GMW GMW16580-2011 Thermal Bypass Valve Validation Test Issue 1 English《热的旁通阀验证试验 第1次出版(英文版本)》.pdf
《GMW GMW16580-2011 Thermal Bypass Valve Validation Test Issue 1 English《热的旁通阀验证试验 第1次出版(英文版本)》.pdf》由会员分享,可在线阅读,更多相关《GMW GMW16580-2011 Thermal Bypass Valve Validation Test Issue 1 English《热的旁通阀验证试验 第1次出版(英文版本)》.pdf(18页珍藏版)》请在麦多课文档分享上搜索。
1、 WORLDWIDE ENGINEERING STANDARDS General Specification GMW16580 Thermal Bypass Valve Validation Test Copyright 2011 General Motors Company All Rights Reserved August 2011 Originating Department: North American Engineering Standards Page 1 of 18 1 Introduction Note: Nothing in this standard supercede
2、s applicable laws and regulations. Note: In the event of conflict between the English and domestic language, the English language shall take precedence. 1.1 Scope. This specification defines the Design Validation (DV), Product Validation (PV), and Post Validation Audit (PVA) requirements for a mecha
3、nical Thermal Bypass Valve (TBV). 1.2 Mission/Theme. Not applicable. 1.3 Classification. Not applicable. 2 References Note: Only the latest approved standards are applicable unless otherwise specified. 2.1 External Standards/Specifications. ASTM B221 SAE J1344 2.2 GM Standards/Specifications. 998633
4、3 GMW8758 GMW14872 GMW15758 GMW3059 GMW14156 GMW15272 GMW15760 GMW3172 GMW14157 GMW15724 GMW16449 2.3 Additional References. GM1829 Analysis Development Validation (ADV) Test Plan 3 Requirements 3.1 System/Subsystem/Component/Part Definition. The Thermal Bypass Valve regulates oil flow to the remote
5、 located cooler in order to control the operating temperature of the transmission. In a cold state, a thermally actuated valve contained inside the bypass housing will allow the oil to short circuit the transmission oil cooler (TOC). In a predetermined hot state, the valve closes off the bypass and
6、forces all the oil to go through the TOC which, in turn, will regulate the oil temperature of the transmission. 3.1.1 Appearance. Not applicable. 3.1.2 Content. Not applicable. 3.1.2.1 Physical Content. Not applicable. 3.1.2.2 Functional Content. Not applicable. 3.1.3 Ambient Environment. The TBV po
7、tentially could be located under the hood of a vehicle. The TBV may be exposed to temperatures from -40 C to 150 C and subject to salt mist and water splash. 3.1.4 Interfaces. Approved GM quick connect fittings and/or directly to steel or aluminum tubes. 3.1.5 Usage Definition. The TBV will be locat
8、ed in the underbody and will be exposed to fluids in GMW16449 (see Appendix A - “Fluid Applicability Per Vehicle Location” table). 3.2 Product Characteristics. 3.2.1 Performance Requirements. Test fluid used during each test shall be 9986333 (ATF-212B) transmission fluids or a program specific fluid
9、 as specified by GM Engineering in the Component Technical Specification (CTS) provided. Ultraviolet dye shall be added to the test fluid prior to testing. All pipe connections on the TBV must be approved by GM Engineering and meet requirements of GMW15724. Copyright General Motors Company Provided
10、by IHS under license with General Motors CompanyNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-GM WORLDWIDE ENGINEERING STANDARDS GMW16580 Copyright 2011 General Motors Company All Rights Reserved August 2011 Page 2 of 18 3.2.1.1 Fixed-Value Performance Testing Re
11、quirements. The following tests (excluding Cleanliness Test and Burst Test) shall be conducted both before and after the tests in 3.2.1.2 Endurance Testing Requirements. In pre-tests, the TBVs shall meet the requirements for each test as described in the procedures and the CTS. In post-tests, the TB
12、Vs still must meet the requirements for each test as described in the procedures and the CTS, and shall not have degraded in performance by more than 5% from the initial pre-test measurement. 3.2.1.1.1 Pressure Drop Tests. The TBV shall have a maximum pressure drop of 50 kPa when oil at 5 C below th
