ISA 77 20 01-2012 Fossil Fuel Power Plant Simulators Functional Requirements《火力发电厂 功能要求》.pdf
《ISA 77 20 01-2012 Fossil Fuel Power Plant Simulators Functional Requirements《火力发电厂 功能要求》.pdf》由会员分享,可在线阅读,更多相关《ISA 77 20 01-2012 Fossil Fuel Power Plant Simulators Functional Requirements《火力发电厂 功能要求》.pdf(42页珍藏版)》请在麦多课文档分享上搜索。
1、 STANDARD ANSI/ISA77.20.01-2012 Fossil Fuel Power Plant Simulators: Functional Requirements Revised 9 February 2012Copyright 2012 ISA. All rights reserved. ANSI/ISA-77.20.01-2012 Fossil-Fuel Power Plant Simulators Functional Requirements ISBN 978-1-937560-16-4 Copyright 2012 by ISA. All rights reser
2、ved. Printed in the United States of America. No part of this publication may be reproduced, stored in a retrieval system, or transmitted in any form or by any means (electronic, mechanical, photocopying, recording, or otherwise), without the prior written permission of the publisher. ISA 67 Alexand
3、er Drive P.O Box 12277 Research Triangle Park, North Carolina 27709 www.isa.orgANSI/ISA-77.20.01-2012 Copyright 2012 ISA. All rights reserved. 3 Preface This preface, as well as all footnotes and annexes, is included for information purposes and is not part of ANSI/ISA-77.20.01-2012. This document h
4、as been prepared as part of the service of ISA toward a goal of uniformity in the field of instrumentation. To be of real value, this document should not be static but should be subject to periodic review. Toward this end, the Society welcomes all comments and criticisms and asks that they be addres
5、sed to the Secretary, Standards and Practices Board; ISA; 67 Alexander Drive; P. O. Box 12277; Research Triangle Park, NC, 27709; Telephone (919) 549-8411; Fax (919) 549-8288; E-mail: standardsisa.org. The ISA Standards and Practices Department is aware of the growing need for attention to the metri
6、c system of units in general, and the International System of Units (SI) in particular, in the preparation of instrumentation standards. The Department is further aware of the benefits to USA users of ISA standards of incorporating suitable references to the SI (and the metric system) in their busin
7、ess and professional dealings with other countries. Toward this end, this Department will endeavor to introduce SI-acceptable metric units in all new and revised standards, recommended practices, and technical reports to the greatest extent possible. Standard for Use of the International System of U
8、nits (SI): The Modern Metric System, published by the American Society for Testing b) feedwater flow to steam flow; and c) main and auxiliary steam systems. 3) As a minimum, the simulator-computed value of critical parameters for steady-state, full power operation with the reference plant control sy
9、stem configuration shall be stable and shall not vary more than 2% of the measuring instrument range as observed in the reference plant. Consideration should be given to specifying the allowable deviation of individual critical parameters in process units. 4) The simulator-computed values of critica
10、l parameters shall agree within 2% of the reference plant parameters explicitly stated in process units at greater than 25% load and shall not detract from training. Typical critical parameters are defined in 6.1.1. 5) The calculated values of noncritical parameters pertinent to plant operation, tha
11、t are included on the simulator control room panels, shall agree within the ranges of 10% of the reference plant parameters and shall not detract from training. 6.1.1 Critical parameters Critical parameters are those related to plant principles of energy and mass balance. Typical critical parameters
12、 are as follows: 1) Main steam flow and pressure 2) Feedwater flow 3) Generated electrical power 4) Process steam flows, LP, IP, and HP 5) Superheat and reheat spray flow 6) Superheat outlet temperature and pressure 7) HP turbine inlet temperature and pressure 8) HP turbine first-stage pressure 9) H
13、ot reheat temperature and pressure at the reheater outlet 10) Condenser pressure 11) Fuel flow 12) Combustion air flow Consideration should be given to other parameters, such as environmental parameters. ANSI/ISA-77.20.01-2012 Copyright 2012 ISA. All rights reserved. 16 6.2 Transient operations Tran
14、sient operations include malfunctions, abnormal operations, and any non-steady-state plant condition. Simulation performance under transient conditions shall meet the following criteria: 1) Where applicable, it shall be the same as the plant start-up test procedure acceptance criteria. 2) The observ
15、able change in the parameters shall correspond in direction to those expected from a best estimate for the simulated transient and shall not violate the physical laws of nature. 3) The simulator shall not fail to cause an alarm or automatic action if the reference plant would have caused an alarm or
16、 automatic action, and, conversely, the simulator shall not cause an alarm or automatic action if the reference plant would not have caused an alarm or automatic action. 4) The overall system transient characteristics time shall be within 20% of the reference plant when under the same operating cond
17、itions. Malfunctions and transients not tested in accordance with 1- 4 shall be tested and compared to best estimate or other available information and shall meet the performance criteria of 2. 7 Simulator testing 7.1 Simulator performance testing Simulator performance shall be established by prepar
18、ing a simulator performance test, conducting the test, and comparing the simulators performance with the simulator design data within the requirements of Section 6, Performance criteria. Testing shall be conducted and a report prepared for each of the following occasions: 1) Completion of initial co
19、nstruction 2) Simulator design changes that result in significant simulator configuration or performance variations. When a limited change is made, a specific performance test on the affected systems and components shall be performed. The intent of simulator performance testing is to: a) verify over
20、all simulator model completeness and integration; b) verify simulator performance against the steady-state criteria of 6.1 (Steady-state operation); and c) verify simulator performance against the transient criteria of 6.2 (Transient operations) for a benchmark set of transients. 7.2 Simulator hardw
21、are testing Simulator hardware testing shall include all trainee environments provided by the simulator. These are: 1) Panel/control station simulation: a) control and piping mimics; b) location and spacing of control panels; and c) size, shape, and configuration of panel/control panels. 2) Control
22、of the panels: a) identification labels on meters, recorders, switches, controllers, etc.; b) annunciator labeling and terminology; and c) form and units of displayed plant information. 3) Control room environment: a) location and availability of plant communication systems; b) location and intensit
23、y of control room lighting; and c) type and level of noise for the plant equipment. ANSI/ISA-77.20.01-2012 Copyright 2012 ISA. All rights reserved. 17 7.3 Simulator system testing Simulator system testing shall include all provided simulator system training capabilities as well as computer performan
24、ce. These include the following: 1) Simulator control features: a) Run/freeze simulator models b) Initialization of initial conditions c) Inserting and removing malfunctions d) Manipulating external parameters and remote functions e) Backtrack f) Record and playback g) Snapshot h) Slow time i) Fast
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ISA7720012012FOSSILFUELPOWERPLANTSIMULATORSFUNCTIONALREQUIREMENTS 火力发电厂 功能 要求 PDF

链接地址:http://www.mydoc123.com/p-789791.html