GME L-6A02-3-1999 Cylinder Distortion Measurement.pdf
《GME L-6A02-3-1999 Cylinder Distortion Measurement.pdf》由会员分享,可在线阅读,更多相关《GME L-6A02-3-1999 Cylinder Distortion Measurement.pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、 STD-OPEL LHE L-bA2-3-ENGL 1999 9 8597LL8 0030979 T97 m Test Procedure GME L-6A02-3 Cylinder Distortion Measurement Zylinderverzugsmessungen I Introduction Note: Nothing in the specification, however, supersedes applicable laws and regulations unless a specific exemption has been obtained. Note: In
2、the event of a conflict between the English and the domestic language, the English language shall take precedence. 1.1 Purpose. Determination of the affect on cylinder warpage of bolting cylinder headicylinder head gasket to engine block. I .2 Foreword. Not applicable 2 References Note: Only the lat
3、est approved standards are applicable unless otherwise specified. 2.1 Normative IS0 9001 3 Resources 3.1 Facilities. Facility for support of the cylinder block. 3.2 Equipment. - Wali distortior. line measuring instrument - Cylinder polar diagram measuring instrument suitable instrument: form measuri
4、ng machine by REMOG - Torque wranch, calibrated according to IS0 9001 3.3 Test Vehicle I Test Piece. Thefollowing engine parts are required for the test: - Cylinder block, new - Cylinder head, new - Cylinder head gasket, run-in or new - Cylinder head bolts, new 1 Einleitung Hinweis: Falls keine Ausn
5、ahmen vereinbart wurden, darf die Vorschrift keine anzuwendenden Gesetze und Regelungen auer Kraft setzen. Hinweis: Im Falle von Unstimmigkeiten zwischen dem englischen und dem landessprachlichen Text, ist der englische Text ausschlaggebend. 1,l Zweck. Ermittlung des Einflusses der Verschraubung Zyl
6、inderkopf/Zylinderkopfdichtung mit dem Motorblock auf den Zylinderverzug. 1.2 Vorwort. Nicht anwendbar 2 Referenzen Hinweis: Wenn nicht anders angegeben, ist jeweils die neueste Fassung der angegebenen Referenz gltig. 2.1 Normative IS0 9001 3 Gerte und Einrichtungen 3.1 Einrichtung. Einrichtung zur
7、Aufnahme des Zy!inderbiockss. 3.2 Ausrstung. - Meert zur Aufnahme der Zylinder- Mantellinien # - Megert zur Aufnahme der Zylinder- Polardiagrarnme geeignetes Megert: Formmemaschine Fa REMOG - Orehrnomentschlssel. geeicht nach IS0 9001 3.3 Versuchsfahrzeug I Probekrper. Folgende Motorteile werden fr
8、die Prfung benotigt: - Zylinderblock. neu - Zylinderkopf, neu - Zylinderkopfdichtung, gelaufen oder vorgesetzt - Zylinderkopfschrauben, neu O Copyright 1999 General Motors Corporation All Rights Resewed Originating Department: ITDC - Specification Center July 1999 Page 7 of 9 LBSP GME TP 1 11/96 ETD
9、OOPEL GME L-bA2-3-ENGL 1997 9 8597338 0030980 709 GM ENGINEERING STANDARD EUROPE GME L-6A02-3 4 Procedure 4.1 Preparation 4.1.1 The roughness of the cylinder head and cylinder block sealing surfaces shall be measured. The drawing specifications shall not be exceeded. 4.1.2 For all tests the main bea
10、ring bolts shall be tightened according to the information given on the drawing. Installation of the main bearing shells is not required. 4.2 Conditions 4.2.1 Environmental Conditions. Not applicable. 4.2.2 Test Conditions. Deviations from the requirements of this test procedure shall have been agre
11、ed upon. Such requirements shall be specified on component drawings. test certificates, reports etc. 4.3 Instructions 4.3.1 Warpage measurement in the following assembly conditions. 4.3.1.1 Tension-free cylinder block 4.3.1.2 Cylinder block and cvlinder head tensioned; tightening torque according to
12、 the information given on the drawing for tightening the cylinder head bolts when cold. 4.3.1.3 Bolt together cylinder block and cylinder head gasket. As in 4.3.1.2, tightening torques are according to drawing. A test shall be carried out to see if a rigidly designed timing case shall be fitted with
13、 gasket, as the cylinder warpage can be affected. 4.3.2 Bolt tightening. For the tests in paragraph 4.3.1, the cylinder head bolts shall be tightened in the order and to the tightening torque indicated on the drawing. The tightening torque of the cylinder head bolts and the designation of the assemb
14、ly tools shall be noted. 4 Durchfhrung 4.1 Vorbereitung 4.1 .I Die Rauhigkeit der Zylinderkopf- und Zylinderblock-Dichtungsflachen ist zu vermessen Die zulassigen Zeichnungsvorschriften durfen dabei nicht aberschritten werden 4.1.2 Bei allen Versuchen sind die Hauptiagerschrauben entsprechend der Ze
15、ichnungsangabe anzuziehen. Die Montage der Hauptlagerschalen erforderlich. 4.2 Bedingungen 4.2.1 Umgebungsbedingungen. Nicht anwendbar. 4.2.2 Prfbedingungen. Abweichungen Bedingungen dieser Test Procedure vereinbart werden. Diese Bedingungen Teilezeichnungen vorgeschrieben bzw. ist nicht von den mss
16、en sind auf mssen auf Prfreugnissen,- Berichten u. dergl. angegeben werden. 4.3 Prfanleitung 4.3.1 Verzugsrnessung bei folgenden Montagezustnde. 4.3.1.1 Zylinderblock ungespannt. 4.3.1.2 Zylinderblock und Zyiinderkopf gespannt Anzugsmoment entsprechend den Angaben zum Kaltanzug der Zylir,derkopfschr
17、auben nach Zeichung 4.3.1.3 Zylinderblock und Zylinderkopfdichtung verschrauben. Anzugsmomente wie 4.3.1.2 nach Zeichung. Es ist zu prfen, ob z. B. ein starr ausgefhrt& Steuergehuse mit Dichtung mit zu verschrauben ist. da ein Einflu auf den Zylinderverzuq vorliegen kann. 4.3.2 Schraubenanzug. Bei d
18、en Versuchen in Abschnitt 4.3.1 sind die Zylinderkopfschrauben in der laut Zeichnung festgelegten Reihenfolge und mit den dort festgelegten Anzugsmomenten anzuziehen Die Anzugsmomente der Zylinderkopfschrauben und die Bezeichnung der Montagewerkzeuge sind zu notieren. O Copyright 1999 General Motors
19、 Corporation All Rights Reserved July 1999 ?age 2 of 9 LBSP GME TP U 11/98 STD-OPEL GME L-bA2-3-ENGL 1777 8597318 0030981 b45 D GM ENGINEERING STANDARD EUROPE GME L-6A02-3 4.3.3 Measurement. For the assembly conditions listed in paragraph 4.3.1, records shall be made in the measurement levels indica
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GMEL6A0231999CYLINDERDISTORTIONMEASUREMENTPDF

链接地址:http://www.mydoc123.com/p-755677.html