GMW GMW3191-2012 Connector Test and Validation Specification Issue 2 English [Replaced GME QT 126595 GME QT 126595].pdf
《GMW GMW3191-2012 Connector Test and Validation Specification Issue 2 English [Replaced GME QT 126595 GME QT 126595].pdf》由会员分享,可在线阅读,更多相关《GMW GMW3191-2012 Connector Test and Validation Specification Issue 2 English [Replaced GME QT 126595 GME QT 126595].pdf(79页珍藏版)》请在麦多课文档分享上搜索。
1、 WORLDWIDE ENGINEERING STANDARDS General Specification GMW3191 Connector Test and Validation Specification Copyright 2012 General Motors Company All Rights Reserved June 2012 Originating Department: North American Engineering Standards Page 1 of 79 1 Introduction. 6 1.1 Scope. 6 1.2 Mission/Theme. .
2、 6 1.3 Classification. 6 2 References . 6 2.1 External Standards/Specifications. 6 2.2 GM Standards/Specifications. . 6 2.3 Additional References. 6 3 Test Preparation and Evaluation 6 3.1 Resources. 6 3.1.1 Calibration. 6 3.1.2 Alternatives. 6 3.1.3 Facilities. . 6 3.1.4 Equipment. 6 3.1.5 Test Veh
3、icle/Test Piece. . 6 3.1.6 Test Time 7 3.1.7 Test Required Information. . 7 3.1.8 Personnel/Skills. . 7 3.2 Preparation. . 7 3.2.1 Conditioning. . 7 Figure 1: Terminal Conditioning 7 3.3 Conditions. . 7 3.3.1 Environmental Conditions . 8 3.3.2 Test Conditions . 8 3.4 Instructions. . 8 3.4.1 Visual E
4、xamination. 8 3.5 Data . 8 3.6 Safety. 8 3.7 Documentation 8 3.7.1 Test Results. . 8 3.7.2 Deviations from Test Procedure. 9 3.8 Test Tolerances. 9 Copyright General Motors Company Provided by IHS under license with General Motors CompanyNot for ResaleNo reproduction or networking permitted without
5、license from IHS-,-,-GM WORLDWIDE ENGINEERING STANDARDS GMW3191 Copyright 2012 General Motors Company All Rights Reserved June 2012 Page 2 of 79 3.8.1 Default Tolerances. . 9 Table 1: Parameters and Tolerances 9 4 Requirements and Procedure 9 4.1 Classification. 9 4.1.1 Temperature Class . 9 Table 2
6、: Temperature Class (T) 10 4.1.2 Vibration Class. . 10 Table 3: Vibration Class (V) 10 4.1.3 Sealing Class. . 10 Table 4: Sealing Class (S) 10 4.1.4 Connector Mating Force Class. 10 Table 5: Connector Mating Force Class (M) . 11 4.1.5 Test Procedures and Sequences . 11 4.2 Mechanical Tests. 11 4.2.1
7、 Crack Corrosion. . 11 4.2.2 Crimp Weld Integrity. 11 4.2.3 Terminal-to-Terminal Engagement Force. 12 4.2.4 Terminal-to-Connector Engagement Force. . 12 4.2.5 Terminal-from-Connector Extraction Force. . 13 Table 6: Minimum Extraction Force Terminal from Connector Cavity . 14 4.2.6 Terminal Cavity Po
8、larization. 14 4.2.7 Terminal Bend Resistance. . 15 Figure 2: Terminal Design Style 16 Figure 3: Terminal Bend Test 16 Table 7: Terminal Size and Applied Bending Force 16 4.2.8 Connector-to-Connector Engagement Force. 16 4.2.9 Terminal Position Assurance (TPA). . 17 Table 8: TPA Removal Force Table
9、18 4.2.10 Lever and Slide Open Position Retention. 18 Figure 4: Retention of Slide in the Open Position . 19 4.2.11 Mechanical Assist Integrity. 19 Figure 5: Side Force Strength . 20 4.2.12 Connector Mounting Feature Mechanical Strength. . 20 Figure 6: Connector Mounting Fixture Strength Example . 2
10、1 Figure 7: Connector Mounting Fixture Strength Test Setup, 3-Dimensional View . 21 Figure 8: Connector Mounting Fixture Strength Test Setup, End View 22 Figure 9: Connector Mounting Fixture Strength Test Setup, Side View . 22 4.2.13 Connector Audible Feedback. 22 4.2.14 Connector Lock Mechanical Ov
11、erstress. 23 Copyright General Motors Company Provided by IHS under license with General Motors CompanyNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-GM WORLDWIDE ENGINEERING STANDARDS GMW3191 Copyright 2012 General Motors Company All Rights Reserved June 2012 Pag
12、e 3 of 79 4.2.15 Connector Position Assurance (CPA). 23 4.2.16 Connector Seal Retention - Mated Connector. . 24 4.2.17 Connector Seal Retention - Unmated Connector. 24 Figure 10: Unmated Connector Seal Test 25 4.2.18 Locked Connector Disengagement Force. . 25 Table 9: Locked Connector Disengage Forc
