普通 管道 系统 PDF

链接地址:http://www.mydoc123.com/p-836581.html