GMKOREA EDS-T-5425-2008 ANTENNA MODULE TEST PROCEDURE.pdf
《GMKOREA EDS-T-5425-2008 ANTENNA MODULE TEST PROCEDURE.pdf》由会员分享,可在线阅读,更多相关《GMKOREA EDS-T-5425-2008 ANTENNA MODULE TEST PROCEDURE.pdf(10页珍藏版)》请在麦多课文档分享上搜索。
1、GM DAEWOO Auto & Technology EDS Engineering, GM DAEWOO Auto & Technology Standards ANTENNA MODULE TEST PROCEDURE Do Not Use on New Programs. Being Replaced by GMW3172 EDS-T-5425 ISSUED DATE: 1998. 05. 30 REVISED DATE: 2008. 10. 21 VERSION: 3 (Superceded) EDS-T-5425ANTENNA MODULE TEST PROCEDURE PAGE:
2、 1/9 ISSUED DATE: 1998. 05. 30 REVISED DATE: 2008. 10. 21 VERSION: 3 GM DAEWOO Auto & Technology Note: This standard may be applied only for current project (incl. T255 Program). It is Superceded for all future projects and replaced by GMW3172. 1. PURPOSE This standard aims at correctly evaluating a
3、ntenna modules for vehicles manufactured by GMDAT. 2. SCOPE This standard applies to antenna modules (hereinafter called “modules“) used for vehicles manufactured by GMDAT. 3. DEFINITION OF TERMS 3.1. Antenna module: The antenna module means all types of amplifiers or matching devices used for the a
4、ntenna or receiver to enhance the reception capability of the antenna, and specifically refers to the active type antenna including the high frequency coaxial link line supplied together with the module. 4. TEST CONDITIONS 4.1. Standard test voltage Test voltage used for module performance and durab
5、ility test, which is specified in drawings or test specifications. Unless specified otherwise, test voltage shall be 14.00.2V. 4.2. Standard test condition Unless specified otherwise, test is conducted under the normal standard test condition specified in KS A006(Test Place Standard Condition). 4.3.
6、 Standard test signals The signal level applied from the signal generator to the module input terminal, it shall be 60fo . Unless specified otherwise, standard test signals shall be used for test. 5. NUMBER OF SAMPLES Unless specified otherwise, 13 samples shall be provided for both DVP and PVP. 6.
7、TEST EQUIPMENT 6.1. Generals Measuring instruments used for test shall basically be calibrated by the national calibration institute and within the effective calibration period. EDS-T-5425ANTENNA MODULE TEST PROCEDURE PAGE: 2/9 ISSUED DATE: 1998. 05. 30 REVISED DATE: 2008. 10. 21 VERSION: 3 GM DAEWO
8、O Auto & Technology 6.2. Radio Frequency Signal Generator Frequency range 10KHz to 1.6GHz, signal generation output min. +13dBm, permissible error within 0.1dB. 6.3. Network Analyzer Capable of vector analysis with frequency range 10KHz to 2.9GHz, permissible error within 1%. 6.4. Spectrum Analyzer
9、Capable of signal analysis with frequency range 10KHz to 2.9GHz, permissible error within 0.1dB. 6.5. Thermostatic chamber Capable of maintaining temperature from 40 to +90, it shall have a minimum capacity of 100 liter. It shall also be able to control relative humidity at each temperature to 95% w
10、ith permissible error not exceeding +2 per temperature. 6.6. Vibration tester It shall be capable of performing test to KS R 1034 (Automobile Components Vibration Test method). 6.7. Control device for durability test It shall be capable of automatically supply and cut-off voltage for module operatio
11、n, detect defects and record progress time and no. of cycles in durability test. 7. TEST PROCEDURES 7.1. Appearance test 7.1.1. Visual test (1) Conduct visual inspection. (2) When observed visually, the module shall show no sign of harmful flaws, cracks, or other defects that may adversely affect th
12、e performance. 7.1.2. Dimension test Specified samples based on KS B 5203 (Vernier calipers) shall be used. Samples shall meet material requirements of the deign specifications and dimensional requirements in drawings. 7.2. Performance 7.2.1. Current consumption (1) It is conducted with the standard
13、 voltage supplied. (2) Measurement shall be made separately for accessories power cables and battery power cables. (3) Unless specified otherwise, measured current consumption shall not exceed 80 v . 7.2.2. Leakage current (1) Measure at the battery cable at the standard test voltage. EDS-T-5425ANTE
14、NNA MODULE TEST PROCEDURE PAGE: 3/9 ISSUED DATE: 1998. 05. 30 REVISED DATE: 2008. 10. 21 VERSION: 3 GM DAEWOO Auto & Technology (2) It is conducted with the accessories power off. (3) Unless specified otherwise in drawings, the measured current shall not exceed 2 v . 7.2.3. Voltage gain (1) At opera
15、ting voltage of 9V 16V, electric performance requirements shall be met. (2) Unless specified otherwise, measure at three test voltage, 9V, 14V and 16V. (3) Test equipment shall conform to Attachment Fig 1 but the test engineer may construct it otherwise depending on the module operating principle. T
16、he equipment thus constructed shall be recorded together with test results. (4) Input/output ratio is measured with standard test signals. The absolute value of the voltage gain, which serves as standard, can be determined by agreement between the GMDAT design engineer, test engineer and module supp
17、lier as a result of vehicle development test. (5) Unless specified otherwise in drawings, permissible deviation of the measured value for the entire frequency range of the module shall not exceed 2f . 7.2.4. Intermodulation (1) Select any three frequencies in the module frequency range. (2) Have the
18、 selected reference frequency as the 1st reference signal and have the frequency at a point where frequency separation is +1 as the second reference signal. (3) Print out the measuring band of the signal analyzer in plotting paper based on the reference frequency 5 . (4) Construct test equipment as
19、in Attachment Fig 2. Raise the level of the first signal to the point where the 3rd intermodulation composite frequency becomes 60fo . Set the output of the 2nd signal same as the 1st reference signal. (5) Depending upon circumstances, measure the 3rd intermodulation composite frequency every 10fo f
20、rom 30 to 60fo . Unless specified otherwise, at a point where the 3rd intermodulation composite frequency becomes 60fo , the 1st and 2nd signals shall exceed 113fo . 7.2.5. Automatic gain controller (1) AGC : automatic gain controller (2) Construct test equipment as in Attachment Fig 2. Conduct meas
21、urement at the input terminal by gradually raising input signals from 60fo to 127fo . (3) Represent the input/output ratio in rectangular coordinates. (4) Depending upon circumstances, test may be conducted by momentarily changing input signal values, in which case test conditions shall be recorded.
22、 The test results may be used as reference data at the discretion of the test engineer. 7.3. Temperature test 7.3.1. Temperature operation gain deviation (1) Test temperature is based on the point reaching inside the unit, which is the same as exposure of the sample to test temperature for min. 1 ho
23、ur. (2) Select any 3 frequencies in the module frequency range. EDS-T-5425ANTENNA MODULE TEST PROCEDURE PAGE: 4/9 ISSUED DATE: 1998. 05. 30 REVISED DATE: 2008. 10. 21 VERSION: 3 GM DAEWOO Auto & Technology (3) Construct test equipment as in Attachment Fig 4. Under the conditions in the following tab
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GMKOREAEDST54252008ANTENNAMODULETESTPROCEDUREPDF

链接地址:http://www.mydoc123.com/p-757151.html