GMW GMW15930-2013 Torque Tension Angle Evaluation of U-bolted Joints Issue 2 English.pdf
《GMW GMW15930-2013 Torque Tension Angle Evaluation of U-bolted Joints Issue 2 English.pdf》由会员分享,可在线阅读,更多相关《GMW GMW15930-2013 Torque Tension Angle Evaluation of U-bolted Joints Issue 2 English.pdf(13页珍藏版)》请在麦多课文档分享上搜索。
1、 WORLDWIDE ENGINEERING STANDARDS Test Procedure GMW15930 Torque, Tension, Angle Evaluation of U-bolted Joints Copyright 2013 General Motors Company All Rights Reserved July 2013 Page 1 of 13 1 Scope Note: Nothing in this standard supercedes applicable laws and regulations. Note: In the event of conf
2、lict between the English and domestic language, the English language shall take precedence. 1.1 Purpose. To determine the dynamic torque, tension, and angle characteristics of a U-bolted joint. 1.2 Foreword. 1.2.1 Limitation. This procedure does not apply to Pulse tools. 1.2.2 Unless otherwise speci
3、fied, any requirements or direction provided in the Test Request documentation will supercede this test procedure. 1.3 Applicability. Unless otherwise specified, this procedure applies to the initial tightening event of joints using threaded fasteners with new thread and bearing surfaces and new cla
4、mped members. 2 References Note: Only the latest approved standards are applicable unless otherwise specified. 2.1 External Standards/Specifications. None 2.2 GM Standards/Specifications. GMW15569 GMW16820 3 Resources 3.1 Facilities. GM approved laboratory or location for this test procedure. 3.1.1
5、Calibration. The test facilities and equipment shall be in good working order and shall have a valid calibration label. 3.1.2 Alternatives. Alternative test facilities and equipment may also be used. However, all measuring variables as specified in this standard shall be determined correctly with re
6、spect to their physical definition. 3.2 Equipment. 3.2.1 Torque/angle transducers (two per U-bolt). 3.2.2 Data acquisition system capable of collecting data at a sampling rate of at least 1000 Hz, plotting data at user specified scales, and identifying data at all points on the curve. 3.2.3 Strain g
7、aged U-bolts. 3.2.4 Tightening tools (two per U-bolt). 3.2.5 Load frame. 3.2.6 Strain indicator. 3.2.7 Appropriate fixturing, bedplate, or slotted table. 3.3 Test Vehicle/Test Piece. 3.3.1 A complete bill of materials of required test pieces will be specified in the Test Request documentation. 3.3.2
8、 Unless otherwise specified, a minimum of four joints are to be used for this test. 3.3.3 Typical component quantities may be: 3.3.3.1 Anchor plates: 4. Copyright General Motors Company Provided by IHS under license with General Motors CompanyNot for ResaleNo reproduction or networking permitted wit
9、hout license from IHS-,-,-GM WORLDWIDE ENGINEERING STANDARDS GMW15930 Copyright 2013 General Motors Company All Rights Reserved July 2013 Page 2 of 13 3.3.3.2 Spacers: 4. 3.3.3.3 U-bolts: 14. 3.3.3.4 Axles with spring seat: 4. 3.3.3.5 Leaf spring: 1. 3.3.3.6 Nuts and washers: 20. 3.4 Test Time. Cale
10、ndar time: 4 days Test hours: 120 hours Coordination hours: 40 hours 3.5 Test Required Information. Test Request documentation shall outline specific information and test parameters (reference Appendix B, Data Sheet B1, or use similar format). 3.6 Personnel/Skills. Test Technician shall be qualified
11、 on the basis of appropriate education, training, experience, and/or demonstrated skills. 4 Procedure Note: Any deviations to this procedure are to be entered in the Test Notes or Log Sheets. 4.1 Preparation. 4.1.1 U-bolt Load Deflection Test. 4.1.1.1 In order to establish a calibration value for st
12、rain gaged U-bolts, randomly select two U-bolts. 4.1.1.1.1 Perform U-bolt Saddle Tensile Test in accordance with GMW16820 while recording load and deflection. 4.1.1.1.2 Supply load vs. deflection curve. 4.1.1.1.3 Core hardness check (optional) can be also performed. 4.1.1.2 Select Calibration Load f
