MSFC NASA MWI 7120 2 REV C-2009 DATA REQUIREMENTS IDENTIFICATION DEFINITION《数据要求识别 定义》.pdf
《MSFC NASA MWI 7120 2 REV C-2009 DATA REQUIREMENTS IDENTIFICATION DEFINITION《数据要求识别 定义》.pdf》由会员分享,可在线阅读,更多相关《MSFC NASA MWI 7120 2 REV C-2009 DATA REQUIREMENTS IDENTIFICATION DEFINITION《数据要求识别 定义》.pdf(29页珍藏版)》请在麦多课文档分享上搜索。
1、CHECK THE MASTER LIST at: https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE MWI 7120.2 REVISION C EFFECTIVE DATE: February 4, 2009 EXPIRATION DATE: February 4, 2014 MARSHALL WORK INSTRUCTION ED01 DATA REQUIREMENTS IDENTIFICATION/ DEFINITION
2、Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Work Instruction ED01 Data Requirements MWI 7120.2 Revision: C Identification/Definition Date: February 4, 2009 Page 2 of 29 CHECK THE MASTER LIST at: https:/repository.msfc.nasa.gov/directives
3、/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE DOCUMENT HISTORY LOG Status (Baseline/ Revision/ Canceled) Document Revision Effective Date Description Baseline 5/14/99 Revision A 8/16/99 Organizational change to reflect systems engineer versus chief engineer in paragraph 6.3. Wor
4、ds added to paragraph 5.2.15 to clarify verification data category. Revision B 10/5/2004 Complete Revision. Updated URL. Font changed to Times New Roman as directed. Changed approval signature. Ensured requirements are stated as “Who/What Shall”. Made document easier to follow by reorganizing to mov
5、e CDRM data to the end. Addressed ACI requirements, especially marking of contractor data. Emphasized use of an overall DRL in lieu of IDRD format by removing IDRD data. Specified data fields that must be captured in the DRL for accounting/tracking. Eliminated the Reports of Work at the request of P
6、rocurement. Added a more efficient way to address requirements for a small procurement. Added recommended control process definitions to be applied to NASA-produced data. Added sample Contracting Officers letter. Supporting text remains in the body of document. The use of “will” for direction to NAS
7、A and “shall” for direction to the contractor in examples of contract language remains in the document. Revision C 2/4/2009 Revised 2. Applicability statement to address the applicability of this directive to the Michoud Assembly Facility; throughout document, revised paragraphs to reflect one requi
8、rement per line item and renumbered accordingly; 5. Definitions, shorten definitions 5.2 and 5.13; 6.3 removed reference to Appendix B and inserted DRM Web site, delete last sentence; 6.3.2.1.c deleted Page Revision Log (PRL); 6.3.2.2b.1 deleted Page Revision Log; Moved Data Type definitions to Chap
9、ter 2; 9. Records, identified record schedules; Chapter 1, renumbered to be in accordance with MPR 1410.2; Appendix B deleted sample DPD, inserted DPD/DRL flowchart for contracts; Appendix C inserted DRL development flowchart for NASA activity; Renumber Appendix C as Appendix D, deleted sample DRD a
10、nd moved “Instructions for Elements of a DRD” to Chapter 1; renumbered and labeled Appendix Z correctly; defined in house (NASA activity) categories in Z.1.1.1 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Work Instruction ED01 Data Requir
11、ements MWI 7120.2 Revision: C Identification/Definition Date: February 4, 2009 Page 3 of 29 CHECK THE MASTER LIST at: https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE TABLE OF CONTENTS PARAGRAPH PAGE TABLE OF CONTENTS. 3 1. PURPOSE. 4 2. AP
12、PLICABILITY. 4 3. APPLICABLE DOCUMENTS 4 4. REFERENCES . 4 5. DEFINITIONS 4 6. INSTRUCTIONS 6 6.1 IDENTIFICATION/DEFINITION OF DATA REQUIREMENTS. 6 6.2 DEVELOPMENT OF A DATA REQUIREMENTS LIST (DRL) FOR ALL NASA ACTIVITIES 6 6.3 DATA PROCUREMENT DOCUMENT (DPD) DEVELOPMENT. 7 6.4 CENTER DATA REQUIREME
