MSFC NASA MWI 8040 5 REV C-2008 FLOOR ENGINEERING ORDERS AND FLOOR ENGINEERING PARTS LISTS (FEOs FEPLs)《地面工程指令和地面工程零件列表(feos fepls)》.pdf
《MSFC NASA MWI 8040 5 REV C-2008 FLOOR ENGINEERING ORDERS AND FLOOR ENGINEERING PARTS LISTS (FEOs FEPLs)《地面工程指令和地面工程零件列表(feos fepls)》.pdf》由会员分享,可在线阅读,更多相关《MSFC NASA MWI 8040 5 REV C-2008 FLOOR ENGINEERING ORDERS AND FLOOR ENGINEERING PARTS LISTS (FEOs FEPLs)《地面工程指令和地面工程零件列表(feos fepls)》.pdf(6页珍藏版)》请在麦多课文档分享上搜索。
1、CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE MWI 8040.5 REVISION C EFFECTIVE DATE: November 19, 2008 EXPIRATION DATE: November 19, 2013 MARSHALL WORK INSTRUCTION ED01 FLOOR ENGINEERING ORDERS AND FLOOR ENGINEERI
2、NG PARTS LISTS (FEOs/FEPLs) Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Work Instruction ED01 Floor Engineering Orders and Floor MWI 8040.5 Revision: C Engineering Parts Lists (FEO/FEPLs) Date: November 19, 2008 Page 2 of 6 CHECK THE MAS
3、TER LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE DOCUMENT HISTORY LOG Status (Baseline/ Revision/ Canceled) Document Revision Effective Date Description Baseline 10/1/00 MWI derived from CM-INST-001 and CM-INST-003. Previous his
4、tory retained as part of historical MSFC Documentation Repository files. Revision A 1/16/02 Deleted paragraph 3.2, CM-INST-002, and renumbered subsequent paragraphs. Paragraph 5, last sentence: deleted “as defined in CM-INST-002“ and replaced with “accessible at http:/starbase.msfc.nasa.gov:8000/for
5、ms.“ Paragraph 6.2.3.1, deleted “according to CM-INST-002.“ Footer URL updated 01/14/2004 by Directives Manager. Revision B 10/28/2004 Updated document to clarify “shall” statements and update formatting per Rules Review. Revision C 11/19/2008 Revised 2. Applicability statement to address the applic
6、ability of this directive to the Michoud Assembly Facility. Reflects minor editorial changes. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Work Instruction ED01 Floor Engineering Orders and Floor MWI 8040.5 Revision: C Engineering Parts L
7、ists (FEO/FEPLs) Date: November 19, 2008 Page 3 of 6 CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE TABLE OF CONTENTS PARAGRAPH PAGE TABLE OF CONTENTS.3 1. PURPOSE 4 2. APPLICABILITY4 3. APPLICABLE DOCUMENTS .4 4.
8、 REFERENCES 4 5. DEFINITIONS.4 6. INSTRUCTIONS.4 6.1 Organization Performing Modification of Hardware .4 6.2 Responsible Design Activity 5 6.3 MSFC Release Desk .5 6.4 Quality Assurance .5 7. NOTES6 8. SAFETY PRECAUTIONS AND WARNING NOTES .6 9. RECORDS 6 10. PERSONNEL TRAINING AND CERTIFICATIONS 6 1
9、1. FLOW DIAGRAM .6 12. CANCELLATION6 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Work Instruction ED01 Floor Engineering Orders and Floor MWI 8040.5 Revision: C Engineering Parts Lists (FEO/FEPLs) Date: November 19, 2008 Page 4 of 6 CHEC
10、K THE MASTER LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE 1. PURPOSE This Marshall Work Instruction (MWI) provides instructions for expediting the process of change documentation (engineering orders (EOs) and engineering parts l
11、ists (EPLs) as floor engineering orders/floor engineering parts lists ( FEOs/FEPLs) to allow manufacturing or test organizations to proceed without interruption. This process avoids schedule impacts while the change package containing the official baseline configuration documentation is in the prepa
12、ration, approval, and release cycle. NOTE: The FEO/FEPL method is a risk jointly taken by the responsible design and manufacturing or test organizations. 2. APPLICABILITY This MWI applies to the personnel, programs, projects, and activities at Marshall Space Flight Center (MSFC) and MSFCs Michoud As
13、sembly Facility (MAF), including contractors and resident agencies to the extent specified in their respective contracts or agreements. (“Contractors,” for purposes of this paragraph, include contractors, grantees, Cooperative Agreement recipients, Space Act Agreement partners, or other agreement pa
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- MSFCNASAMWI80405REVC2008FLOORENGINEERINGORDERSANDFLOORENGINEERINGPARTSLISTSFEOSFEPLS 地面 工程 指令 零件 列表 FEOSFEPLSPDF

链接地址:http://www.mydoc123.com/p-822912.html