13、rom saddle tensile plot. Note: Plot depicts total load. Divide by two to obtain tensile load per U-bolt leg. Curve should be linear up to desired calibration load per U-bolt leg. 4.1.2 U-bolt Strain Gaging and Calibration. 4.1.2.1 Randomly select eight U-bolts and attach the required strain gages, f
14、ull bridge wired for axial loading with bending compensation. Reference U-bolt schematic for location of strain gages (Figure A1). 4.1.2.2 Install a U-bolt into the load frame using the load frame fixturing. 4.1.2.3 To ensure the U-bolt is centered on the fixture, run the two threaded adapters down
15、evenly until adequate engagement (minimum one U-bolt diameter from first full thread) is achieved. 4.1.2.3.1 If possible, the adapters should not be placed in the area where the nuts will reside upon final assembly. 4.1.2.3.2 The threads used to achieve the correct clamp should remain virgin. This i
16、s desirable because any change in the surface finish of the thread could affect the coefficient of friction. 4.1.2.4 Exercise the U-bolt by loading it to maximum calibration value and returning to zero load a minimum of three times. 4.1.2.5 Remove zero offset from strain gage if necessary. 4.1.2.6 M
17、easure strain gage output and calibration load cell values in at least five equally spread increments, from zero load to maximum calibration value, and from maximum value back to zero. 4.1.2.7 Repeat 4.1.2.6 two more times and average the data. 4.1.2.8 If calibration error is less than or equal to 2
18、.5% full scale, document the sensitivity, shunt calibration resistance, shunt calibration load values, excitation voltage and zero output voltage. 4.1.2.9 If calibration error is greater than 2.5%, repeat 4.1.2.5 through 4.1.2.7 until error of less than or equal to 2.5% is achieved. 4.1.2.10 If unab
19、le to satisfy calibration requirements within three calibration cycles, contact the requestor. Copyright General Motors Company Provided by IHS under license with General Motors CompanyNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-GM WORLDWIDE ENGINEERING STANDAR
20、DS GMW15930 Copyright 2013 General Motors Company All Rights Reserved July 2013 Page 3 of 13 4.2 Conditions. 4.2.1 Environmental Conditions. Not applicable. 4.2.2 Test Conditions. Deviations from the requirements of this standard shall have been agreed upon. Such requirements shall be specified on c
21、omponent drawings, test certificates, reports, etc. 4.3 Instructions. 4.3.1 Review part quantities and condition. 4.3.2 Secure test parts to T-slot table or fixture. 4.3.3 Select tightening tools and mount them in the tool holding fixture. 4.3.4 Synchronize all tools to tool speed requested and docu
22、ment free spinning speed. 4.3.5 Select strain gaged U-bolts and torque transducers with angle encoders. 4.3.6 Configure data acquisition system to collect torque, tension, and angle data for each spindle. 4.3.7 Obtain test parts and loosely assemble them (i.e., no load on U-bolts until after calibra
23、tion check). 4.3.8 Record calibration signal from instrumented U-bolts (no load applied). 4.3.9 (Optional). Apply minimum torque to all nuts in order to bring assembly together in a uniform manner and visually inspect to ensure that thread protrusion is approximately equal. 4.3.10 Unless otherwise s
24、pecified, test requestor is to approve the test setup. 4.3.11 Using multi-spindle setup, simultaneously torque nut on each U-bolt leg. 4.3.12 Joint shall be tightened to the specifications outlined in Test Request documentation. Test shutoff parameters may include but are not limited to: 4.3.12.1 Ma
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GMWGMW159302013TORQUETENSIONANGLEEVALUATIONOFUBOLTEDJOINTSISSUE2ENGLISHPDF

链接地址:http://www.mydoc123.com/p-757726.html