13、NTS MANAGEMENT .11 7. NOTES13 8. SAFETY PRECAUTIONS AND WARNING NOTES .13 9. RECORDS 13 10. PERSONNEL TRAINING AND CERTIFICATIONS 14 11. FLOW DIAGRAM .14 12. CANCELLATION14 CHAPTER 1 INSTRUCTIONS FOR EACH ELEMENT15 CHAPTER 2 DATA TYPES.18 APPENDIX A DATA CATEGORY DEFINITIONS .20 APPENDIX B DATA PROC
14、URMENT DOCUMENT DEVELOPMENT FLOW 23 APPENDIX C DATA REQUIREMENTS LIST DEVELOPMENT FLOW FOR NASA ACTIVITY 24 APPENDIX D STANDARD DRD DEVELOPMENT .25 APPENDIX Z GUIDANCE 26 Z.1 DRL Template With Sample Data and Preparation Instructions.26 Z.2 Sample Contracting Officers Letter28 Provided by IHSNot for
15、 ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Work Instruction ED01 Data Requirements MWI 7120.2 Revision: C Identification/Definition Date: February 4, 2009 Page 4 of 29 CHECK THE MASTER LIST at: https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY
16、 THAT THIS IS THE CORRECT VERSION BEFORE USE 1. PURPOSE The purpose of this Marshall Work Instruction (MWI) is to establish detailed instructions for identification and definition of data requirements for Center institutional activities and programs/projects in accordance with MPR 7120.3, “Data Mana
17、gement, Programs/Projects,” for Marshall Space Flight Center (MSFC) Data Management. 2. APPLICABILITY 2.1 This MWI applies to the personnel, programs, projects, and activities at MSFC and MSFCs Michoud Assembly Facility, including contractors and resident agencies to the extent specified in their re
18、spective contracts or agreements. (“Contractors,” for purposes of this paragraph, include contractors, grantees, Cooperative Agreement recipients, Space Act Agreement partners, or other agreement parties.) 2.2 Data may be generated by and/or acquired from contractors, principal investigators, in-hou
19、se MSFC organizations, other National Aeronautics and Space Administration (NASA) centers, or other Government organizations. 3. APPLICABLE DOCUMENTS a. NPR 1441.1, “NASA Records Retention Schedules (NRRS)” b. MPR 1440.2, “MSFC Records Management Program” c. MPR 7120.3, “Data Management, Programs/Pr
20、ojects” d. MPR 8040.1, “Configuration Management, MSFC Programs/Projects” e. Federal Acquisition Regulation (FAR), Clause 52.227-16, “Additional Data Requirements” 4. REFERENCES None 5. DEFINITIONS 5.1 Center Data Requirements Manager (CDRM). A specific organization or individual appointed to carry
21、out the Centers responsibility for development and maintenance of Center data requirements. The CDRM has the requisite authority to coordinate internal MSFC data requirement activities. 5.2 Contract. A mutually binding legal relationship obligating the seller to furnish the supplies or services (inc
22、luding construction) and the buyer to pay for them. It includes all types of Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Work Instruction ED01 Data Requirements MWI 7120.2 Revision: C Identification/Definition Date: February 4, 2009 Page
23、 5 of 29 CHECK THE MASTER LIST at: https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE commitments that obligate the Government to an expenditure of appropriated funds and that, except as otherwise authorized, are in writing. 5.3 Contractor. A
24、n entity (i.e., individual, partnership, company, corporation, or association) having a product or services contract with a procuring activity. 5.4 Control Process for NASA-Produced or External Agreement Data Deliverables. Indicates the level of control that the requiring organization has assigned t
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- MSFCNASAMWI71202REVC2009DATAREQUIREMENTSIDENTIFICATIONDEFINITION 数据 要求 识别 定义 PDF

链接地址:http://www.mydoc123.com/p-822909.html