13、e start to open temperature is flowed at 11 L/minute through the device (4.3.2). The TBV shall have a maximum pressure drop of 25 kPa when oil at Full Open (FO) +10 C is flowed at 11 L/minute through the valve (4.3.2). 3.2.1.1.2 Leakage Test. 3.2.1.1.2.1 Internal Leakage. The TBV internal leakage pa
14、st the sealing feature shall not exceed 0.3 L/minute with fluid flowing at 12 L/minute at 1000 kPa and the following valve positions: Full Open (FO) with fluid temperature at FO +10 C and Full Closed (FC) with fluid temperature at FC -10 C when tested (4.3.3.1). Full Open (FO) and Full Closed (FC) r
15、equirements shall be defined as according to the CTS. 3.2.1.1.2.1.1 Internal Leakage (In-process Check). The TBV internal leakage past the sealing feature shall not exceed 0.05 L/minute when tested (4.3.3.1.1). 3.2.1.1.2.2 External Leakage. No external leakage of oil is permissible from the TBV asse
16、mbly including crimped/quick connect pipe interfaces when tested (4.3.3.2). (Refer to Table 3). 3.2.1.1.2.2.1 External Leakage (In-process Check). The leakage shall not exceed 200 L/minute when tested (4.3.3.2.1). 3.2.1.1.3 Hysteresis Test. The TBV must exhibit the hysteresis response defined in the
17、 CTS document (“Thermal Bypass Requirement” section) when tested (4.3.4). 3.2.1.1.4 Response Time Test. The FC -10 C position to FO +10 position shall be less than 45 s when tested (4.3.6) Thermal Durability Test. 3.2.1.1.5 Cleanliness Test. The total weight of contaminants shall not exceed 0.5 mg a
18、nd all dimensions of any piece of contaminant cannot exceed 0.5 mm when tested (4.3.1). 3.2.1.1.6 Burst Test. Minimum burst strength shall be no less than 6895 kPa when tested (4.3.5). 3.2.1.1.7 TBV Drop Test. The five (5) samples tested shall meet the requirements of all endurance and performance t
19、ests when tested (4.3.11). Each sample will then be tested in an endurance test leg shown in Appendix A. 3.2.1.1.8 TBV Assembly Drop Test. The five (5) samples tested shall meet the requirements of all endurance and performance tests when tested (4.3.12). Each sample will then be tested in an endura
20、nce test leg shown in Appendix A. 3.2.1.2 Endurance Testing Requirements. These requirements are subject to sample size and reliability requirements (3.2.3.2). 3.2.1.2.1 Thermal Durability Test. The TBV shall meet the pressure drop requirements (4.3.2), internal leakage requirements (4.3.3.1), exter
21、nal leakage requirements (4.3.3.2), and hysteresis requirements (4.3.4) after three (3) lives of 30 000 cycles each (4.3.6). 3.2.1.2.2 Thermal and Pressure Cycle Test. The TBV shall meet the pressure drop requirements (4.3.2), internal leakage requirements (4.3.3.1), external leakage requirements (4
22、.3.3.2), and hysteresis requirements (4.3.4) after 1000 cycles (4.3.7). 3.2.1.2.3 High Temperature Aging Test. The TBV shall meet the pressure drop requirements (4.3.2), internal leakage requirements (4.3.3.1), external leakage requirements (4.3.3.2), hysteresis requirements (4.3.4), and vibration r
23、equirements (4.3.10) after completion of high temperature aging test (4.3.8). 3.2.1.2.4 Corrosion Test. The valve assembly shall meet the Underbody Cosmetic and Functional corrosion requirements for Class 1/2 Regional Corrosion, per GMW15272. The valve shall meet Underhood Cosmetic Corrosion require
24、ments per GMW15272 (see Appendix A - “Cosmetic Corrosion Resistance Requirements” table), and GMW14872 (see Appendix A - “Mass Loss Targets (3.18 mm thick coupons) - Cosmetic and Functional” table) Underhood All Splash, Method 1/2 cosmetic and functional corrosion requirements. The valve assembly sh
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GMWGMW165802011THERMALBYPASSVALVEVALIDATIONTESTISSUE1ENGLISH 旁通 验证 试验 出版 英文 版本 PDF

链接地址:http://www.mydoc123.com/p-757793.html