MSFC NASA MPR 8820 1 REV D-2008 FACILITY PROJECT PLANNING PROCESS《设施项目规划过程》.pdf
《MSFC NASA MPR 8820 1 REV D-2008 FACILITY PROJECT PLANNING PROCESS《设施项目规划过程》.pdf》由会员分享,可在线阅读,更多相关《MSFC NASA MPR 8820 1 REV D-2008 FACILITY PROJECT PLANNING PROCESS《设施项目规划过程》.pdf(12页珍藏版)》请在麦多课文档分享上搜索。
1、CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE MPR 8820.1 REVISION D EFFECTIVE DATE: November 6, 2008 EXPIRATION DATE: November 6, 2013 MARSHALL PROCEDURAL REQUIREMENTS AS01 FACILITY PROJECT PLANNING PROCESS Provi
2、ded by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Procedural Requirements AS01 Facility Project Planning Process MPR 8820.1 Revision: D Date: November 6, 2008 Page 2 of 12 CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/directives/directiv
3、es.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE DOCUMENT HISTORY LOG Status (Baseline/ Revision/ Canceled) Document Revision Effective Date Description Baseline 2/6/02 Revision A 9/27/2004 Converted from Marshall Procedures and Guidelines (MPG) to Marshall Procedural Requirements (MPR) doc
4、ument and changed references to MPR and NPR throughout the document. Requirements distinguished by use of the word “shall.” Changed footer to reflect current URL and changed font to Times New Roman. Document also reflects minor editorial changes. Revision B 8/10/2005 Revised to reflect organizationa
5、l changes. Revision C 2/12/2007 Reflects minor editorial changes and a grammatical change in subparagraph 3.2.4 from “S&MA Contact” in lieu of “S&MA Contract.” Also, added retention schedule for the 4. RECORDS. Revision D 11/6/2008 Revised applicability statement and referenced document titles, as w
6、ell as minor editorial changes. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Procedural Requirements AS01 Facility Project Planning Process MPR 8820.1 Revision: D Date: November 6, 2008 Page 3 of 12 CHECK THE MASTER LIST at https:/reposit
7、ory.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE TABLE OF CONTENTS Preface P.1 Purpose P.2 Applicability P.3 Authority P.4 Applicable Documents P.5 References P.6 Cancellation Document Content 1. Definitions 2. Responsibilities 3. Procedure 4. Records 5.
8、 Flow Diagram Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Procedural Requirements AS01 Facility Project Planning Process MPR 8820.1 Revision: D Date: November 6, 2008 Page 4 of 12 CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/
9、directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE PREFACE P.1 PURPOSE The purpose of this Marshall Procedural Requirement (MPR) is to define the methods and responsibilities for facility project planning by the Marshall Space Flight Center (MSFC). P.2 APPLICABILITY a. This
10、 MPR applies to the personnel, programs, projects, and activities at Marshall Space Flight Center (MSFC) and MSFCs Michoud Assembly Facility (MAF), including contractors and resident agencies to the extent specified in their respective contracts or agreements. (Contractors,” for purposes of this par
11、agraph, include contractors, grantees, Cooperative Agreement recipients, Space Act Agreement partners, or other agreements parties.) b. This MPR applies to facility planning activities performed at or under the direction of MSFC for projects exceeding local approval authority. P.3 AUTHORITY None P.4
12、 APPLICABLE DOCUMENTS a. NPR 1441.1, “NASA Records Retention Schedules (NRRS)” b. NPR 8820.2, “Facility Project Requirements” c. MPD 1280.1, “Marshall Quality Management System Manual” d. MPR 1410.2, “Marshall Management Directives System” e. MPR 1440.2, “MSFC Records Management Program” f. MPR 8823
13、.1, “Design Control of Facilities” P.5 REFERENCES None Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Marshall Procedural Requirements AS01 Facility Project Planning Process MPR 8820.1 Revision: D Date: November 6, 2008 Page 5 of 12 CHECK THE MASTER
14、 LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE P.6 CANCELLATION MPR 8820.1C dated February 12, 2007 Original signed by David A. King Director Provided by IHSNot for ResaleNo reproduction or networking permitted without license fr
15、om IHS-,-,-Marshall Procedural Requirements AS01 Facility Project Planning Process MPR 8820.1 Revision: D Date: November 6, 2008 Page 6 of 12 CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE DOCUMENT CONTENT 1. DEFI
16、NITIONS 1.1 Facility. Land, buildings, structures, and other real property improvements including utility systems and collateral equipment. The term does not include operating materials, supplies, special tooling, special test equipment, flight hardware, and noncapitalized equipment. The term facili
17、ty is used in connection with land, buildings (facilities having the basic function to enclose usable space), structures (facilities having the basic function of a research or operational activity), and other real property improvements. 1.2 Output User. The MSFC or contractor organization recognized
18、 as the beneficiary of the planning output. 1.3 Planning Input. Functional, special, and time requirements including budgetary requirements, if applicable. These are normally the users requirements. 1.4 Planning Organization. The MSFC or contractor organization responsible for facility planning. 1.5
19、 Planning Output. Result of the planning process such as requirements for design and the 5-year Construction of Facilities (CoF) plan. The planning output is the resulting product of a completed work action. The planning output is used to establish the product users requirements for design, which co
20、nstitutes part of the input for MPR 8823.1. 1.6 Planning Process. A systematic approach to evaluating/analyzing facilities issues and user-stated needs leading to the development of (planning output) requirements definition, recommendations to management, and implementation strategies. 1.7 Planning
21、Review/Verification. Confirmation by examination of objective evidence that specified requirements for the planning product has been fulfilled during the planning process. Planning review/verification is performed at the appropriate stages of planning. 1.8 Planning Validation. Confirmation by examin
22、ation of objective evidence that specified requirements for the planning output/product are fulfilled. Planning validation is performed after completion of planning process. 2. RESPONSIBILITIES 2.1 Output user responsibilities include: Provided by IHSNot for ResaleNo reproduction or networking permi
23、tted without license from IHS-,-,-Marshall Procedural Requirements AS01 Facility Project Planning Process MPR 8820.1 Revision: D Date: November 6, 2008 Page 7 of 12 CHECK THE MASTER LIST at https:/repository.msfc.nasa.gov/directives/directives.htm VERIFY THAT THIS IS THE CORRECT VERSION BEFORE USE 2
24、.1.1 User shall request facility project planning services from the planning organization. Planning requests are documented by memorandum, MSFC Form 199 (Facilities Work Request, FWR), or other approved forms. 2.1.2 User shall provide documented and detailed functional, special, and time requirement
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- MSFCNASAMPR88201REVD2008FACILITYPROJECTPLANNINGPROCESS 设施 项目 规划 过程 PDF

链接地址:http://www.mydoc123.com/p-822888.html