13、e 25 4.2.19 Unlocked Connector Disengagement Force. 25 4.2.20 Connector Polarization (Coding) Feature Effectiveness. 26 4.2.21 Mechanical Shock. 27 Figure 11: Series Circuit Monitoring 28 Figure 12: Vibration Mounting Fixture . 29 Table 10: Mechanical Shock . 29 Figure 13: Continuity Loss 30 Figure
14、14: Continuity Loss for SIR Connectors . 30 4.3 Electrical Tests. . 30 4.3.1 Maximum Current Rating. . 30 Figure 15: Draft-Free Enclosure 31 Figure 16: Base Curve 32 Figure 17: Derating Curve . 33 4.3.2 Dry Circuit Resistance. . 33 Figure 18: In-Line Circuit Lead Location . 34 Table 11: Maximum Resi
15、stance Values 34 4.3.3 Voltage Drop. 35 Figure 19 - Terminal Insertion . 35 Figure 20: Current Resistance Test Setup 36 Figure 21: Typical Connection Resistance Millivolt Lead Locations . 36 4.3.4 1008-Hour Current Cycling. 37 4.3.5 Isolation Resistance. . 38 4.3.6 Dielectric Strength. 38 4.4 Enviro
16、nmental Tests. . 39 4.4.1 Thermal Aging. 39 4.4.2 Thermal Shock. . 40 4.4.3 Humid Heat Cyclic (HHC). 41 Table 12: Cyclic Humidity Requirements 41 Figure 22: Cyclic Humidity Profile . 42 Table 13: Cyclic Humidity Profile 43 4.4.4 Humid Heat Constant (HHCO). 43 Table 14: Constant Humidity Requirements
17、 . 44 4.4.5 Heavy Duty Test. 44 Copyright General Motors Company Provided by IHS under license with General Motors CompanyNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-GM WORLDWIDE ENGINEERING STANDARDS GMW3191 Copyright 2012 General Motors Company All Rights Res
18、erved June 2012 Page 4 of 79 4.4.6 Flammability. . 45 4.4.7 Corrosion. . 45 4.4.8 Vibration with Thermal Cycling. 46 Figure 23: Thermal Cycle 47 Table 15: Thermal Cycle Requirements . 47 Figure 24: Body (Sprung Masses) Random Vibration Schedule 47 Table 16: Body (Sprung Masses) Random Vibration Sche
19、dule . 48 Figure 25: Engine Mounted Sinusoidal Vibration Cycle (based on ISO 16750-3) 48 Table 17: Engine Mounted Sinusoidal Vibration Cycle (based on ISO 16750-3) . 48 Figure 26: Engine Mounted Random Vibration Cycle (based on ISO 16750-3) . 49 Table 18: Engine Mounted Random Vibration Cycle (based
20、 on ISO 16750-3) 49 Figure 27: Wheel Random Vibration Cycle . 50 Table 19: Wheel Random Vibration Cycle 50 Figure 28: Severe Applications Sinusoidal Vibration (based on ISO 16750-3) 51 Table 20: Severe Sinusoidal Vibration (based on ISO 16750-3) 51 Figure 29: Severe Random Vibration Cycle (based on
21、ISO 16750-3) 52 Table 21: Severe Random Vibration Cycle (Severe Applications; based on ISO 16750-3) . 52 Table 22: Generic Vibration Profiles for Transmissions (12 to 20 000) Hz . 53 4.4.9 Water Submersion. . 53 Figure 30: Water Submersion Setup . 54 4.4.10 Pressure/Vacuum Leak. . 54 4.4.11 High Pre
22、ssure Spray. 56 Figure 31: Nozzle and Jet Dimensions . 57 Table 23: Spray Pattern 57 Figure 32: High Pressure Spray Test Arrangement 58 4.4.12 Fluid Resistance. 58 Table 24: Fluids . 60 4.5 Miscellaneous Tests. . 60 4.5.1 Resistance of Short Circuit Devices. 60 Figure 33: Electrical Resistance of Sh
23、orting Bars . 61 4.5.2 Terminal Push-out Force. . 61 Table 25: Push-out Force 62 4.6 Further Requirements. . 62 4.6.1 Test Sequences 62 Table 26: Terminal Mechanical Tests . 63 Table 27: Terminal Electrical Tests . 64 Table 27: Terminal Electrical Tests (continued) 65 Table 28: Connector Mechanical
24、Tests 66 Table 28: Connector Mechanical Tests (continued) . 67 Copyright General Motors Company Provided by IHS under license with General Motors CompanyNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-GM WORLDWIDE ENGINEERING STANDARDS GMW3191 Copyright 2012 Genera
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GMWGMW31912012CONNECTORTESTANDVALIDATIONSPECIFICATIONISSUE2ENGLISHREPLACEDGMEQT126595GMEQT126595PDF

链接地址:http://www.mydoc123.com/p-758010.html