GME 14441-2009 Fuse Protection Analysis.pdf
《GME 14441-2009 Fuse Protection Analysis.pdf》由会员分享,可在线阅读,更多相关《GME 14441-2009 Fuse Protection Analysis.pdf(2页珍藏版)》请在麦多课文档分享上搜索。
1、Test ProcedureLaboratory GME14441Fuse Protection AnalysisNote: This specification may be applied only for current projects incl. Global Epsilon (37#).It is Superceded for all future projects and replaced by GMW15950.1 IntroductionNote: Nothinginthisstandardsupersedesapplicablelaws and regulations.No
2、te: In the event of a conflict between the Eng-lish and the domestic language, the English languageshall take precedence.1.1 Purpose. The purpose of thistestisto determinethat the fuse protection in every vehicle circuit is ade-quate.1.2 Foreword. Every circuit in a vehicle is protected,electrically
3、, by either a fuse or fused link. This test willverify that if a problem were to occur in a circuit thatthe only component to suffer damage would be thefuse. Also check that the damaged fuse is the correctone according to drawing.1.3 Applicability. For all fuses used in a vehicle.1.4 Definitions. No
4、t applicable.2 ReferencesNote: Only the latest approved standards are appli-cable unless otherwise specified.None.3 Resources3.1 Facilities. Not applicable.3.2 Equipment.3.2.1 Volt Ohm meter.3.2.2 Wire jumpers capable of shorting various com-ponent connectors.3.2.3 Several replacement fuses of vario
5、us ratings.3.3 Test Vehicle / Test Piece. A maximum contentvehicle.3.4 Test Time. One or two days are required.3.5 Test Required Information. Vehicle wiring dia-grams.3.6 Personnel / Skills. Not applicable.4 Procedure4.1 Preparation.4.1.1 Ensure that the battery is fully charged.4.1.2 At this test t
6、he car is not started.4.1.3 A power supply unit shall be connected in par-allel to the car battery.4.1.4 The power supply voltage shall be regulated to12.0 V.4.1.5 Insert a high current switch between the batteryminus pole and the battery minus wire.4.2 Conditions.4.2.1 Environmental Conditions. Unl
7、ess otherwisespecified the test shall be performed at (+23 5) C.4.2.2 Test Conditions. Deviations from the require-ments of the test procedures shall have been agreedupon. Such requirements shall be specified on com-ponent drawings, test certificates, reports etc.4.3 Instructions.4.3.1 Ensure that t
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- GME144412009FUSEPROTECTIONANALYSISPDF
